Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

CADE Storm Water Compliance: Construction Questions and Answers, Exams of Water and Wastewater Engineering

A comprehensive overview of the key regulations, requirements, and best practices related to storm water management and compliance on construction sites. It covers topics such as the clean water act, npdes regulations, potential pollutant sources, swppp implementation, site map requirements, construction site notices, erosion control measures, good housekeeping practices, and inspection procedures. Structured as a series of questions and answers, making it a valuable resource for construction professionals, project managers, and anyone involved in storm water compliance on construction projects. The level of detail and the practical nature of the information presented make this document a useful reference for both study and application in the field.

Typology: Exams

2024/2025

Available from 10/26/2024

Achieverr
Achieverr 🇺🇸

4.8

(4)

3.8K documents

1 / 3

Toggle sidebar

Related documents


Partial preview of the text

Download CADE Storm Water Compliance: Construction Questions and Answers and more Exams Water and Wastewater Engineering in PDF only on Docsity!

CADE Storm Water Compliance

Construction questions with answers

The Clean Water Act - .......ANSWERS 🔷🖊✔✔The 1970's law that set into place the regulation of storm water NPDES - .......ANSWERS 🔷🖊✔✔Requirements for managing storm water activity on a construction site are outlined in the following regulation Discharge From Contaminated Ground Water - .......ANSWERS 🔷🖊✔✔Never an allowable discharge from a construction site A notice of termination can be filed when? - .......ANSWERS 🔷🖊✔✔All construction activity, inside and outside of the building is complete. Permanent stabilization has been verified. The storm water notice of intent must be submitted? - .......ANSWERS 🔷🖊✔✔After the SWPPP is prepared and before starting construction. Potential pollutant sources stored on a construction site may include?

  • .......ANSWERS 🔷🖊✔✔Petroleum storage tanks, fertilizer, lime, and masonry materials. The SWPPP implementation sequence may be modified? - .......ANSWERS 🔷🖊✔✔After consulting with the project SWPPP designer (CEC) and if required, the project owner and receiving written approval. A SWPPP site map will show all of the following? - .......ANSWERS 🔷🖊✔✔Location of BMP's, Phasing & Sequence, Limits of Disturbance

Which of the following information is to be posted at the entrance to the site?

  • .......ANSWERS 🔷🖊✔✔Construction site notice, permit authorization, location of SWPPP Which of the following is not a beneficial use water? - .......ANSWERS 🔷🖊✔✔Flushing water down a storm drain When installing and maintaining a check dam make sure...? - .......ANSWERS 🔷🖊 ✔✔The low point (overflow) of the check dam is in the middle of the channel To reduce the possibility of undercutting in channels, you should? - .......ANSWERS 🔷🖊✔✔Install filter fabric under rock & similar materials placed within the storm water conveyance. The good housekeeping section of the SWPPP must include? - .......ANSWERS 🔷🖊 ✔✔Hazardous waster management, solid waste, sanitary waste and disposal procedures. Runoff controls include? - .......ANSWERS 🔷🖊✔✔Diversions, check dams, slope drains Which erosion control best management practice increases water infiltration, dissipates rainfall energy, and slows overland flow of storm water? - .......ANSWERS 🔷🖊✔✔Vegetation The contractor has the most control over what erosion rate factor? - .......ANSWERS 🔷🖊✔✔Groundcover The primary purpose of a construction exit? - .......ANSWERS 🔷🖊✔✔To remove sediment from construction vehicles and minimize track out Temporary stabilization should be implemented when? - .......ANSWERS 🔷🖊 ✔✔Immediately on all disturbed areas that remain inactive for 14 days plus. Common types of erosion include? - .......ANSWERS 🔷🖊✔✔Gully, Sheet, and Rill

Proper spill management should include all of the following? - .......ANSWERS 🔷🖊 ✔✔Fully stocked, proper location, signage, and labeling. The best location for portable toilets on your construction site is? - .......ANSWERS 🔷🖊 ✔✔On level ground, in low construction traffic areas. The following must be marked on site maps in the jobsite trailer as works progresses?

  • .......ANSWERS 🔷🖊✔✔The dates when the BMP changes or additions take place. While inspecting field BPM's, the SWPPP inspector should perform all of the following?
  • .......ANSWERS 🔷🖊✔✔Note BMP's in need of repair or maintenance, Verify BMP's are installed per plans and specifications, Observe effectiveness of BMPs NPDES (National Pollutant Discharge Elimination System) - .......ANSWERS 🔷🖊 ✔✔Requirements for managing storm water activity on a construction site are outlined in the following regulation? SWPPP (Stormwater pollution prevention plan) - .......ANSWERS 🔷🖊✔✔A site specific document that identifies pollutants produced on the site.