Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

ACI Test: Comprehensive Questions and Answers for Concrete Testing, Exams of Construction

A comprehensive set of questions and answers related to aci (american concrete institute) testing procedures. It covers various aspects of concrete testing, including sampling, temperature measurement, slump test, air content determination, unit weight and yield, and making and curing concrete specimens. Valuable for students and professionals in civil engineering and construction who need to understand the principles and practices of concrete testing.

Typology: Exams

2024/2025

Available from 10/30/2024

lucinda-bernadette
lucinda-bernadette 🇺🇸

174 documents

1 / 8

Toggle sidebar

Related documents


Partial preview of the text

Download ACI Test: Comprehensive Questions and Answers for Concrete Testing and more Exams Construction in PDF only on Docsity! ACI Test | Comprehensive Questions and Answers Latest Updated 2024/2025 With 100% Verified Solutions The total time allowed between obtaining the first and final portions of a composite sample is - ✔✔15 minutes When it is necessary to wet sieve the concrete sample, wet sieving should be performed after the individual samples are remixed into a composite sample (T or F) - ✔✔F Tests for slump, temperature, and air content must begin within ______ minutes after obtaining the composite sample - ✔✔5 minutes Begin molding test specimens within ______ minutes after obtaining the composite sample - ✔✔15 minutes The concrete samples should be protected from - ✔✔the sun, wind, and other sources of rapid evaporation, from contamination When test specimens are to be molded, the minimum size of sample obtained is - ✔✔28 L (1 ft^3) The primary objective of the sampling process is to obtain a representative sample (T or F) - ✔✔T When sampling from a revolving drum truck mixer collect concrete from ______ portions of the batch - ✔✔2 or more Wet sieving is performed - ✔✔when the concrete contains aggregates larger than appropriate for a test When sampling from a paving mixer it is not acceptable to place 3 small containers on the sub grade in order to obtain the required samples of concrete (T or F) - ✔✔F TEMPERATURE - ✔✔ it may require up to ___ min before the temp stabilizes when the NMS of the coarse agg is greater than ___ - ✔✔20min., 3in. The container for the concrete shall be large enough to provide at least ___ inches, or _____ of coarse agg, of concrete in all directions around the TMD - ✔✔3in., 3 x NMS The temperature measuring device shall have the capability of measuring the temperature of the freshly mixed concrete to ± ______ oF accuracy and have a range of ______ to ______ oF. - ✔✔1,30to120 A composite sample of concrete is not required even if the only purpose for obtaining the sample is to determine temperature. T or F - ✔✔T The Temperature Measuring Device used for determining concrete temperature must be calibrated ______ or whenever there is a question of accuracy. - ✔✔annually The temperature of freshly mixed concrete can be measured in - ✔✔all of the above Submerge the sensing portion of the thermometer at least ______ inches into the concrete - ✔✔3 Gently press concrete around the thermometer such that the_______ does not affect the reading. - ✔✔ambient air temp The thermometer must remain in the concrete during the measurement for a minimum of ______ minutes. In addition, the temperature measurement must be completed within _______ minutes after obtaining the sample. - ✔✔2, 5 The temperature of freshly mixed concrete is measured and recorded to the nearest _____ - ✔✔1 degree 4. Wet sieve a sufficient amount of material for the volumetric air content test over a ______ in. sieve when the coarse aggregate for the mixture can be retained on a 1.5in. sieve. - ✔✔1 5. The bowl of the volumetric meter is filled in ______ layers of equal depth. - ✔✔2 6. The excess concrete above the rim of the bowl is struck off using - ✔✔strike off bar 7. Prior to adding any isopropyl alcohol to the meter, it is necessary to add at least ____ of water. - ✔✔1 pint 8. The meter should be inverted and agitated for at least - ✔✔45 sec . The rolling process should be continued for a minimum of - ✔✔1min 10. The liquid level in the neck of the meter is stabilized when - ✔✔the liquid level does not change more than 0.25% within a 2 minute period 11. Whenever a reading of the liquid level is taken, the reading is rounded to the nearest - ✔✔0.25% 12. If the foam in the neck of the meter is equivalent to ______ percent air content divisions, or more, the sample must be discarded and test rerun. - ✔✔2 Confirmation of the initial meter reading is obtained when the difference between the initial and final meter readings are within ________ of each other. - ✔✔0.25% If the concrete found in the bottom of the bowl is found to be undisturbed and tightly packed, adhering to the bowl of the volumetric meter when emptied, - ✔✔b. the test is invalid and the sample should be discarded. The final meter reading from the neck is found to be 5.5%. Three pints of alcohol were added with the water, given a correction factor of 0.3. The final air content for this test is________. - ✔✔. 5.5 - 0.3 = 5.2, rounded to 5.25%. UNIT WEIGHT YIELD AND AIR CONTENT - ✔✔ The size of the measure used in determining the density of fresh concrete _______. - ✔✔c. is based on the nominal maximum size aggregate ****. It is not allowable to use the bowl from the volumetric air meter test to determine the density of fresh concrete, when the NMAS is 1 inch or less. - ✔✔ 3. The appropriate method of consolidation, when the slump of the fresh concrete is less than 1 inch, is to use _______. - ✔✔a vibrator 4. The rod should __________________________when rodding the second and third layers of concrete in the measure. - ✔✔c. penetrate the underlying layer about 1 inch. When a vibrator is used to consolidate the concrete in the measure, fill the measure in ______ equal layers. - ✔✔2 6. After completing the consolidation portion of the test, it is optimal to have approximately 1/8 inch of excess concrete above the rim of the measure. - ✔✔T It is allowable to add a small quantity of concrete to the measure to correct a deficiency. - ✔✔T 8. To insure that the measure is completely full with concrete and the surface is level, strike off the top surface of concrete using ________. - ✔✔only strike off plate In order to determine the density of fresh concrete, it is necessary to determine __________. - ✔✔the weight and volume of the filled measure as well as the weight of the empty measure. Yield represents the ________. - ✔✔d. volume of concrete produced per batch MAKING AND CURING CONCRETE - ✔✔ 1. The standard sized flexural strength specimen has cross-sectional dimensions of - ✔✔6in. x 6in 2. The standard sized compressive cylinder and flexural beam molds are used for concrete with nominal maximum sized coarse aggregate up to _________. - ✔✔2 in A flexural beam is filled in ______ layer(s) of approximately equal depth. - ✔✔2 ACI Field Testing Technicians, Grade I or equivalent certification is not required is required when testing for slump, air content, and density, but not for making test specimens.. - ✔✔F When test specimens are to be molded, it is not necessary to determine the slump, air content, and temperature of fresh concrete. - ✔✔F 6. Single-use cylinder molds that are susceptible to damage when tapped with a rubber mallet should instead by tapped 10 to 15 times with - ✔✔with an open hand 7. Concrete test specimens with a specified compressive strength less than 6,000psi, should be initially cured in a temperature range from - ✔✔60 to 80 Initial curing must continue for a period - ✔✔up to 48 hours Test specimens shall not be transported until at least ______ hours after initial set has occurred. - ✔✔8