Construction Project Management Exam Questions and Answers, Exams of Construction management

A list of questions and answers related to Construction Project Management. It covers topics such as project objectives, project success, owner representatives, design professionals, project delivery systems, planning a project, work breakdown schedule, and project progress. The document also provides information on the Construction Management Association of America and the four industry sectors in construction. It is a useful resource for students studying Construction Project Management.

Typology: Exams

2022/2023

Available from 11/25/2023

healthpro
healthpro 🇺🇸

3.3

(3)

1.4K documents

1 / 43

Toggle sidebar

Related documents


Partial preview of the text

Download Construction Project Management Exam Questions and Answers and more Exams Construction management in PDF only on Docsity!

Construction Project

Management (COSC

353) Exam Latest

updated question and

answer 2023

 What are the objectives of a Schedule? (5) - Correct answer Determine project completion time  Determine Critical Activities - CP  Identify which activities can be delayed  Used as a tool to manage a project Construction Project Management (COSC

 What is a TEMPORARY endeavor undertaken to create a unique product, service, or result? - Correct answer Project  When is the end of a project reached? - Correct answer When the project objectives have been achieved, or the project is terminated.  Project success is one that meets or exceeds the expectations of your _________? - Correct answer Stakeholders Construction Project Management (COSC

 What requires the application of knowledge, skills, tools, and techniques to project activities to meet project requirements? - Correct answer Project Management  What sets the standard for ethics and professionalism in the construction industry? - Correct answer AIC Code of Ethics  What does AIC stand for? - Correct answer American Institute of Constructors Construction Project Management (COSC

 What is the second-largest employer in the United States? - Correct answer The Construction Industry  How many construction companies existed in the U.S. by 2009? - Correct answer 880,  How many people were employed by the construction industry in 2009? - Correct answer 7.3 Million  The idea is defined by the ______, developed by the _______, and produced by the ________, who then turns it over to the _________. - Correct Construction Project Management (COSC

answer Owner; Designer; Constructor; Owner  Homeowners and Developers are considered ________ owners? - Correct answer Private  What are some examples of Owner Representatives? - Correct answer Facility Managers, Outside Consultants, Building Committee, etc.  What are the three categories of Owners? - Correct answer Private, Public, and Owner Representatives Construction Project Management (COSC

 What are the two main categories of Design Professionals? - Correct answer Architects and Engineers  Which Design Professional identifies the important elements of the design? (Physical Context, Activities, Unique Image) - Correct answer Architect  Which Design Professional uses identifiable components and questions to be answered? - Correct answer Engineers  Who is a professional responsible for all construction activities, whether they Construction Project Management (COSC

work as a General Contractor, or a Construction Manager? - Correct answer Constructor  Who prepares a complete list of all job costs? - Correct answer Estimators  Who monitors job progress, coordinates subcontractors, analyzes changes and the impact of delays, and is a problem-solver? - Correct answer Scheduler  Who buys subcontracts once the job is won? They negotiate to get the best price while ensuring all contract Construction Project Management (COSC

requirements are met. - Correct answer Purchasing Agents  Who is typically hired by and works for the General Contractor? - Correct answer Subcontractors  Who do builders hire to do all trade work? - Correct answer Specialty Subcontractors  Why do Contractors bid out work to Subcontractors? - Correct answer To reduce financial risk Construction Project Management (COSC

 Why has the number of Trades increased recently? - Correct answer More complex building  T__________ form the core of the construction industry. - Correct answer Trades  Who supplies materials and building components to the project? - Correct answer Materials Suppliers  What does ANSI stand for? - Correct answer American National Standards Institute Construction Project Management (COSC

 Who supplies equipment for sale and rent to a project? - Correct answer Equipment Suppliers  What is a formal way of requesting information of various kinds from different suppliers?  It's normally a document containing a description on why the information is requested and a specification to what information is actually requested. - Correct answer RFI  What is a request to really get a proposal on how the supplier would like to design or choose a component or Construction Project Management (COSC

create a service for you? - Correct answer RFP  What entails the planning, scheduling, evaluation, and controlling of construction tasks or activities to accomplish specific objectives? - Correct answer Construction Management  What does CMAA stand for? - Correct answer Construction Management Association of America  What are the four industry sectors in construction? - Correct answer Construction Project Management (COSC

Residential, Commercial, Infrastructure & Heavy Highway; Industrial  Which industry sectors are/can be publicly funded? - Correct answer Commercial; Industrial & Heavy Highway  Which of the following categories of projects is often publicly funded and called infrastructure? - Correct answer Heavy Engineering  What describes when participants are organized to interact, transforming the owner's project goals and objectives Construction Project Management (COSC

into a finished reality? - Correct answer Project Delivery System  Who are the three major players in Project Delivery? - Correct answer Owner, Designer, Contractor  What are the three project delivery methods mentioned in class? - Correct answer DBB, CM, DB  Who wins a project in a Design-Bid- Build Bid? - Correct answer The lowest bidder Construction Project Management (COSC

 Which project delivery method is linear in nature? - Correct answer Design-Bid-Build  Is there a legal agreement between the Contractor and the Designer in Design-Bid-Build? - Correct answer No  What is the only thing the contractor is responsible for in a Design-Bid-Build method? - Correct answer Carrying out the work  Which method of project delivery gives the owner a high degree of Construction Project Management (COSC

control? - Correct answer Design-Bid- Build  Who defines the goals and objectives for a Design-Bid-Build method? - Correct answer Owner  What is an agency that is a fee-based service that offers advice, does not perform construction work, and is not financially responsible for work? - Correct answer Agency CM  What is the delivery of a project for GMP, where the Construction Manager acts as a consultant to the owner, Construction Project Management (COSC

performs the construction work, and is financially responsible for the work? - Correct answer At-Risk CM  Which method of project delivery comes from a single source? - Correct answer Design/Build Bid  Is a legal entity set up during a Design/Build Bid? - Correct answer No  What is the most prevalent form of Design/Build Bid? - Correct answer Contractor-Led Construction Project Management (COSC

 Which project delivery system requires no excuses and more trust? Both design professionals and construction professionals work for the same firm. - Correct answer Design/Build Bid  Public or Private? Which of the two has an open bid? - Correct answer Public  Public or Private? Which of the two has an closed bid and requires an invitation to bid? - Correct answer Private Construction Project Management (COSC

 What three bonds are required in public projects? - Correct answer Bid Bond, Performance Bond, Labor and Materials Payment Bond  What is an unethical practice in which a Contractor Discloses the Bid Price of One Subcontractor to Another in an Attempt to obtain a Lower Bid Price? - Correct answer Bid Shopping  What unethical practice is when the Subcontractor waits to the submit bid just before the due-time? (The Contractor is unable to check for discrepancies and errors that may lead to increased costs, disputes over scope, Construction Project Management (COSC

and general inefficient prosecution of work.) - Correct answer Pre-Award Bid Shopping  What unethical practice is when the Contractor seeks to obtain a lower price from a second subcontractor after having already been awarded the prime contract through the original subcontractor's bid? - Correct answer Post-Award Bid Shopping  What is it called when the Subcontractor offers to Undercut the Known Bid of Another Subcontractor? - Correct answer Bid Peddling Construction Project Management (COSC

 Who begins with a result and must synthesize the steps required to yield the results? (4) - Correct answer Planner  F_______, C_________, and G_______. You can only have two. (4) - Correct answer Fast; Cheap; Good  What are the steps of planning a project? (4) - Correct answer Review Historical Data  Review Contract  Choice of Technology  Definition of Work Tasks Construction Project Management (COSC

 Define Precedence Relationships Among Activities  Duration of Individual Tasks  Estimation of Required Resources  Communication  __________ + ____________ = Schedule (4) - Correct answer Work Breakdown Schedule (WBS) + Organizational Breakdown Schedule (OBS)  What does WBS stand for? (4) - Correct answer Work Breakdown Schedule Construction Project Management (COSC

 What does OBS stand for? (4) - Correct answer Organizational Breakdown Schedule  What is a tool used for expressing the scope of a project in simple graphical terms? (4) - Correct answer WBS  The WBS was developed by what two organizations? (4) - Correct answer US Defense Department (Late 50s) and NASA ( Early 60s)  What is an activity that is required to start or finish before the next activities Construction Project Management (COSC

proceed? (4) - Correct answer Predecessor  What is an activity that must start or finish after the previous activity can finish? (4) - Correct answer Successor  A __________ __________ _________ calculates the shortest path of planned activities to the end of the project. (4) - Correct answer Critical Path Method  What is it called when you perform more activities in parallel? (4) - Correct answer Fast Tracking Construction Project Management (COSC

 What is it called when you shorten the duration of critical path activities by adding resources? (4) - Correct answer Crashing the Critical Path  What does the project control begin with? What does it end with? (4) - Correct answer Identification of the Owner's Objectives; Those Objectives being met  What is defined as a "roadmap" to allow the project team to constantly monitor and make corrections as Construction Project Management (COSC

necessary? (4) - Correct answer Project Control  Standards are ________ and provide ________ to the project. (4) - Correct answer Measurable; Direction  Standards include three categories. State them. (4) - Correct answer Cost  Schedule  Quality  What measures actual project progress? (4) - Correct answer Actuals Construction Project Management (COSC