Download CADE Storm Water Compliance Construction practice questions and answers exam. and more Exams Advanced Education in PDF only on Docsity! CADE Storm Water Compliance Construction practice questions and answers exam The Clean Water Act - >>>The 1970's law that set into place the regulation of storm water NPDES - >>>Requirements for managing storm water activity on a construction site are outlined in the following regulation Discharge From Contaminated Ground Water - >>>Never an allowable discharge from a construction site A notice of termination can be filed when? - >>>All construction activity, inside and outside of the building is complete. Permanent stabilization has been verified. The storm water notice of intent must be submitted? - >>>After the SWPPP is prepared and before starting construction. Potential pollutant sources stored on a construction site may include? - >>>Petroleum storage tanks, fertilizer, lime, and masonry materials. The SWPPP implementation sequence may be modified? - >>>After consulting with the project SWPPP designer (CEC) and if required, the project owner and receiving written approval. A SWPPP site map will show all of the following? - >>>Location of BMP's, Phasing & Sequence, Limits of Disturbance Which of the following information is to be posted at the entrance to the site? - >>>Construction site notice, permit authorization, location of SWPPP Which of the following is not a beneficial use water? - >>>Flushing water down a storm drain When installing and maintaining a check dam make sure...? - >>>The low point (overflow) of the check dam is in the middle of the channel To reduce the possibility of undercutting in channels, you should? - >>>Install filter fabric under rock & similar materials placed within the storm water conveyance. The good housekeeping section of the SWPPP must include? - >>>Hazardous waster management, solid waste, sanitary waste and disposal procedures. Runoff controls include? - >>>Diversions, check dams, slope drains Which erosion control best management practice increases water infiltration, dissipates rainfall energy, and slows overland flow of storm water? - >>>Vegetation The contractor has the most control over what erosion rate factor? - >>>Groundcover The primary purpose of a construction exit? - >>>To remove sediment from construction vehicles and minimize track out Temporary stabilization should be implemented when? - >>>Immediately on all disturbed areas that remain inactive for 14 days plus. Common types of erosion include? - >>>Gully, Sheet, and Rill Proper spill management should include all of the following? - >>>Fully stocked, proper location, signage, and labeling.