







Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Advanced Crane & Rigging Test Actual Final Examination with Complete Questions And 100% Correct Revised Solutions Rated 5 Stars A+ Graded When should an approved lift plan be re-approved? - CORRECT ANSWER >>>D. If there is any deviation from the original lift plan.
Typology: Exams
1 / 13
This page cannot be seen from the preview
Don't miss anything!
Electrical hazards in the lift area and swing direction and degree are factors to
Capacities for crawler cranes that have outrigger extensions may not exceed
When planning a lift involving two cranes, calculate the lowest net capacities
net capacities of the cranes exceeds the load weight.
pre-lift meeting where all personnel in the lift are present.
The load block contacts the boom point sheaves Lifting 20,000 lbs with a 2-leg bridle sling at a 30° horizontal sling angle, what
In multiple crane lifts using an equalizer beam, the weight of the beam
On level ground using skids and rollers, what percent of the weigh of the load
Before performing pick and carry operations with any mobile crane, it is
capacity chart.
ON multiple crane lifts, the load on each crane should NOT exceed what
plate for lifting. The formula for determining stress on a snatch block performing a vertical lift is: line pull x block factor = block load. What must be done to calculate the
coefficient of friction to determine line pull, and then use the standard formula. If both fists are placed in front of your body with your thumbs pointed
the boom sections.
What is the maximum percent of the rated capacity of a crane that can be
When does lightning present the greatest hazard to crane and regging
apparent. What force would be required to move an object up an inclined plane
more.
All of the following are reasons for stopping personnel lifting operations
In a spur-gear chain hoist with a two chain system, the endless chain is used
A document that outlines weights, crane configuration and rigging
When using a 1-inch wire rope sling in a vertical basket hitch lifting a 24 ft, 36
When forming a lift plan, a primary concern for the person doing the rigging
When using a wedge socket, the dead end of the rope is secured in the
When erecting or stowing a swing-away lattice extension, what should be
lifting any load
When a tugger is mounted where the operator can NOT see the load, the
cranes
A one inch, 3 leg bridle wire rope sling rigged at 45° angle is good for 18 tons.
During a critical lift, the only person(s) who may give signals to the crane
signalers
Sling lengths need to be long enough to ensure that the horizontal angle is
The device used as an alternative to a freestanding tower crane where lower
The net capacity of crane one is 130,000 lbs. The net capacity of crane two is 90,000 lbs. The weight of the load is 145,000 lbs. The weight of the equalizer beam is 3000 lbs. The distance between the hook blocks is 25 ft. The loads
If the gross capacity of a crane is 75,000 lbs. and the total weight of the
If the net capacity of a crane in a particular configuration is 85,000 lbs and
When lifting from a jib of a lattice boom crane, the line to the jib top is
- CORRECT ANSWER >>> | P a g e