Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

2024/2025 CSX Conductor FINAL REVIEW Exam Questions With Verified Answers (TESTED, Exams of Transportation Engineering

2024/2025 CSX Conductor FINAL REVIEW Exam Questions With Verified Answers (TESTED AND PROVEN Who is Responsible for making Pay Claims? Ranking Employee or Employee to be paid What is the Hand Signal for Reduce Speed? Arm out horizontal over the track Which of the following are allowed by the Rulebook? Always take the safe course What is the Hand Signal for Release Air Brakes? Hand held overhead when Equipment is Standing Who authorizes a Utility Employee to join an Assigned Crew? Ranking Employee What is the normal position for a switch or derail? In the "on" or derailing position Before lining a switch or derail, an employee must? 1) Ensure that any preceeding movement has passed clearance points. 2) Ensure that the device is not locked, spiked, or tagged "out of service" If a lock is found to be defective or missing on a main line switch or derail an employee must? 1) Report device to Trainmaster/Dispatcher.

Typology: Exams

2023/2024

Available from 11/18/2024

mohh-wise
mohh-wise 🇺🇸

456 documents

1 / 21

Toggle sidebar

Related documents


Partial preview of the text

Download 2024/2025 CSX Conductor FINAL REVIEW Exam Questions With Verified Answers (TESTED and more Exams Transportation Engineering in PDF only on Docsity!

2024/2025 CSX Conductor FINAL REVIEW Exam Questions With Verified Answers (TESTED AND PROVEN Who is Responsible for making Pay Claims? What is the Hand Signal for Reduce Speed? Which of the following are allowed by the Rulebook? What is the Hand Signal for Release Air Brakes? Who authorizes a Utility Employee to join an Assigned Crew? What is the normal position for a switch or derail? If a lock is found to be defective or missing on a main line switch or derail an employee must? When an Employee determines that a switch or derail is defective, the employee must? You are standing in a yard using multiple switches on long shoves. After lining each switch an employee should check what?