CON1100V STUDY GUIDE
100% VERIFIED ANSWERS
2024/2025 CORRECT
1. I MUST TURN IN THE STUDENT NOTEBOOK AT THE END OF CLASS IN ORDER TO RECEIVE A
PASSING GRADE IN CON 1100V.
FALSE
2. SUCCESSFULLY COMPLETING THE EXERCISES AND ACTIVITIES WITHIN THE NOTEBOOK WILL PLAY
A CRITICAL ROLE IN MY ABILITY TO STUDY FOR AND PASS THE CON 1100V ASSESSMENT.
TRUE
3. THE CONTRACTING CERTIFICATION PROGRAM CONSISTS OF FOUR COURSES, WHICH MUST BE
REGISTERED FOR SEPARATELY.
TRUE
4. THE CONTRACTING CERTIFICATION PROGRAM CONSISTS OF SIX ELEMENTS; THEY ARE:
1 - EDUCATION
2 - TRAINING
3 - EXPERIENCE
4 - ASSESSMENT
5 - VALIDATION
6 - CERTIFICATION CURRENCY
5. THE CONTRACTING CERTIFICATION TRAINING PROGRAM STREAMLINES CURRENT TRAINING
REQUIREMENTS INTO THE FOLLOWING FOUR NEW DAU COURSES:
1 - FOUNDATIONAL SKILLS
2 - PRE-AWARD
3 - AWARD
4 - POST-AWARD
6. THE DAU CERTIFICATION EXAM PREPARATION COURSE...
IS OPTIONAL
SUCCESSFULLY PASSING THE CONTRACTING CERTIFICATION EXAM, ALONG WITH THE OTHER
CERTIFICATION CRITERIA, WILL SIGNIFY THAT YOU HAVE ACHIEVED ____________ READINESS FOR
A CONTRACTING CAREER
INITIAL
8. TO MAINTAIN CERTIFICATION CURRENCY, I WILL BE REQUIRED TO COMPLETE ______
CONTINUING LEARNING HOURS, EVERY ___________.
80 HOURS; 2 YEARS
9. AS YOUR POSITION AND/OR MISSION CHANGES, ___________ WILL CONTINUALLY PROVIDE
RESOURCES, SUCH AS ___________________, TO ENSURE YOUR SUCCESS IN THE JOB.
DAU; CREDENTIALS AT THE TIME OF NEED
10. __________________ ARE RESPONSIBLE FOR ENSURING AND ATTAINING THE LEARNING
OBJECTIVES.
STUDENTS
11. THE CONTRACTING CERTIFICATION EXAM WILL BE BASED UPON THE DOD COMPETENCY
MODEL, WHICH CAN BE FOUND WITHIN MS TEAMS (SEE NAVIGATING MS TEAMS PAGE FOR MORE
INFORMATION).
TRUE
12. ______________ EVENTS ARE ___________, VIRTUAL SESSIONS AND YOU MUST LOGIN
TOGETHER WITH THE CLASS TO GET CREDIT.
INSTRUCTOR-LED; SELF-PACED
13. ______________ EVENTS ARE ________________ UNITS OF INSTRUCTION THAT YOU
COMPLETE ONLINE TO GET CREDIT.
SELF-PACED; INDIVIDUAL
14. WHICH OF THE EIGHT UNITS OF CON 1100V IS A MULTI-DAY, INSTRUCTOR-LED EVENT WITH ITS
OWN ASSESSMENT?
UNDERSTANDING REGULATIONS
15. UNIT 04, UNDERSTANDING REGULATIONS, WILL TAKE AN ESTIMATED _______ _______ TO
COMPLETE IN A LIVE ENVIRONMENT.
4.5 DAYS
UNIT 04, UNDERSTANDING REGULATIONS, INCLUDES AN ASSESSMENT THAT IS WORTH _______%
OF MY FINAL GRADE IN CON 1100V.
25%
18. IN ORDER TO PASS CON 1100V, I MUST OBTAIN _______% OF ALL AVAILABLE POINTS.
80%
IF I DO NOT SUCCESSFULLY PASS CON 1100V ON MY FIRST ATTEMPT, I -
MUST RETAKE CON 1100.
IT IS ________________ RESPONSIBILITY TO COORDINATE MY CON 1100V SCHEDULE WITH MY
SUPERVISOR TO ENSURE I HAVE NO SIGNIFICANT CONFLICTS, ESPECIALLY FOR INSTRUCTOR-LED
EVENTS
MY OWN
1. WHAT ARE THE FIVE KEY STAGES OF THE CONTRACTING LIFE CYCLE?
1 - ACQUISITION PLANNING
2 - SOLICITATION
3 - PROPOSAL EVALUATION
4 - CONTRACT AWARD
5 - CONTRACT ADMINISTRATION
1. WHICH STAGE INCLUDES MODIFICATIONS, PERFORMANCE, PAYMENTS, AND CONTRACT
CLOSEOUT?
CONTRACT ADMINISTRATION
1. THE PURPOSE OF THE CONTRACTING SUBWAY MAP IS TO:
PROVIDE YOU WITH A GENERALIZED ORDER OF EVENTS IN THE ACQUISITION CONTRACTING
PROCESS
1. WHAT AFFECTS HOW WE EFFECTIVELY MOTIVATE CONTRACTORS THROUGH THE LIFE CYCLE?
INDUSTRY ENGAGEMENT
1. WHEN CONTEMPLATING THE BUSINESS STRATEGY OF A PROCUREMENT, WHAT SHOULD THE
ACQUISITION TEAM CONSIDER WHEN ALIGNING THE STRATEGY TO THE CONTRACTOR
MOTIVATIONS?
WHAT MOTIVATES INDUSTRY
1. CONTRACT MANAGEMENT REQUIRES BOTH GENERAL AND BUSINESS SKILLS IN AREAS SUCH AS
PROBLEM SOLVING, CRITICAL THINKING, COSTUMER FOCUS, COMMUNICATION, AND TECHNICAL
CREDIBILITY. SUCCESSFUL CONTRACT MANAGEMENT DOES NOT ALLOW FOR ADAPTABILITY IN A
CHANGING BUSINESS ENVIRONMENT.
FALSE
IT SAYS THAT CONTRACTING OFFICERS SHOULD TAKE THE LEAD IN ________________________
AND ENSURING THAT ____________________________.
ENCOURAGING BUSINESS PROCESS INNOVATIONS; BUSINESS DECISIONS ARE SOUND
TO RAPIDLY DEVELOP FIELDABLE PROTOTYPES WITHIN AN ACQUISITION PROGRAM TO
DEMONSTRATE NEW CAPABILITIES AND/OR RAPIDLY FIELD PRODUCTION QUANTITIES OF SYSTEMS
WITH PROVEN TECHNOLOGIES THAT REQUIRE MINIMAL DEVELOPMENT.
MIDDLE TIER DOD
TO ACQUIRE INFORMATION SYSTEMS THAT SUPPORT DOD BUSINESS OPERATIONS.
DEFENSE BUSINESS
TO FIELD CAPABILITIES TO FULFILL URGENT EXISTING AND/OR EMERGING OPERATIONAL NEEDS OR
QUICK REACTIONS IN LESS THAN TWO YEARS.
URGENT CAPABILITY
TO FACILITATE RAPID AND ITERATIVE DELIVERY OF SOFTWARE CAPABILITY SYSTEMS (DBS) (E.G.,
SOFTWARE-INTENSIVE SYSTEMS AND/OR SOFTWARE-INTENSIVE COMPONENTS OR SUB-SYSTEMS)
TO THE USER.
SOFTWARE ACQUISITION
TO ACQUIRE AND MODERNIZE MILITARY UNIQUE PROGRAMS THAT PROVIDE ENDURING
CAPABILITY.
MAJOR CAPABILITY
TO ACQUIRE SERVICES FROM THE PRIVATE SECTOR INCLUDING KNOWLEDGE-BASED,
CONSTRUCTION, ELECTRONICS AND COMMUNICATIONS, EQUIPMENT, FACILITIES, PRODUCT
SUPPORT, LOGISTICS, MEDICAL, RESEARCH AND DEVELOPMENT, AND TRANSPORTATION SERVICES.
ACQUISITION OF SERVICES
ACQUISITION PLANNING MUST INVOLVE ALL PERSONNEL RESPONSIBLE FOR SIGNIFICANT ASPECTS
OF THE ACQUISITION. WHAT IS THE PURPOSE OF ACQUISITION PLANNING?
TO ENSURE THAT THE GOVERNMENT MEETS ITS NEEDS IN THE MOST EFFECTIVE, ECONOMICAL, AND
TIMELY MANNER
MARKET RESEARCH MEANS ________________ AND ______________ INFORMATION ABOUT
CAPABILITIES WITHIN THE MARKET TO _____________ AGENCY NEEDS.
COLLECTING, ANALYZING, SATISFY
SIMPLIFIED ACQUISITION IS AN ACQUISITION METHOD PRESCRIBED BY FAR PART 13 FOR
PURCHASING SUPPLIES AND SERVICES, INCLUDING CONSTRUCTION, RESEARCH AND
DEVELOPMENT, AND COMMERCIAL ITEMS, FOR WHICH THE AGGREGATE AMOUNT DOES NOT
EXCEED THE _____________________________________ WHICH CURRENTLY IS
SIMPLIFIED ACQUISITION THRESHOLD, $7.5 MILLION ($15 MILLION FOR ACQUISITIONS AS
DESCRIBED IN 13.500 (C)).
GENERALLY, CONTRACT TYPES ARE GROUPED INTO WHAT TWO FAMILIES?
1ST FAMILY - FIXED-PRICE
2ND FAMILY - COST-REIMBURSEMENT
7. WHAT IS THE OFFICIAL U.S. GOVERNMENT WEBSITE THAT CONTRACTING OFFICERS USE TO
PUBLICIZE CONTRACTING OPPORTUNITIES?
SAM.GOV
8. WHEN DRAFTING A SOLICITATION, WHAT TOOL PROVIDES GUIDANCE ON THE USE OF ALL
PROVISIONS AND CLAUSES CONTAINED IN THE FEDERAL ACQUISITION REGULATION (FAR),
DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT (DFARS), DEPARTMENT OF VETERANS
AFFAIRS ACQUISITION REGULATION (VAAR), AND DEPARTMENT OF ENERGY ACQUISITION
REGULATION (DEAR)?
IT ALSO INCLUDES GUIDANCE ON THE USE OF PROVISIONS AND CLAUSES CONTAINED IN DOD
CLASS DEVIATIONS.
DAU PROVISION AND CLAUSE MATRIX
WHICH BEST VALUE SOURCE SELECTION PROCESS ALLOWS THE GOVERNMENT TO AWARD TO
OTHER THAN THE LOWEST PRICED OFFEROR OR OTHER THAN THE HIGHEST TECHNICALLY RATED
OFFEROR?
TRADEOFF
SOLICITATIONS UNDER SEALED BID PROCEDURES ARE CALLED
INVITATION FOR BIDS
SOLICITATIONS UNDER NEGOTIATED PROCEDURES ARE CALLED
REQUESTS FOR PROPOSAL
SOLICITATIONS UNDER SIMPLIFIED ACQUISITION PROCEDURES MAY REQUIRE SUBMISSION OF
EITHER A QUOTATION OR AN OFFER.
TRUE
AMENDMENTS ISSUED BEFORE THE ESTABLISHED TIME AND DATE FOR RECEIPT OF PROPOSALS
SHALL BE ISSUED TO ___________ PARTIES RECEIVING THE SOLICITATION.
ALL
AMENDMENTS ISSUED AFTER THE ESTABLISHED TIME AND DATE FOR RECEIPT OF PROPOSALS
SHALL BE ISSUED TO ALL OFFERORS THAT HAVE NOT BEEN ___________ FROM THE COMPETITION.
ELIMINATED
THE GOVERNMENT'S POLICY ON PRICING IS THAT CONTRACTING OFFICERS SHALL PURCHASE
SUPPLIES AND SERVICES FROM ______________________________ AT
__________________________.
RESPONSIBLE SOURCES; FAIR AND REASONABLE PRICES
AFTER THE SOLICITATION CLOSES AND PRIOR TO AWARD, CLARIFICATIONS (A TYPE OF EXCHANGE)
ARE USED TO HELP DETERMINE IF AN OFFEROR SHOULD BE INCLUDED IN THE COMPETITIVE
RANGE.
A SUCCESSFUL PROPOSAL EVALUATION DEPENDS ON:
1 - APPROPRIATE, WELL-DEFINED EVALUATION CRITERIA
2 - EVALUATION RATING STANDARDS THAT ARE UNDERSTOOD AND APPLIED CONSISTENTLY AMONG
EVALUATORS AND AMONG ALL PROPOSALS BEING EVALUATED
3 - A CAREFUL REVIEW OF THE LANGUAGE IN EACH PROPOSAL TO ASCERTAIN HOW THE OFFEROR
WILL MEET THE REQUIREMENTS OF THE RFP AND TO IDENTIFY ASSUMPTIONS AND STATEMENTS
THAT MAY INDICATE INCREASED COST/PRICE AND/OR RISK TO THE GOVERNMENT.
4 - FULLY DOCUMENTED EVALUATION FINDINGS
THE CPRG IS A FIVE-VOLUME SET THAT INCLUDES:
VOLUME 1 - PRICE ANALYSIS
VOLUME 2 - QUANTITATIVE TECHNIQUES FOR CONTRACT PRICING
VOLUME 3 - COST ANALYSIS
VOLUME 4 - ADVANCED ISSUES IN CONTRACT PRICING
VOLUME 5 - NEGOTIATION TECHNIQUES
WHEN EVALUATING AND NEGOTIATING A SOLE SOURCE PROCUREMENT, THE
____________________________________________ IS A LIVING DOCUMENT ENCOMPASSING
OVER 40 TECHNIQUES WHICH CAN BE LEVERAGED TO INCREASE EFFICIENCY THROUGHOUT THE
ACQUISITION PROCESS.
DOD SOLE SOURCE STREAMLINING TOOLBOX
THE CONTRACTING OFFICER'S WARRANT (SF 1402) CITES THE LIMITATIONS ON THE SCOPE OF
AUTHORITY TO SIGN THE AWARD DOCUMENT ON BEHALF OF THE GOVERNMENT.
TRUE
2. WHAT ARE THE TWO MAJOR TYPES OF DEBRIEFINGS?
1. PREAWARD DEBRIEFINGS
2. POSTAWARD DEBRIEFINGS
WHAT IS THE PURPOSE OF A DEBRIEFING?
PROVIDE OFFERORS IN A COMPETITIVE SOLICITATION AN ASSESSMENT OF THEIR PROPOSAL IN
RELATION TO THE EVALUATION CRITERIA, A GENERAL UNDERSTANDING OF THE BASIS OF THE
AWARD DECISION, AND THE RATIONALE FOR THEIR EXCLUSION FROM THE COMPETITION
A CONTRACTING OFFICER'S REPRESENTATIVE (COR) ASSISTS IN THE _____________________ OR
_______________ OF A CONTRACT.
TECHNICAL MONITORING; ADMINISTRATION
2. EXPLORE THE PURPOSE OF A POST AWARD ORIENTATION. A POST AWARD ORIENTATION AIDS
BOTH GOVERNMENT AND CONTRACTOR PERSONNEL TO:
1) ACHIEVE A CLEAR AND MUTUAL UNDERSTANDING OF ALL CONTRACT REQUIREMENTS
(2) IDENTIFY AND RESOLVE POTENTIAL PROBLEMS
3. WHAT ARE THE TWO TYPES OF CONTRACT MODIFICATIONS?
(1) BILATERAL
(2) UNILATERAL
WHICH TYPE OF MODIFICATION REQUIRES THE SIGNATURE OF BOTH THE CONTRACTING OFFICER
AND THE CONTRACTOR?
BILATERAL
WHAT DOES IT MEAN FOR A CONTRACT TO BE PHYSICALLY COMPLETE?
DELIVERIES ARE MADE AND GOVERNMENT INSPECTED AND ACCEPTED THE SUPPLIES. SERVICES ARE
PERFORMED AND GOVERNMENT ACCEPTED.
WHAT ARE THE CLOSEOUT TIME STANDARDS?
SIMPLIFIED ACQUISITION PROCEDURES (SAP):
CLOSED WHEN EVIDENCE OF RECEIPT OF SUPPLIES/SERVICES AND FINAL PAYMENT IS RECEIVED
WHAT ARE THE CLOSEOUT TIME STANDARDS?
CONTRACTS REQUIRING SETTLEMENT OF INDIRECT COST RATES
36 MONTHS AFTER
PHYSICAL COMPLETION
WHAT ARE THE CLOSEOUT TIME STANDARDS?
FIRM-FIXED-PRICE:
6 MONTHS AFTER PHYSICAL COMPLETION MONTHS AFTER PHYSICAL COMPLETION
WHAT ARE THE CLOSEOUT TIME STANDARDS?
ALL OTHERS:
20 MONTHS AFTER PHYSICAL COMPLETION