Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Bài tập trắc nghiệm quản trị dự án, Lecture notes of Quantum Physics

Bài tập trắc nghiệm quản trị dự án

Typology: Lecture notes

2023/2024

Uploaded on 06/17/2024

my-nguyen-tran-yen
my-nguyen-tran-yen 🇻🇳

2 documents

Partial preview of the text

Download Bài tập trắc nghiệm quản trị dự án and more Lecture notes Quantum Physics in PDF only on Docsity!

36 Chapter 1 - What Is a Project? Review Questions Which organization has set the de facto standards for project management techniques? A. PMBOK B. PMO Cc. PMI D. PMA The VP of marketing approaches you and requests that you change the visitor logon screen on the company’s website to include a username with at least six characters. This is consid- ered which of the following? A. Project initiation B. Ongoing operations Cc. A project D. Project execution Your company manufactures small kitchen appliances. It is introducing a new product line of appliances in designer colors with distinctive features for kitchens in small spaces. These new products will be offered indefinitely starting with the spring catalog release. Which of the following is true? A. This is a project because this new product line has never been manufactured and sold by this company before. B. This is an ongoing operation because the company is in the business of manufacturing kitchen appliances. Introducing designer colors and features is simply a new twist on an existing process. C. This is an ongoing operation because the new product line will be sold indefinitely. It’s not temporary. D. This is not a project or an ongoing operation. This is a new product introduction not affecting ongoing operations. Your company manufactures small kitchen appliances. It is introducing a new product line of appliances in designer colors with distinctive features for kitchens in small spaces. These new products will be offered indefinitely starting with the spring catalog release. To determine the characteristics and features of the new product line, you will have to perform which of the following? A. Fast tracking B. Consulting with the stakeholders C. Planning the project life cycle D. Progressive elaboration