Download CN283 Construction Estimating Exam Questions And Answers and more Exams Construction in PDF only on Docsity! CN283 Construction Estimating Exam Questions And Answers The estimating process, and people that estimate are needed in - correct answer All of the above The ______________ views of a document set (the plans) are ideal for determining the composition of, or what is in, a wall . - correct answer Section A typical contractual agreement should include - correct answer All of the above The specification for asphalt shingles would likely include ____________________ - correct answer the approved manufacturers, the tolerance of acceptability for the shingles, the performance expectation, the physical properties of the shingle, storage requirements Although sometimes used interchangeably, the Advertisement to Bid and the Invitation to bid do have subtle differences. Primarily, the Advertisement to Bid is exclusively used for privately funded projects. - correct answer False A site visit is a common occurrence (sometimes required) when planning to bid a project. Information that should be collected during the visit should include ______________. - correct answer All of the above CN283 Construction Estimating Exam Questions And Answers Per class discussion, an alternate is almost like a separate project, in that the base bid includes one thing, but the alternate seeks another. Example: the base bid requires pricing carpeting for the flooring, but the alternate seeks a separate price for porcelain tile. - correct answer true An assembly estimate for a gypsum board partition wall would likely include at least _____________ - correct answer All of the above In a single contract arrangement, the owner maintains responsibility for primary subcontractors. - correct answer False Workers' Compensation is an optional insurance that employers provide to employees for workplace violence. - correct answer False An Owner that withholds a percentage of each progress payment is incorporating a common practice that is contractually known as ___________________- - correct answer Retainage Conceptual estimates commonly contain a high level of detail. - correct answer False CN283 Construction Estimating Exam Questions And Answers The contractor will make timely payments for labor and material according to the contract documents - correct answer Payment Bond The owner is guaranteed that the work will be completed in accordance with the contract documents - correct answer Performance Bond If awarded within the specified time period, the contractor will enter into a contractual agreement. - correct answer Bid Bond Division 03 of the CSI MasterFormat covers _____________ - correct answer Concrete The Instructions to Bidders includes a lot of information, among other things, it includes the Owner's right to accept or reject any / all bids and to waive any formalities. - correct answer True Written instructions that describe the quality requirements of the of the project materials and their performance - correct answer Technical Specifications Sections, details and elevations that show dimensions and locations of building elements and how they fit together - correct answer Working Drawings CN283 Construction Estimating Exam Questions And Answers Contractors are invited to bid on a project with information that provides a brief project summary, scope, size, location and owner - correct answer Invitation to Bid What factor would influence labor cost / productivity in a project that is being estimated? - correct answer All of the Above A common error or omission during the estimating process is _______________ - correct answer All of the Above The Go / No Go decision is determining whether to bid or not to bid on a particular project. A factor in making this determination would be your company's current workload, and if you would be able to complete the project if you were successful in your bidding. - correct answer True The lump sum agreement stipulates that the contract will have one payment due from the owner that is made at the beginning of the project. - correct answer False If you were to purchase an estimating software, you would likely still need to customize the cost database in order make sure your _____________ is/are used. - correct answer All of the Above CN283 Construction Estimating Exam Questions And Answers An addendum will always have a cost impact on a project. - correct answer Flase Things like roof shingles, joint sealants, insulation and waterproofing would fall under Division _________________ of the CSI MasterFormat. - correct answer 07 When preparing an estimate, the importance of proper organization and structure cannot be overstated. - correct answer True Things like carpet, ceramic tile, drywall, acoustical ceilings, paint...etc would fall under Division _________________ of the CSI MasterFormat. - correct answer 09 Within some contract documents (bids, proposals, change orders, ...etc), both words and numbers are used to show a quoted total. If there is a discrepancy between the two; words will take precedence. - correct answer True A square-foot / budgetary estimate contains a lower level of detail than a detailed estimate. - correct answer True CN283 Construction Estimating Exam Questions And Answers If the annual home office costs were $500,000 and the annual company revenue was $10,000,000, the percentage of home office revenue would be ___________. - correct answer 5% Regarding equipment, an item with a definable cost that should be included in an hourly charge is____________. - correct answer All of the above Only exempt employees are eligible for overtime under guidelines from the Fair Labor Standards Act. - correct answer False Something that may alter the labor productivity in a project is _____________. - correct answer All of the above Two (generally accepted) categories of overhead costs are ___________ and ______________. - correct answer home office and jobsite The text describes contingencies a couple of different ways. One is to account for things either left from their bid or supplemental to their bid - correct answer risk A work activity that involves removing trees, stumps and other foliage is (often) called _________. - correct answer clearing and grubbing CN283 Construction Estimating Exam Questions And Answers The angle of repose is consistent across all soil types and the varying moisture content of those soils. - correct answer false The compaction and swell percentages for various soils should balance to 1 - correct answer False You are planning to pour a basement slab that will be equipped with in- floor heat and a herringbone stamped pattern with in the integral red/auburn color, and you intend to complete the project in one pour. A few details (think about directly related work) will take time and need to be included. One of those details would be a / an / the _________________. - correct answer all of the above A variable involved in concrete estimating (in addition to the quantity of cubic yards) is ______________. - correct answer air content, color, strength, finish Type of estimate that takes the longest and is the most accurate - correct answer Detailed Estimate Builders Risk Insurance - correct answer Fire and property damage insurance for a project during construction, usually purchased by the owner. Also called property insurance.