Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

AATC TEST 3 STUDY GUIDE EXAM 100% VERIFIED ANSWERS 2024/2025 CORRECT, Exams of Organization and Business Administration

AATC TEST 3 STUDY GUIDE EXAM 100% VERIFIED ANSWERS 2024/2025 CORRECT

Typology: Exams

2024/2025

Available from 11/20/2024

darine-4
darine-4 🇺🇸

3.8

(11)

4K documents

1 / 8

Toggle sidebar

Related documents


Partial preview of the text

Download AATC TEST 3 STUDY GUIDE EXAM 100% VERIFIED ANSWERS 2024/2025 CORRECT and more Exams Organization and Business Administration in PDF only on Docsity!

AATC TEST 3 STUDY GUIDE

EXAM 100% VERIFIED

ANSWERS 2024/

CORRECT

The major areas (Sources) of risk in an acquisitions program strategies are technical, program and what? Business This technique compares planned or estimated values of designated performance parameters with achieved values as the parameter moves towards a goal. Technical performance measures Three risk consequence categories used during the MSA phase to analyze technical approaches. Cost, schedule, performance A technical performance measure's actual results are trending below the lower tolerance, this can ___ a system from being operational. Prevent Technical performance measures (TPM) are used to assess this risk category. Technical A ___ report is used to provide a snapshot of contracting, funding, expenditures, billings, and termination liability which relates EVM information to funding support information. Contracting Funds Status Report (CFSR) Lean manufacturing has two main principles minimize waste and ___.

Responsiveness to change Negative cost and schedule variance means the contractor is ___ budget and ___ schedule. Over, behind Cost Variance is positive, Schedule Variance is negative, Cost Performance Index (CPI) is 1.03, Schedule Performance Index (SPI) is 0.98 The appropriate cost and schedule status is___. Under budget, behind schedule, efficient on cost, inefficient on schedule This equation is used to determine cost variance. BCWP-ACWP Methods to control manufacturing costs include lean manufacturing, stability in the manufacturing process and ____. Reduction of variability in the production process This term describes a corporation that has the ability to perform multifunctional related work within the same production cell where one process is used for both commercial and defense customers. Single-Process Initiative In terms of quality, preventing failures should spend ___% of cost, correcting should spend ___% of the cost, and ___ should go towards appraisal. 50% preventing, 15% correcting, 35% appraisal The learning curve theory states that as the production of an item doubles the man-hours expended producing that item decreases at a fixed rate, this theory is used when ____. Cost estimated for quantities of systems to be produced Production and manufacturing account for approximately ___ of the life cycle costs for a system. 30%

Planning and documentation, ___, organizing and staffing, controlling risk, and leading are examples of acquisitions management tasks. Budgeting Three major DoD Decision making support systems in defense acquisition. JCIDS, DA, and PPBE PPB&E is the ____ in defense acquisition management. Resource allocation process The legal provision that requires that funds appropriated by congress be used only for the programs and purposes for which the appropriation is made, is known as____. Misappropriation act The acquisition program baseline is the agreement between these two parties and is used for tracking and reporting cost, schedule and performance data for the life of the program. Milestone Decision Authority (MDA) and the Program Manager (PM) A multidisciplinary group of people who are collectively responsible for deliver a defined product or process is a characteristic of this group. Integrated Product Team (IPT) The major defense wide appropriation categories are RDT&E, ___, ____, Military Personnel and operations and Maintenance, These categories are grouped funds that support areas of ____. Procurement, Military construction (MICON), interest Review , analysis, and assessment of data best describes this term in the T&E process. Evaluate These activities must be progressively integrated across all phases of the life cycle to define and balance system performance, life cycle cost, schedule, risk, and systems security. Systems engineering

This authority decides which offer to accept for the contract award. Source Selection Authority This document states that each Program Manager (PM) must prepare and the Milestone Decision Authority (MDA) must approve an Acquisition Strategy at Milestone (MS) A. DoDI 5000. The four main cost estimating techniques are , ____, engineering, and actual cost. The third technique is the most detailed estimating technique and the ___ costly to implement. Analogy, parametric, most Earned Value Management (EVM) is used to monitor program cost and schedule performance against a program baseline plan established by the contractor and the government at the beginning of the contract through the ___ process. Integrated Baseline Review Process These appropriation categories are a part of the life cycle cost. Procurement, RDT&E, and O&M ___ Contracts are a high cost risk to the contractor. Fixed price Fixed price contracts are a cost risk to the government. Low The ___ is a contractually required report that is prepared by the contractor, contains performance information derived from the internal Earned Value Management Systems (EVMS), and provides a status of the progress on the contract. Integrated Program Management Report The 5 M's of manufacturing are: material, method, ____, manpower, measurement. Machinery

Some of the manufacturing methods that influence system design are: Design parts for ease of fabrication, design for multiuse, minimize total number of parts, maximize number of common parts, design for ease of assembly The design engineering focus effort includes: producible designs, capable manufacturing process and ___. Process controls to ensure requirements This action uses funds for purposes other than those originally intended by congress. Reprogramming The PM must notify the Milestone Decision Authority (MDA) that a program deviation has occurred ___. Immediately When comparing the original baseline estimate to the current estimate, an increase of 50% is considered a . Critical breach Section 2366b of title 10 requires certification that the technology in the program has been demonstrated in a ___ environment to enter milestone B or Technology Readiness level ____. Relevant, TRL 6 These are the 5 activities of risk management process. Process planning, identification, analysis, mitigation/corrected, monitoring Changing design requirement, late design release, ____ funding, and lack of production planning leads to increased cost and production delays. Unstable Manufacturing tradeoffs are consider throughout the acquisition life cycle as part of the systems engineering process is a type of tradeoff that may be required to attain a producible design.

Cost vs operational capabilities This analysis assesses critical technology associated with the concepts document in the Initial Capabilities Document (ICD). Analysis of Alternative _____ describes the difference between the CDD thresholds and objective values. Trade space Document which is developed next when a Capabilities Based Assessment (CBA) recommend a non-materiel solution. DOTMLPF-P Change Recommendation (DCR) This process ensures that capabilities required by the warfighter are identified and meet operational performance criteria. Joint Capabilities Integration and Development System (JCIDS) The appropriations bill provides this authority. Budget Authority This act is the principle mechanism by which congress modifies the defense acquisition structure. The National Defense Authorization (NDA) These are the 5 pillars of cybersecurity. Confidentiality, integrity, availability, authenticity, and non-repudiation of user data T&E event (assessment) conducted to support a formal Milestone B decision, Preliminary Design Review (PDR), and other programmatic decisions. Early Operational Assessment (EOA) The V model of systems engineering Testing & Evaluation consists of Verification (__ Testing) and validation (__ testing). Developmental, operational

Approximately __% of the life cycle cost is experienced in the Operations and Support phases of the life model. Decisions made early in the system... 70% Program managers must ensure that their program, regardless of ___ comply with ESOH statutory and regulatory requirements. ACAT level ___ requires the program manager to prepare a Programmatic Environment, Safety and Occupational Health Evaluation (PESHE). DoDI 5000. A ___ probability is the probability that a mishap will occur during the planned life expectancy of the system. Mishap Risk that remains after all planned mishap risk management measures have been implemented because there is never a perfect choice. Residual This requires program managers to evaluate the environmental impact of an acquisition program before making a major decision that could affect the environment. National Environmental Protection Act (NEPA) ___ is the design effort priority. Produce-ability All acquisition programs that include or support munitions, explosives, and energetics need to comply with ____. DOD explosives safety requirements A percentage of ___ constitutes a significant breach when comparing the original baseline estimate to the current estimate.

30%