CDT practice exam Questions with 100% Correct Answers | Verified | Latest Update 2024, Exams of Advanced Education

CDT practice exam Questions with 100% Correct Answers | Verified | Latest Update 2024 The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: - Correct Answer-conditions of the contract General Requirements are part of: - Correct Answer-Specifications The three essential considerations in the evaluation of a product are - Correct Answer-Requirements, Criteria, and Tests Whose responsibility is it to furnish the Shop Drawings - Correct Answer-The Contractor The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Special Conditions. - Correct Answer-c) Division 01.

Typology: Exams

2023/2024

Available from 06/18/2024

professoraxel
professoraxel 🇺🇸

3.7

(28)

10K documents

1 / 23

Toggle sidebar

Related documents


Partial preview of the text

Download CDT practice exam Questions with 100% Correct Answers | Verified | Latest Update 2024 and more Exams Advanced Education in PDF only on Docsity!

CDT practice exam Questions with 100%

Correct Answers | Verified | Latest Update

The method of computation of Contractor's overhead and profits for Change Order prices, where both additions and deletions are involved, is found in the: - Correct Answer- conditions of the contract General Requirements are part of: - Correct Answer- Specifications The three essential considerations in the evaluation of a product are - Correct Answer-Requirements, Criteria, and Tests Whose responsibility is it to furnish the Shop Drawings - Correct Answer-The Contractor The division of the Work among multiple prime Contracts is described in: a) Instructions to Bidders.

b) Supplementary Conditions. c) Division 01. d) Special Conditions. - Correct Answer-c) Division 01. During the Project Conception Stage, the A/E may be retained to: a) Develop outline specifications b) Describe the character of the mechanical system c) Prepare renderings d) Assist in financial feasibility studies - Correct Answer-d) Assist in financial feasibility studies The person who becomes secondarily liable for another's debt or performance is called the: a) Guarantee b) Warrantor c) Guarantor d) Warrantee - Correct Answer-c) Guarantor What is the main purpose of MasterFormat?

a) for scheduling, value management, recording of design data and managing costs. b) used during the planning stage of a project. c) to organize the Project Manual, reference keynotes and detailed cost estimates. d) when there is a standardized need for information to appear upon each page of a project manual. - Correct Answer- c) to organize the Project Manual, reference keynotes and detailed cost estimates. Integrated projects are distinguished by all of the following characteristics except: a) Development of virtual project model through input from a collaborative team b) Trust-based collaboration between project team members c) Maximized efficiency through design, fabrication, and construction d) "Just as needed" team involvement to reduce owner's pre- construction expenses - Correct Answer-d) "Just as needed" team involvement to reduce owner's pre-construction expenses Outline Specifications are written for

a) only Divisions 02-14 where actual products are discussed b) Divisions 01- c) only Divisions 01-14 (excluding mechanical and electrical) d) the exclusive use of the A/E - Correct Answer-b) Divisions 01- An example of a MasterFormat Level 3 specification Section is: a) 05 00 00 Metals. b) 05 20 00 Metal Joists. c) 05 21 00 Steel Joist Framing. d) 05 21 19 Open Web Steel Joist Framing - Correct Answer-d) 05 21 19 Open Web Steel Joist Framing What activities take place in the Project Conception Stage? a) The engineers develop the mechanical and electrical systems. b) The site is selected and the demolition is done. c) Feasibility studies and budget is set. d) The program is evaluated and the engineers are selected. - Correct Answer-c) Feasibility studies and budget is set.

The document recommended to organize preliminary construction information into a standard order on the basis of systems and assemblies is: a) MasterFormat b) Uniformat c) Outline Specifications d) Project Manual - Correct Answer-b) Uniformat All design and construction drawings can be classified as one of two types of views: a) Numeric and graphic. b) Vertical and horizontal. c) Scaled and nonscaled. d) Exterior and interior - Correct Answer-c) Scaled and nonscaled. Substitution requirements and procedures during bidding a) Are not allowed under most public bidding statutes. b) Are modified by the Supplementary Conditions. c) Are stated in the Instructions to Bidders.

d) Are provided by requests by telephone. - Correct Answer-c) Are stated in the Instructions to Bidders. Submittal requirements for Mechanical and Electrical work are specified in: a) General Conditions b) Supplementary Conditions c) Division 01 d) Division 22 and 26 - Correct Answer-c) Division 01 The Procurement Requirements are a) a part of the Procurement Documents, but not the Contract Documents. b) a part of the Contract Documents. c) a part of the Procurement Documents but not the Project Manual. d) in the same part as the Contract Modifications. - Correct Answer-a) a part of the Procurement Documents, but not the Contract Documents. Since he or she is most familiar with a product, the manufacturer's representative should:

a) Write the specification section. b) Review the specification section. c) Supply accurate information to the A/E d) Not be consulted in order to avoid a conflict of interest. - Correct Answer-c) Supply accurate information to the A/E Which of the following requires a Change Order? a) Extension of bid date. b) Modification of the Work. c) Revision of Bidding Documents affecting construction cost. d) Revision of Bidding Documents affecting completion time. - Correct Answer-b) Modification of the Work. Experienced owners may require project teams to utilize integrated project delivery based upon: a) Increased coordination of construction documentation. b) Desire Greater prefabrication opportunities. c) Optimized site utilization. d) All of the above. - Correct Answer-d) All of the above. The Conditions of the Contract include

a) Contract Forms, General Conditions, and Supplementary Conditions. b) General Conditions and Supplementary Conditions. c) General Conditions, Supplementary Conditions, and Division 01. d) Documents within the project manual, except the Bidding Requirements. - Correct Answer-b) General Conditions and Supplementary Conditions. The mood that is recommended for specifications is: a) The imperative mood b) The indicative mood c) The symbolic mood d) None of the above - Correct Answer-a) The imperative mood

  1. During the bid phase, substitutions may be proposed by: a) Prime Bidders only b) Subcontractors only c) Bidders and sub-bidders d) Contractors and Subcontractors only - Correct Answer-c) Bidders and sub-bidders

What are the three components of project design team coordination? a) Duplication, omissions and discrepancies b) Division One, Division Two and Division Three c) General, Products and Execution d) Organization, Execution and Quality Assurance - Correct Answer-d) Organization, Execution and Quality Assurance The burden of performance is assumed by whom when a descriptive specification is used? a) Manufacturer b) Contractor c) Architect/Engineer d) Owner - Correct Answer-c) Architect/Engineer Which of the following is TRUE concerning application of integrated project delivery? a) Mutual benefit and reward, and because of early involvement, compensation based on the value added and what's best for the project.

b) Collaborative team effort reduces planning and design expenses. c) Determination of liability for decisions is generally made by the team leader in order to reduce arbitration expenses. d) Technologies such as data exchange protocols evolve on a phase-by-phase basis. - Correct Answer-a) Mutual benefit and reward, and because of early involvement, compensation based on the value added and what's best for the project. The construction subcontracts a) are the contracts between the owner and the contractor. b) are the contracts between the owner and the construction manager. c) are the contracts between the contractor and the A/E. d) are the contracts between the contractor and the subcontractors. - Correct Answer-b) are the contracts between the owner and the construction manager. Owner occupancy of the premises during construction: a) Should not be specified in section covering temporary facilities b) Is specified in Section 01 10 00 Summary.

c) Is not a concern of the specifier. d) Precludes Contractor's use of existing facilities such as stairs, elevators and sanitary facilities. - Correct Answer-b) Is specified in Section 01 10 00 Summary. The Invitation to Bid: a) contains detailed requirements for submittal of bids. b) legally defines the Contract Documents for a project. c) is designed to attract qualified bidders. d) includes the Instructions to Bidders and the Bid Forms - Correct Answer-c) is designed to attract qualified bidders. During the bidding process: a) Bids may be discussed before the set time of their opening b) Subcontractors may not use Bid Depositories c) The Contractor should expect his potential Subcontractors to review those plans available in plan rooms. d) The bidder should be allowed to withdraw his bid before the specified time for receipt of bids. - Correct Answer-d) The bidder should be allowed to withdraw his bid before the specified time for receipt of bids.

Which of the following is considered as part of the specifications? a) General Conditions b) Supplementary Conditions c) Division 02-19 Facility Construction d) All of the above - Correct Answer-c) Division 02-19 Facility Construction

  1. The preprinted General Conditions are modified by: a) additional General Conditions. b) Supplementary Conditions. c) Supplementary General Conditions. d) Special Conditions. - Correct Answer-b) Supplementary Conditions.
  2. Master Format 2004/2010 is based upon: a) A five digit numbering system b) A six and eight digit numbering system c) An alpha numeric numbering system

d) A system using not more than two decimal places to aid in filing an project identification - Correct Answer-b) A six and eight digit numbering system

  1. Which of the following changes to the Contract Documents must be signed by Owner? a) Proposal Requests. b) Conditions. c) Change Orders. d) Special Orders. - Correct Answer-c) Change Orders.
  2. The correct title for Division 10 is: a) Accessories b) Specialties c) Equipment d) Special Construction - Correct Answer-b) Specialties
  3. "Section drawings" are cut vertically through and perpendicular to project materials to: a) Show water-tight construction b) Show their detailed arrangement

c) Show which surfaces are to be finished d) Show Contractor what finished project is to look like - Correct Answer-b) Show their detailed arrangement

  1. MasterFormat provides a standard system for: a) Numbering and titling Section paragraphs. b) Assigning Work to Subcontractors or trades. c) Titling and arranging Project Manuals. d) Establishing construction sequence. - Correct Answer-c) Titling and arranging Project Manuals.
  2. The following are true concerning CSI's GreenFormat online product data resource except: a) GreenFormat product information is organized by MasterFormat numbers. b) Manufacturers provide a technical contact for followup questions from GreenFormat users. c) CSI validates and certifies information contained in GreenFormat. d) Information in GreenFormat supports specifying by proprietary, reference standard, performance, and descriptive

methods. - Correct Answer-c) CSI validates and certifies information contained in GreenFormat.

  1. Which two specification methods are both prescriptive, i.e., the products and processes are specified, but not the results: a) Descriptive and Performance b) Performance and Reference c) Proprietary and Reference d) Descriptive and Proprietary - Correct Answer-d) Descriptive and Proprietary
  2. Views of vertical planes are known as: a) Details b) Elevations c) Cross sections d) Plan views - Correct Answer-b) Elevations
  3. When cross-referencing between the Drawings and Specifications the proper term is: a) Refer to specifications.

b) See specifications. c) See detail requirements in specifications. d) The practice is discouraged. - Correct Answer-d) The practice is discouraged.

  1. Which one of the following statements is correct? a) Conflicts and discrepancies are reduced when important information is repeated. b) Important requirements stated in one document should be repeated in other documents to ensure compliance. c) Each requirement should be stated only one time and in the right place. d) The Manual of Practice stresses multiplicity of locations for retrieval of information. - Correct Answer-c) Each requirement should be stated only one time and in the right place.
  2. Multiple-prime contracts are often a part of a) Turn-key construction b) Phased Construction c) Long duration construction projects d) Fast track construction - Correct Answer-d) Fast track construction
  1. Marked up or corrected contract drawings that indicate changes incorporated in the Work are called: a) Bidding Requirements b) Contract Forms c) Conditions of the Contract d) Record Drawings - Correct Answer-d) Record Drawings
  2. The requirements for Contractor to install Owner furnished products should be included in: a) Instructions to Bidders. b) Supplementary Conditions. c) Division 01. d) Specifications Sections. - Correct Answer-c) Division 01.
  3. Administrative provision of the construction contract are: a) Fully specified in the Conditions of the Contract b) The Contractor's responsibility and should not be specified c) Written in Division 01 to expand on provision in the Conditions of the Contract

d) Written in a manner to avoid Owner responsibilities - Correct Answer-c) Written in Division 01 to expand on provision in the Conditions of the Contract

  1. Guidance for the proper preparation of the bid form and any attached unit price schedules should be included in the a) Invitation to Bid. b) Instructions to Bidders. c) Specifications d) Addenda - Correct Answer-b) Instructions to Bidders.
  2. Division 01 sections specify: a) Administrative requirements, procedural requirements, temporary facilities and controls, performance requirements and life cycle activities. b) Legal requirements which would not normally be included in standard General Conditions c) Special Conditions of the Contract d) Technical requirements which do not fit in Division 2-16 - Correct Answer-a) Administrative requirements, procedural requirements, temporary facilities and controls, performance requirements and life cycle activities.
  1. Specifications are: a) Reference tools used by the Contractor in conjunction with the drawings and the agreement. b) Technical documents describing the details of building construction for a specific project. c) Legally enforceable Contract Documents that should be prepared with concern and respect for their legal status. d) Describe the technical requirements of the contract in a text type format. - Correct Answer-c) Legally enforceable Contract Documents that should be prepared with concern and respect for their legal status.
  2. Provisions in the Conditions of the Contract: a) Have priority over Division 01 b) Are superseded by Division 01 c) Are expanded by the provisions of Division 01 d) Are independent and Division 01 provisions have no effect - Correct Answer-c) Are expanded by the provisions of Division 01
  1. Which of the following words should be capitalized in a specification? a) Subcontractor, Owner, and Supplier b) Architect/Engineer, Contractor and Owner c) Owner, Contractor, and Supplier d) Only Owner and Contractor - Correct Answer-b) Architect/Engineer, Contractor and Owner
  2. A requirement set by authority, custom, or general consensus which is established as an accepted criteria is called a: a) building code. b) reference standard. c) quality control standard. d) specification master. - Correct Answer-b) reference standard.
  3. The difference between open and closed proprietary specifications concerns: a) allowances b) submittals c) substitutions

d) alternates - Correct Answer-c) substitutions

  1. Life cycle analysis (LCA) is characterized by all of the following except: a) Support for selection of products with the lowest total environmental impact. b) Market analysis of demand for sustainable products c) Questions regarding the materials and impacts related to each phase of the product life cycle d) Estimates of the cumulative environmental impacts resulting from all stages of a product life cycle - Correct Answer-b) Market analysis of demand for sustainable products
  2. Each specification section having a product covered by an allowance should cross-reference the Division 01 section on Allowances for the: a) Allowance amount. b) Bidding Requirements. c) Product data. d) Installation instructions. - Correct Answer-a) Allowance amount.
  1. The following are all advantages gained by using standard agreement forms EXCEPT: a) Parties familiarity with the forms. b) Uniformity of terminology. c) Legal precedents interpreting the documents. d) Recognized customs resulting from longtime use. - Correct Answer-d) Recognized customs resulting from longtime use.
  2. An Alternate becomes a part of the Contract Documents: a) When the bids are opened. b) When the Owner makes his decision to accept. c) On Architect/Engineer's recommendation d) When stipulated in the Owner-Contractor Agreement. - Correct Answer-d) When stipulated in the Owner-Contractor Agreement.
  3. Division numbers are fixed, but specification section numbers and titles: a) can change to fill in blanks so as to be sequential b) can never be changed from that listed in MasterFormat

c) are fixed for level 2 and level 3 sections but can be individually selected for level 4 sections d) are to be shifted as needed when level 4 sections are added

  • Correct Answer-c) are fixed for level 2 and level 3 sections but can be individually selected for level 4 sections
  1. The best way to proceed with bidding and contract award even though certain design decisions have not been made is through the use of: a) Unit prices. b) Quantity allowances. c) Cash allowances. d) Alternates. - Correct Answer-d) Alternates.