Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

CAPM Practice Exam 2 - 4900 MGMT 51 Questions with Verified Answers, Exams of Business Economics

A practice exam for the certified associate in project management (capm) certification. It contains 51 multiple-choice questions with verified answers, covering various topics in project management. The questions test the candidate's understanding of project management processes, tools, techniques, and concepts such as change management, stakeholder management, risk management, cost management, procurement management, and more. A comprehensive review of the capm exam content and can be used by students or professionals preparing for the capm certification exam. The detailed explanations and rationale behind the correct answers make this practice exam a valuable resource for anyone seeking to enhance their project management knowledge and skills.

Typology: Exams

2023/2024

Available from 07/24/2024

paul-kamau-2
paul-kamau-2 🇺🇸

2.7

(3)

3.4K documents

1 / 5

Toggle sidebar

Related documents


Partial preview of the text

Download CAPM Practice Exam 2 - 4900 MGMT 51 Questions with Verified Answers and more Exams Business Economics in PDF only on Docsity!

CAPM Practice Exam 2 - 4900 MGMT 51 Questions with

Verified Answers

Which process is used to implement approved change requests: - CORRECT ANSWER Monitor and Control Project Work Project roles and responsibilities are often documented in a RACI matrix. RACI is an acronym for: - CORRECT ANSWER Responsibility, Accountability, Consult, Inform A ________ is a control point where deliverables are inspected to determine whether the project should continue onto its next phase, if changes or re-work is necessary, or if the project should be terminated. - CORRECT ANSWER Phase Gate Variables Sampling is used in Project Quality Management to determine conformity based on: - CORRECT ANSWER a continuous scale that measures the degree of conformity found in results under inspection You are presented the following project risks: What is the total Expected Monetary Value calculated for contingency reserve: - CORRECT ANSWER $1, The Stakeholder Register is an output of: - CORRECT ANSWER Identify Stakeholders Given the following factors: Earned Value = $14,000 Planned Value = $15, Actual Cost = $12,000What is the Cost Variance? - CORRECT ANSWER $2, All of the following may be considered Enterprise Environmental Factors, EXCEPT:

  • CORRECT ANSWER Lessons Learned Five levels of Stakeholder Engagement are: - CORRECT ANSWER Unaware, Resistant, Neutral, Supporting, Leading

The Cost of Non-Conformance includes: - CORRECT ANSWER Internal and External Failure Costs The procurement document that requests potential sellers to provide a price to perform all the detailed work specified by the buyer is known as a: - CORRECT ANSWER Request for Quotation Lessons Learned from a previous project are considered: - CORRECT ANSWER Organizational Process Assets The process of Plan Procurement Management will produce the following outputs, EXCEPT: - CORRECT ANSWER Procurement Management Plan A Discretionary Dependency is: - CORRECT ANSWER always depicted as a finish- to-start relationship The Scope Baseline refers to: - CORRECT ANSWER The scope value as it was presented in the Business Case. The Closing process group includes: - CORRECT ANSWER Transition of ongoing operational responsibilities The process Perform Qualitative Risk Analysis includes which of the following tools and techniques: - CORRECT ANSWER Risk Probability and Impact Assessment In the process Manage Team, interpersonal and team skills are: - CORRECT ANSWER Tool & Technique Outputs of the Control Costs process include: - CORRECT ANSWER Work Performance Information, Cost Forecasts, and Change Requests The receiver responds with disagreement to your message. According to the communication model, this is an example of: - CORRECT ANSWER The receiver providing feedback Which is NOT among the Tools and Techniques of the Estimate Costs process: - CORRECT ANSWER Reserve Analysis

The risk strategy that shifts the impact of a threat to a third party is called: - CORRECT ANSWER risk transfer The Project Manager is the person: - CORRECT ANSWER assigned by the organization to lead the team to achieve project objectives. In which Project Procurement Management process does Negotiation occur: - CORRECT ANSWER Conduct Procurements In the context of an Agile Life Cycle, the Product Backlog refers to: - CORRECT ANSWER The collection of requirements to be estimated, prioritized and selected for inclusion for an iteration. Plan Stakeholder Management is primarily concerned with which of the following:

  • CORRECT ANSWER Develop appropriate strategies and an actionable plan to effectively involve stakeholders based on their needs, expectations, and potential impact on the project Inputs to Plan Risk Response include: - CORRECT ANSWER Risk Register and Risk Management plan In the Precedence Diagram Method, a lag refers to: - CORRECT ANSWER a fixed delay imposed on a predecessor. The cost of change is: - CORRECT ANSWER Lowest at project initiation and increases over the project life cycle. The Business Case is input to which Project Integration process: - CORRECT ANSWER Develop Project Charter A risk with a potential positive outcome is called a: - CORRECT ANSWER Opportunity The Resource Breakdown Structure will decompose the ____ required to complete the project work: - CORRECT ANSWER Personnel, Material, and Equipment

A collection of projects that are managed in a coordinated way is called a: - CORRECT ANSWER Program The lowest level of decomposition in the WBS is called: - CORRECT ANSWER a work package Project Management Office (PMO) may be of the following types, EXCEPT: - CORRECT ANSWER Operating The process of updating the scope statement as it evolves over time is known as: - CORRECT ANSWER Progressive Elaboration According to Tuckman's ladder, team members adjust their work habits and learn to work together during this stage of team development: - CORRECT ANSWER Norming A project has a budget of $20,000. The planned value is currently $6,000. The project is 25% complete and $6,000 has been spent. Which statement is correct: - CORRECT ANSWER The project is on schedule Of the following contract types, which requires the seller to assume the risk of cost overruns? - CORRECT ANSWER Fixed Cost Using an online "live chat" function is an example of this communication method?

  • CORRECT ANSWER Interactive The diagram below shows the correlations between two variables. This tool is known as a: - CORRECT ANSWER Scatter Diagram Stakeholders can be identified: - CORRECT ANSWER Within any of the five project management process groups You receive an email from a vendor that uses unfamiliar terms and abbreviations. This is considered: - CORRECT ANSWER Noise

The Process Group that provides feedback to implement corrective action is: - CORRECT ANSWER Monitoring and Controlling Which of the following is a Tool and Technique of Manage Stakeholder Engagement, categorized as Interpersonal and Team Skills: - CORRECT ANSWER Mind Mapping The Project Management Plan describes ____ the project is to be executed, monitored, and controlled, and closed. - CORRECT ANSWER How Which is NOT among the Tools and Techniques of Collect Requirements: - CORRECT ANSWER Inspection The project manager receives an estimate from a service provider, with an explanation of the assumptions. A copy is also sent to the project sponsor. The encoding was performed by: - CORRECT ANSWER The service provider In a Virtual team: - CORRECT ANSWER Technology is utilized to facilitate communications An estimate for an activity duration is provided based on a set rate of 2 hours per unit. Your project requires 60 units, therefore 120 hours. This is an example of what type of estimation technique: - CORRECT ANSWER Parametric A Discretionary Dependency is: - CORRECT ANSWER an activity relationship based on a preferred approach that is not absolutely required