Download CESSWI Practice 60 Questions With Complete Solutions(Verified) and more Exams Agricultural engineering in PDF only on Docsity! CESSWI Practice 60 Questions With Complete Solutions(Verified) Certified erosion sediment and stormwater inspector - Correct answer CESSWI Offers no mitigation - Correct answer Ignorance Controls water pollution by regulating point sources that discharge pollutants into waters of the US - Correct answer NPDES National pollutant discharge elimination system MS4 - Correct answer Municipal Separate Storm Sewer System ESCP - Correct answer Erosion and sediment control plan Has regulatory authority over the cwa - Correct answer EPA Return flow from irrigated agriculture or their run off - Correct answer Does not apply to the storm water term Only directly to. Or though a separate storm water system into us waters only - Correct answer NPDES REQUIREMENTS Commercial, retail, light industrial and institutional facilities. Less than 5 acres MS4 serving fewer than 100k people - Correct answer Phase II Agriculture is exempt only for - Correct answer Crop production O&G, forestry, and agriculture discharges are - Correct answer Exempt Waiver "construction rainfall erosivity waiver" from phase II requirements under 2 conditions - Correct answer Low rainfall potential Based on TMDL *only for small sites Triennial review process - Correct answer States required to review and revise if necessary Umbrella coverage - Correct answer General Permit Identifies potential sources of pollution that may effect storm water discharges. Describes management practices that are to be implemented to reduce pollutants discharges in stormwater - Correct answer SWPPP NOI - Correct answer Brief description of project Estimated timetable for major activities Estimated disturbed acres of soil Certification that the swppp provides compliance NOI needs to be submitted - - Correct answer At least 7 days before activity. The SWPPP must be prepared before - Correct answer The NOI is filed Under EPAs general permit disturbed areas that will not be redisturbed within ________ days must be stabilized by the _____ day - Correct answer 14 EPAs GP also requires a sediment basin be installed where more than _____ acres in the upstream drainage area are disturbed at one time. - Correct answer 10 acres A sediment basin must provide _________ cubic feet of storage for every _______ acre of land that it drains - Correct answer 3600//1 EPA gives the State _______ days then they take action. - Correct answer 30 Arrival introduction - Correct answer -Credentials and ID (who you are) -Purpose of visit (why are you there) -What to expect at the end of the visit -What they may receive and when follow up will occur Pre construction meetings - Correct answer 1. Clarify objectives 2. Designate a contact person for communicating concerns 3. Determine if the sequence and plan will work, if not revise. 4. Make sure everyone reviews the plan/SWPPP 5. Remind everyone that BMPs are performance based and could require changes, and establish procedure for those changes 6 Hold your conference on site. Let them see the big picture 7. Verify schedules 8. Discuss maintenance requirements 9. Discuss containment, storage, and spill procedures. 10. Establish open commutation with all responsible individuals If it isn't written down. - Correct answer It didn't happen. The only proof of site conditions is - Correct answer Pictures and written records Note taking - Correct answer Defendable and objective. NOT inflammatory or subjective. (Note taking) Initial and date all - Correct answer Revisions and changes (Note taking) Be specific, do not - Correct answer Generalize