CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions with Verified Answers,100% CORRECT, Exams of Business Economics

CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions with Verified Answers

Typology: Exams

2023/2024

Available from 07/24/2024

paul-kamau-2
paul-kamau-2 šŸ‡ŗšŸ‡ø

2.7

(3)

3.3K documents

1 / 156

Toggle sidebar

Related documents


Partial preview of the text

Download CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions with Verified Answers,100% CORRECT and more Exams Business Economics in PDF only on Docsity!

CAPM Exam Prep, PMI, PMBOK 6th Edition 1297 Questions

with Verified Answers

360-degree appraisal - CORRECT ANSWER A performance review completed by a person's peers, manager, and subordinates. It's called a 360-degree appraisal as it's a circle of reviews by people at different levels of an organization. Acceptance - CORRECT ANSWER This is a response to a risk event, generally made when the probability of the event and/or impact are small. It is used when mitigation, transference, or avoidance are not selected. Active listening - CORRECT ANSWER This occurs when the receiver confirms the message is being received by feedback, questions, prompts for clarity, and other signs of having received the message. Activity attributes - CORRECT ANSWER Activities that special conditions, requirement, risks, and other conditions should be documented. Activity cost estimates - CORRECT ANSWER The cost of resources including materials, services, and when warranted, labor should be estimated. Activity list - CORRECT ANSWER A listing of all of the project activities required to complete each project phase or the entire project. This list is an input to the project network diagram. Activity on node - CORRECT ANSWER A network diagramming approach that places the activities on a node in the project network diagram. Activity sequencing - CORRECT ANSWER The process of mapping the project activities in the order in which the work should be completed. Actual costs - CORRECT ANSWER The amount of funds the projects has spent to date. The difference between actual costs and earned value will reveal the cost variance.

Adjourning - CORRECT ANSWER The final stage of team development; once the project is done, the team moves onto other assignments either as a unit or the project team ream is disbanded and individual team members go onto other work. Affinity diagram - CORRECT ANSWER Clusters like ideas together and allows for decomposition of ideas to compare and contrast project requirements. Analogous estimating - CORRECT ANSWER This relies on historical information to predict estimates for current projects. Analogous estimating is also known as top=down estimating and is a form of expert judgment. Application areas - CORRECT ANSWER The areas of discipline that a project may center upon. Consider technology, law, sales, marketing, and construction among many others. Assumption log - CORRECT ANSWER A document that clearly identifies and tracks assumptions that are made in the project. All assumptions need to be tested for their validity and the outcome of the test should be recorded. Autocratic - CORRECT ANSWER The project manager makes all of the decisions. Avoidance - CORRECT ANSWER This is one response to a risk event. The risk is avoided by planning a different technique to remove the risk from the project. Benchmarking - CORRECT ANSWER A process of using prior projects within or external to the performing organization to compare and set quality standards for processes and results. Benefit measurement methods - CORRECT ANSWER Project selection methods that compare the benefits of projects to determine which project the organization should select for investment. Benefit/cost analysis - CORRECT ANSWER The process of determining the pros and cons of any project, process, product, or activity.

Benefit/cost ratios - CORRECT ANSWER Shows the proportion of benefits to costs; for example 4:1 would equate to four benefits and just one cost. Bid - CORRECT ANSWER A document from the seller to the buyer. Used when price is the determining factor in the decision-making process. Bidder conferences - CORRECT ANSWER A meeting with prospective sellers to ensure all sellers have a clear understanding of the product or service to be procured. Bidder conferences allow sellers to query the buyer on the details of the product to help ensure that the proposal the seller creates is adequate and appropriate for the proposed agreement. Bottom-up estimating - CORRECT ANSWER A technique where an estimate for each component in the WBS is developed and then totaled for an overall project budget. This is the longest method to complete, but it provides the most accurate estimate. Brainstorming - CORRECT ANSWER The most common approach to risk identification; it is performed by a project team to identify the risks within the project. A multidisciplinary team, hosted by a project facilitator, can also perform brainstorming. Budget at completion - CORRECT ANSWER The predicted budget for the project; what the project should cost when it is completed. Budget at completion represents 100 percent of the planned value for the project's completion. Cause-and-effect diagrams - CORRECT ANSWER Used for root cause analysis of what factors are creating the risks within the project. The goal is to identify and treat the root of the problem, not the symptom. Centralized contracting - CORRECT ANSWER All contracts for all projects need to be approved through a central contracting unit within the performing organization. Change Control Board - CORRECT ANSWER A group of decision makers the review proposed project changes.

Change Control System - CORRECT ANSWER A predefined set of activities, forms, and procedures to entertain project change requests. Change log - CORRECT ANSWER As changes to the project time, cost, or scope enter the project they should be recorded in the change log for future reference. Change management plan - CORRECT ANSWER When changes are approved for a project, including time, cost, scope, or contract, then there needs to be a plan on how the project team will manage these new changes within the project. Chart of accounts - CORRECT ANSWER A coding system used by the performing organization's accounting system to account for the project work. Checklists - CORRECT ANSWER A listing of activities that workers check to ensure the work has been completed consistently; used in quality control. Closing - CORRECT ANSWER The fifth of five project management process groups. It contains the processes responsible for closing a project, a project phase, or the procurement relationships. Coercive power - CORRECT ANSWER The project manager uses fear and threats to manage the project team. Collective bargaining agreements - CORRECT ANSWER These are contractual agreements initiated by employee groups, unions, or other labor organization; they may act as a constraint on the project. Communications formula - CORRECT ANSWER The formula "N(N-1)/2" shows the number of communication channels in a project. N represents the total number of stakeholders. Communications management plan - CORRECT ANSWER A plan that documents and organizes the stakeholder needs for communication. This plan covers the communications system, its documentation, the flow of communication, modalities of communication, schedules for communications, information retrieval, and any other stakeholder requirements for communications.

Composite structure - CORRECT ANSWER An organizational structure that uses a blend of the functional, matrix, or projectized organization to operate and manage projects. Compromising - CORRECT ANSWER A conflict resolution method; this approach requires both parties to give up something. The decision ultimately made is a blend of both sides of the argument. Because neither party completely wins, it is considered a lose-lose solution. Confidentiality - CORRECT ANSWER A project manager should keep certain aspects of a project confidential; consider contract negotiations, human resource issues, and trade secrets of the organization. Configuration management - CORRECT ANSWER The control and documentation of the project's product features and functions. Conflict of interest - CORRECT ANSWER A situation where the project manager could influence a decision for personal gain. Constrained optimization methods - CORRECT ANSWER Complex mathematical models to determine the likelihood of a project's success. These models are used to determine which project an organization should choose for investment. Constraints - CORRECT ANSWER Anything that limits the project manager's options; for example, time, cost, and scope are always project constraints. Contingency reserve - CORRECT ANSWER A time or dollar amount allotted as a response to risk events that may occur within a project. Continuous process improvement - CORRECT ANSWER A goal of quality assurance to improve the project's processes and deliverables; meshes with the project's Process Improvement Plan. Contract - CORRECT ANSWER A legal, binding agreement, preferably written, between a buyer and seller detailing the requirements and obligations of both parties. Must include an offer, an acceptance, and a consideration.

Contract administration - CORRECT ANSWER The process of ensuring that the buyer and the seller both perform to the specifications within the contract. Contract change control system - CORRECT ANSWER Defines the procedures for how contracts may be changed. Includes the paperwork, tracking, conditions, dispute resolution procedures, and the procedures for getting the changes approved within the performing organization. Contract closeout - CORRECT ANSWER A process for confirming that the obligations of the contract were met as expected. The project manager, the customer, key stakeholder, and, in some instances, the seller complete the product verification together to confirm the contract has been completed. Contract file - CORRECT ANSWER A complete indexed set of records of the procurement process incorporated into the administrative closure process. These records include financial information as well as information on the performance and acceptance of the procured work. Control charts - CORRECT ANSWER These illustrate the performance of a project over time. They map the results of inspections against a chart. Control charts are typically used in projects or operations that have repetitive activities such as manufacturing, test series, or help desk functions. Upper and lower control limits indicate if values are within control or out of control. Cost baseline - CORRECT ANSWER This shows what the project is expected to spend. It's usually shown in an S-curve and allows the project manager and management to predict when the project will be spending monies and over what duration. The purpose of the cost baseline is to measure and predict project performance. Cost budgeting - CORRECT ANSWER A process of assigning a cost to an individual work package. This process shows costs over time. The cost budget results in an S- Curve that becomes the cost baseline for the project. Coat change control - CORRECT ANSWER This is part of the Integrated Change Control System and documents the procedures to request, approve, and incorporate changes to project costs.

Cost control - CORRECT ANSWER An active process to control causes of cost change, to document cost changes, and to monitor cost fluctuations within the project. When changes occur, the cost baseline must be updated. Cost estimating - CORRECT ANSWER The process of calculating the costs, by category, of the identified resources to complete the project work. Cost management plan - CORRECT ANSWER Explains how variances to the costs of the project will be managed. The plan may be based on the range of acceptable variances and the expected response to variances over a given threshold. Cost of conformance - CORRECT ANSWER The cost of completing the project work to satisfy the project scope and the expected level of quality. Examples include training, safety measures, and quality management activities. Also known as the cost of quality. Cost of nonconformance - CORRECT ANSWER The cost of not completing the project with quality; includes wasted time for corrective actions, rework, wasted materials. This could mean loss of business, loss of sales, lawsuits. Also known as the cost of poor quality. Cost performance index - CORRECT ANSWER The process of calculating the costs, by category, of the identified resources to complete the project work. Cost plus award fee - CORRECT ANSWER The contract requires the buyer to pay for all the project costs and give the seller an award fee based on the project performance, meeting certain project criteria, or other goals established by the buyer. The award fee can be tied to any factor the buyer determines and the factor doesn't have to be exact. Cost variance - CORRECT ANSWER The difference between the earned value and the actual costs. Cost-reimbursable contracts - CORRECT ANSWER A contract that pays the seller for the product. In the payment to the seller, there is a profit margin the difference between the actual costs of the product and the sales amount.

Crashing - CORRECT ANSWER A duration compression technique that adds project resources to the project in an effort to reduce the amount of time allotted for effort-driven activities. Critical chain method - CORRECT ANSWER A network diagramming approach that considers the availability or project resources and the project's promised end date to determine the critical path(s) in the project. Critical path method - CORRECT ANSWER A network diagramming approach that identifies the project activities which cannot be delayed or the project completion date will be late. Cultural norm - CORRECT ANSWER The accepted practices, culture, ideas, vision, and nature of an organization. Culture shock - CORRECT ANSWER The initial reaction a person experiences when they're in a foreign environment. Decision tree analysis - CORRECT ANSWER A type of analysis that determines which of two decisions is he best. The decision tree assists in calculating the value of the decision and determining which decision costs the least. Decoder - CORRECT ANSWER The is a part of the communications model; it is the inverse of the encoder. If a message is encoded, a decoder translates it back to usable format. Decomposition - CORRECT ANSWER The breakdown of the project scope statement into the project's work breakdown structure. The smallest item of the project's decomposition into the WBS is called the work package. Deliverable - CORRECT ANSWER A thing that a project creates; projects generally create many deliverables as part of the project work. Delphi techinque - CORRECT ANSWER A method to query experts anonymously on foreseeable risks within the project, phase, or component of the project. The results of the survey are analyzed and organized and then circulated to the

experts. There can be several rounds of anonymous discussions with the Delphi technique. The goal is to gain consensus on project risks, and the anonymous nature of the process ensures that no one expert's advice overtly influences the opinion of another participant. Democratic - CORRECT ANSWER The project team is involved in the decision- making process. Design of experiments - CORRECT ANSWER This relies on statistical "what-if" scenarios to determine which variables within a project will results in the best outcome; it can also be used to eliminate a defect. The design of experiments approach is most often used on the product of the project, rather than the project itself. Dictatorship - CORRECT ANSWER A group decision process where the person with the most power forced the decision even though the rest of the group may oppose the decision. Direct costs - CORRECT ANSWER Costs incurred by the project in order for it to exist. Examples include equipment needed to complete the project work, salaries of the project team, and other expenses tied directly to the project's existence. Discretionary dependencies - CORRECT ANSWER The order of the project activities do not have to completed in a particular order so they can be done in the order of the project manager or the project team's discretion. Duration estimates - CORRECT ANSWER The prediction of how long the project work will take to complete. Earned value - CORRECT ANSWER The value of the work that has been completed and the budget for that work: EV=%Complete X BAC. Earned value management - CORRECT ANSWER Earned value management integrates scope, schedule, and cost to give an objective, scalable point-in-time assessment of the project. EVM calculates the performance of the project and compares current performance against plan. EVM can also be a harbinger of

things to come. Results early in the project can predict the likelihood of the project's success or failure. Effective listening - CORRECT ANSWER The receiver is involved in the listening experience by paying attention to visual clues by the speaker and to paralingual intentions and by asking relevant questions. Encoder - CORRECT ANSWER Part of the communications model; the device or technology that packages the message to travel over the medium. Enhance - CORRECT ANSWER To enhance a risk is to attempt to modify its probability to and/or its impacts to realize the most gains from the identified risk. Estimate at completion - CORRECT ANSWER A hypothesis of what the total cost of the project will be. Before the project begins, the project manager completes an estimate for the project deliverables based on the WBS. As the project progresses, there will likely be some variances between what the cost estimate was and what the actual cost is. The EAC is calculated to predict what the new estimate at completion will be. Estimate to complete - CORRECT ANSWER Represents how much more money is needed to complete the project work: ETC=EAC-AC Estimating publications - CORRECT ANSWER Typically a commercial reference to help the project estimator confirm and predict the accuracy of estimates. If a project manager elects to use one of these commercial databases, the estimate should include a pointer to his document for future reference and verification. Ethics - CORRECT ANSWER Describes the personal, cultural, and organizational interpretation of right and wrong; project managers are to operate ethically and fairly. Ethnocentrism - CORRECT ANSWER Happens when individuals measure and compare a foreigner's actions against their own local culture. The locals typically believe their own culture is superior to the foreigner's culture.

Evaluation criteria - CORRECT ANSWER Use to rate and score proposals from sellers. In some instances, such as a bid or quote, the evaluation criterion is focused just on the price the seller offers. In other instances, such as a proposal, the evaluation criteria can be multiple values: experience, references, certifications, and more. Exceptional - CORRECT ANSWER The project manager only pays attention to the top ten percent of the project performers and the bottom ten percent of the project team performers. Executing - CORRECT ANSWER The project management process group that carries out the project management plan to create the project deliverables. Expectancy theory - CORRECT ANSWER People will behave on the basis of what they expect as a result of their behavior. In other words, people will work in relation to the expected reward of the work. Expert power - CORRECT ANSWER A type of power where the authority of the project manager comes from experience with the area that the project focuses on. Exploit - CORRECT ANSWER The organization wants to ensure that the identified risk does happen to realize the positive impact associated with the risk event. Facilitated workshops - CORRECT ANSWER A collection of stakeholders from around the organization that come together to analyze, discuss, and determine the project requirements. Fast tracking - CORRECT ANSWER A schedule compression technique that allow phases to overlap in order to compress the schedule and finish the job faster. Fast tracking does increase project risk. Feedback - CORRECT ANSWER Sender confirmation of the message by asking questions, requesting a response, or other confirmation signals. Finish-to-finish - CORRECT ANSWER A relationship between project activities where the predecessor activities must finish before successor activities may finish.

Finish-to-start - CORRECT ANSWER A relationship between project activities where the predecessor activities must finish before the successor activities may start; this is the most common network diagramming relationship type. Fixed costs - CORRECT ANSWER Costs that remain the same throughout the project. Fixed price with economic price adjustment contracts - CORRECT ANSWER A contract for long-term projects that may span years to complete the project work. The contract does define a fixed price with caveats for special categories of price fluctuation. Fixed-price contracts - CORRECT ANSWER Fixed-price contracts are also known as Firm-Fixed-Price and Lump-Sum contracts. These contracts have a pre-set price that the vendor is obligated to perform the work or provide materials for the agreed price. Float - CORRECT ANSWER A generic term to describe the amount of time an activity may delay without delaying any successor activities start date. Flowcharting - CORRECT ANSWER A chart that illustrates how the parts of a system occur in sequence. FNET - CORRECT ANSWER A project constraint that requires an activity to finish no earlier than a specific date. Focus groups - CORRECT ANSWER A conversation of stakeholders led by a moderator to elicit project requirements. Force majeure - CORRECT ANSWER A powerful and unexpected event, such as a hurricane or other disaster. Forcing - CORRECT ANSWER A conflict resolution method where one person dominates or forces their point of view or solution to a conflict.

Forecasting - CORRECT ANSWER An educated estimate of how long the project will take to complete. Can also refer to how much the project may cost to complete. Formal power - CORRECT ANSWER The type of power where the project manager has been assigned by senior management to be in charge of the project. Forming - CORRECT ANSWER The initial stage of team development; the project team meets and learns about their roles and responsibilities on the project. Fragnets - CORRECT ANSWER A portion of the project that is usually contracted to a vendor to complete yet the project work is still represented in the project network diagram. Function analysis - CORRECT ANSWER Related to value engineering, this allows team input to the problem, institutes a search for a logical solution, and tests the functions of the product so the results can be graphed. Functional managers - CORRECT ANSWER The managers of the permanent staff in each organizational department, line of business, or function such as sales, finance, technology. Project managers and functional managers interact on project decisions that affect functions, project, and operations. Functional structure - CORRECT ANSWER An organization that groups staff according to their expertise. Entities that have a clear division regarding the business units and their associated responsibility. Project managers in functional organizations have little power and report to the functional managers and the project team all exist within one department. Future value - CORRECT ANSWER A formula to predict the current amount of funds into a future amount of funds. The formula is : Future Value = Present Value(i+i)^n where i is the value of return and n is the number of time periods. Halo effect - CORRECT ANSWER When one attribute of a person influences a decision.

Hard logic - CORRECT ANSWER The project activities must be completed in a particular order; this is also known as mandatory dependencies. Herzberg's Theory of Motivation - CORRECT ANSWER Posits that there are two catalysts for workers: hygiene agents and motivating agents. Hygiene agents do nothing to motivate, but their absence demotivates workers. Hygiene agents are the expectations all workers have: job security, paychecks, clean and safe working conditions, a sense of belonging, civil working relationships, and other basic attributes associated with employment. Motivating agents are components such as reward, recognition, promotion, and other values that encourage individuals to succeed. Histogram - CORRECT ANSWER A bar chart; A Pareto diagram is an example of a histogram. Historical information - CORRECT ANSWER Any information created in the past that can help the current project succeed. Human resources plan - CORRECT ANSWER Defines the management of the project human resources, timing of use, and enterprise environmental factors the project manager must adhere to in the organization when it comes to human resources management. Inappropriate compensation - CORRECT ANSWER The project manager is avoiding compensation, such as bribes. The project manager is to act in the best interest of the project and the organization. Indirect costs - CORRECT ANSWER These costs can be shared across multiple projects that use the same resources - such as for a training room or piece of equipment. Influence diagram - CORRECT ANSWER An influence diagram charts out a decision problem. It identifies all of the elements, variables, decisions, and objectives - and how each factor may influence another.

Initiating - CORRECT ANSWER The start and authorization of the project; the project manager is identified, the project is authorized through the charter, and the stakeholders are identified. Internal rate of return - CORRECT ANSWER A benefit measurement formula to calculate the when the present value of the cash inflow equals the project's original investment. Interviews - CORRECT ANSWER A requirements elicitation process to collect requirements from the project stakeholders. Invitation for bid - CORRECT ANSWER A document from the buyer to the seller. Requests the seller to provide a price for the procured product or service. Iron triangle - CORRECT ANSWER A term used to describe the three constraints of every project: time, cost and scope. The sides of the Iron Triangle must be kept in balance or the quality of the project will suffer. ISO 9000 - CORRECT ANSWER An international standard that helps organizations follow their own quality procedures. ISO 9000 is not a quality system, but a method of following procedures created by an organization. Issue log - CORRECT ANSWER Issue are decisions that are usually in disagreement among two or more parties. Issues are recorded in the issue log along with an issue owner designation, an issue date for resolution, and the eventual outcome of the issue. Issues - CORRECT ANSWER Any point of contention, debate, or decision that has not yet been made in the project that may affect the project's success. Iterative relationships of project phases - CORRECT ANSWER Ideal for projects like research. The next phase of the project is not planned until the current phase of the project is underway. The direction of the project can change based on the current work in the project, market conditions, or as more information is discovered.

Kill point - CORRECT ANSWER An opportunity to halt the project based on project performance in the previous phase. Kill points typically come at the end of a project phase and are also known as phase gates. Knowledge areas - CORRECT ANSWER There are ten knowledge areas within project management; each knowledge area is a specific portion of the project, and all ten project management knowledge areas are interrelated. Lag - CORRECT ANSWER Time added to a project activity to delay its start time; lag time is considered positive time and it is sometimes called waiting time. Laissez faire - CORRECT ANSWER The project manager has a hands-off policy and the team is entirely self-led regarding the decision-making process. Lead - CORRECT ANSWER Time added to activity to allow its start time to begin earlier than scheduled; lead time is negative time as it moves the activities closer to the project's start date. Lessons learned - CORRECT ANSWER Ongoing collection of documentation about what has and has not worked in the project; the project manager and the project team participate in lessons learned creation. Letter of intent - CORRECT ANSWER Expresses the intention of the buyer to procure products or services from the seller. This is not a contract, but express intent to purchase so the seller can prepare for the work. Majority - CORRECT ANSWER A group decision process where a vote is offered and the majority wins. Make-or-buy analysis - CORRECT ANSWER Used in determining what part of the project scope to make and what part to purchase. Management by projects - CORRECT ANSWER An organization that uses projects to move the company forward is using the management-by-projects approach. These project-centric entities could manage any level of their work as a project.

Mandatory dependencies - CORRECT ANSWER Project activities must happen in a particular order due to the nature of the work; also known as hard logic. Maslow's Hierarchy of Needs - CORRECT ANSWER A theory that states that there are five layers of needs for all humans; physiological, safety, social, esteem, and the crowning jewel, self-actualization. Matrix structure - CORRECT ANSWER An organization that groups staff by function but openly shares resources on project teams throughout the organization. Project managers in a matrix structure share the power with functional management. There are three types of matrix structures: weak, balanced, and strong to describe the amount of authority for the project manager. McClelland's Theory of Needs - CORRECT ANSWER People have three needs: achievement, affiliation, and power. One of the needs drives the person's actions. McGregor's Theory of X and Y - CORRECT ANSWER This theory states that "X" people are lazy, don't want to work, and need to be micromanaged. "Y" people are self-led, motivated, and strive to accomplish Medium - CORRECT ANSWER Part of the communications model; this is the path the message takes from the sender to the receiver. This is the modality in which the communication travels typically refers to an electronic model, such as e-mail or the telephone. Mind mapping - CORRECT ANSWER A visual representation of like and opposing ideas, thoughts, and project requirements. Mitigation - CORRECT ANSWER Reducing the probability or impact of a risk. Monitoring and controlling - CORRECT ANSWER The project management process group responsible for ensuring that the project execution is completed according to the project management plan and expectations. Monte Carlo analysis - CORRECT ANSWER A what-if scenario to determine how scenarios may work out given any number of variables. The process doesn't actually create out a specific answer, but a range of possible answers. When

Monte Carlo is applied to a schedule, it can present, for example, the optimistic completion date, the pessimistic completion date, and the most likely completion date for each activity in the project. Murder boards - CORRECT ANSWER A group of decision makers that may determine to "kill" a proposed project before it is officially launched based on the board's findings on the likelihood of the project's success. Net present value - CORRECT ANSWER A benefit measurement formula used for project tha span multiple years or quarters. NPV calculates the present value for each year or querter of the project. Network templates - CORRECT ANSWER A network diagram based on previous similar projects that is adapted for the current project work. Nominal group technique - CORRECT ANSWER A group creativity technique that follows the brainstorming model by ranks each brainstorm idea. Nonverbal - CORRECT ANSWER Approximately 55 percent of oral communication is non-verbal. Facial expressions, hand gestures, and body language contribute to the message. Norming - CORRECT ANSWER Project team members go about getting the project work, begin to rely on one another, and generally complete their project assignments. Observation - CORRECT ANSWER A requirements elicitation process where the observer shadows a person to understand how they complete a process. Observers may be a participant observer or an invisible observer. Oligopoly - CORRECT ANSWER A market condition where the actions of one competitor affects the actions of all the other competitors. Operational definitions - CORRECT ANSWER The quantifiable terms and values used to measure a process, activity, or work result. Operational definitions are also known as metrics.

Operations - CORRECT ANSWER The ongoing work of the business. Operations are a generic way to describe the activities that support the core functions of a business entity. Operations management - CORRECT ANSWER Operation managers deal directly with the income-generating products or services the company provides. Projects often affect the core business so these managers are stakeholders in the project. Organizational breakdown structure - CORRECT ANSWER Though these charts are similar to the WBS, the breakdown is by department, units, or by team. Organizational charts - CORRECT ANSWER These show how an organization, such as a company or lrage project team, is ordered, reporting structures, and the flow of information. Ouchi's Theory Z - CORRECT ANSWER This theory posits that workers are motivated by a sense of commitment, opportunity, and advancement. Workers will work if they are challenged and motivated. Overlapping relationship of phases - CORRECT ANSWER Allows project phases to overlap to compress the project duration. This is also known as fast tracking. Paralingual - CORRECT ANSWER The pitch, tone, and inflections in the sender's voice affect the message being sent. Parametric estimating - CORRECT ANSWER Ideal for projects with repetitive work where a parameter, such as five hours per unit, is used to estimate the project duration. Parametric modeling - CORRECT ANSWER A mathematical model based on known parameters to predict the cost of the project. The parameters in the model can vary based on the type of work being done. A parameter can be cost per cubic yard, cost per unit, and so on. Pareto diagrams - CORRECT ANSWER A Pareto diagram is related to Pareto's Law: 80 percent of the problems come from 20 percent of the issues (this is also known

as the "80/20 rule"). A Pareto diagram illustrates problems by assigned cause, from smallest to largest. Parkinson's Law - CORRECT ANSWER Work expands to fill the amount of time allotted to it. Payback period - CORRECT ANSWER The duration of time it takes a project to earn back the original investment. Performance reports - CORRECT ANSWER These formal reports define how the project is performing on time, cost, scope, quality and any other relevant information. Performing - CORRECT ANSWER If a project team can reach the performing stage of team development, they trust one another, work well together, and issues and problems get resolved quickly and effectively. Planned value - CORRECT ANSWER The worth of the work that should be completed by a specific time in the project schedule. Planning - CORRECT ANSWER The iterative process group where the intention of the project is determined and documented in the project management plan. Plurality - CORRECT ANSWER A group decision process approach allows the biggest section of a group to win even if a majority doesn't exist. PMBOK Guide - CORRECT ANSWER The abbreviated definition for PMI's A Guide to the Project Management Body of Knowledge. PMI Code of Ethics and Professional Conduct - CORRECT ANSWER A PMI document that defines the expectations of its members to act responsibly, respectfully, fairly, and honestly in their leadership of projects and programs. PMIS - CORRECT ANSWER A project management information system is typically a software system, such as Microsoft Project, to assist the project manager in managing the project.

PMP - CORRECT ANSWER Your goal. A PMP is certified by the Project Management Institute as a Project Management Professional. Portfolio management review board - CORRECT ANSWER A collection of organizational decision makers, usually executives, that review proposed project and programs for their value and return on investment for the organization. Precedence diagramming method - CORRECT ANSWER The most common method of arranging the project work visually. The PDM puts the activities in boxes, called nodes, and connects the boxes with arrows. The arrows represent the relationship and the dependencies of the work packages. Present value - CORRECT ANSWER A benefit measurement formula to determine what a future amount of funds is worth today. The formula is Present Value=Future Value/(1+i)^n where i is the value of return and n is the number of time periods. Problem solving - CORRECT ANSWER The ability to determine the best solution for a problem in a quick and efficient manner. Process adjustments - CORRECT ANSWER When quality is lacking, process adjustments are needed for immediate corrective actions or for future preventive actions to ensure that quality improves. Process adjustments may qualify for a change request and be funneled through the Change Control System as part of the integration management. Process improvement plan - CORRECT ANSWER Identifies methods to track and eliminate waste and non-value-added activities. Procurement - CORRECT ANSWER The process of a seller soliciting, selecting, and paying for products or services from a buyer. Procurement audits - CORRECT ANSWER The successes and failures within the procurement process are reviewed from procurement planning through contract administration. The intent of the audit is to learn from what worked and what did not work during the procurement processes.

Procurement documents - CORRECT ANSWER All of the documents for purchasing, such as request for quotes, invitation to bid, request for proposal, and the responses are stored as part of the project documentation. Procurement management plan - CORRECT ANSWER Describes the procurement process from solicitation to source selection. The plan may also include the requirements for selection as set by the organization. Product life cycle - CORRECT ANSWER The unique life, duration, and support of the thing a project creates. Product life cycles are separate from the project life cycle. Product scope - CORRECT ANSWER The attributes and characteristics of the deliverables the project is creating. Program manager - CORRECT ANSWER Coordinates the efforts of multiple projects working together in the program. Programs are comprised of projects, so the program manager is a stakeholder in each of the constituent projects within the program. Programs - CORRECT ANSWER A collection of projects working in unison to realize benefits that could not be achieved by managing each project independently of one another. Progress reports - CORRECT ANSWER These provide current information on the project work completed to date. Progressive elaboration - CORRECT ANSWER The process of starting with a large idea and through incremental analysis, actions, and planning the idea becomes more and more specific. Progressive elaboration is the generally-accepted planning process for project management, wherein the project management team starts very broad and works towards a specific, detailed plan. Project - CORRECT ANSWER An undertaking outside of normal operations to create a unique product, service, condition, or result. Projects are temporary while operations are ongoing.

Project baselines - CORRECT ANSWER There are three baselines in a project which are used to measure project performance: cost, schedule and scope. Project calendar - CORRECT ANSWER A calendar that defines the working times for the project. For example, a project may require the project team to work nights and weekends so as not to disturb the ongoing operations of the organization during working hours. In addition, the project calendar accounts for holidays, working hours, and work shifts the project will cover. Project charter - CORRECT ANSWER A document that authorizes the project, defines the high-level requirements, identifies the project manager and the project sponsor, and provides initial information about the project. Project communicaitons management - CORRECT ANSWER One of the ten project management knowledge areas; it is the planning and management of communication among project stakeholders. Project cost management - CORRECT ANSWER One of the ten project management knowledge areas; it is the estimating, budgeting and controlling of the project expenses. Project customer/end user - CORRECT ANSWER The person or group that will use the project deliverable. In some instances, a project may have many different customers. Project funding requirements - CORRECT ANSWER In larger projects this document identifies the timeline of when capital is required for the project to move forward. This document defines the amount of funds a project needs in order to reach its objectives and when the project funds are needed. Project governance - CORRECT ANSWER Defines the rules for a project and it's up to the project manager to enforce the project governance to ensure the project's ability to reach its objectives. The project management plan defines the project governance and how the project manager, the project team, and the organization will all follow the rules and policies within the project.

Project human resource management - CORRECT ANSWER One of the ten project management knowledge areas; projects are completed by people and the project manager generally oversees the management of the human resources on the project team. Project integration management - CORRECT ANSWER One of the ten project management knowledge areas; this knowledge area coordinates the activities and completeness of the other eight knowledge areas. Project life cycle - CORRECT ANSWER Unique to each project and comprised of phases of work. Project life cycles typically create a milestone and allow subsequent phases to begin. Project management - CORRECT ANSWER The management of the project within an organization. It is the initiation, planning, executing, monitoring and controlling, and closing of the temporary endeavor of the project. Project management integration - CORRECT ANSWER A project management knowledge area that coordinates all of the effort of the project's initiation, planning, executing, monitoring and controlling, and closing. Project Management Office (PMO) - CORRECT ANSWER Organizes and manages control over all projects within an organization. PMOs may also be known as a program management office, project office, or simply the program office. Coordinate all aspects, methodology, and nomenclature for project processes, templates, software, and resource assignment. Project management team - CORRECT ANSWER People on the project team that are involved with managing the project. Project manager - CORRECT ANSWER The person accountable for managing the project; guides the team through the project phases to completion. Project plan - CORRECT ANSWER A comprehensive document comprised of several subsidiary plans the communicates the intent and direction of the project.

Project portfolio management - CORRECT ANSWER A management process to select the projects that should be invested in. Specifically, it is the selection process based on the need, profitability, and affordability of the proposed projects. Project procurement management - CORRECT ANSWER One of the ten project management knowledge areas; this knowledge area oversees the purchasing and contract administration for a project. Project quality management - CORRECT ANSWER One of the ten project management knowledge areas; this knowledge area defines quality assurance, quality control and the quality policy for the project. Project risk management - CORRECT ANSWER A project management knowledge area that creates the risk management plan, performs qualitative and quantitative risk analysis, plans risk response, and monitors and controls the project risks. Project scope management - CORRECT ANSWER A project management knowledge area responsible for collecting project requirements, defining the project scope, create the WBS, performing scope verification, and controlling the project scope. The project scope statement includes the product scope description, product acceptance criteria, project deliverables, project exclusions, project assumptions and the project constraints. Project sponsor - CORRECT ANSWER Authorizes the project. This person or group ensures that the project manager has the necessary resources, including monies, to get the work done. The project sponsor is someone within the performing organization that has the power to authorize and sanction the project work, and is ultimately accountable for the project's success. Project team - CORRECT ANSWER The collection of individuals that will work together to ensure the success of the project. The project manager works with the project team to guide, schedule, and oversee the project work. The project team completes the project work.