Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A list of questions and answers related to Construction Project Management (COSC 353) Exam. It covers topics such as project objectives, project success, project delivery systems, project planning, scheduling, and controlling, and project progress measurement. It also includes information about the different players involved in project delivery, the different types of owners and design professionals, and the different industry sectors in construction. useful information for students studying Construction Project Management.
Typology: Exams
1 / 43
๏ What are the objectives of a Schedule? (5) - Correct answer Determine project completion time ๏ Determine Critical Activities - CP ๏ Identify which activities can be delayed ๏ Used as a tool to manage a project ๏ What is a TEMPORARY endeavor undertaken to create a unique product, Construction Project Management (COSC
service, or result? - Correct answer Project ๏ When is the end of a project reached? - Correct answer When the project objectives have been achieved, or the project is terminated. ๏ Project success is one that meets or exceeds the expectations of your _________? - Correct answer Stakeholders ๏ What requires the application of knowledge, skills, tools, and techniques to project activities to meet project Construction Project Management (COSC
requirements? - Correct answer Project Management ๏ What sets the standard for ethics and professionalism in the construction industry? - Correct answer AIC Code of Ethics ๏ What does AIC stand for? - Correct answer American Institute of Constructors ๏ What is the second-largest employer in the United States? - Correct answer The Construction Industry Construction Project Management (COSC
๏ How many construction companies existed in the U.S. by 2009? - Correct answer 880, ๏ How many people were employed by the construction industry in 2009? - Correct answer 7.3 Million ๏ The idea is defined by the ______, developed by the _______, and produced by the ________, who then turns it over to the _________. - Correct answer Owner; Designer; Constructor; Owner Construction Project Management (COSC
๏ Homeowners and Developers are considered ________ owners? - Correct answer Private ๏ What are some examples of Owner Representatives? - Correct answer Facility Managers, Outside Consultants, Building Committee, etc. ๏ What are the three categories of Owners? - Correct answer Private, Public, and Owner Representatives ๏ What are the two main categories of Design Professionals? - Correct answer Architects and Engineers Construction Project Management (COSC
๏ Which Design Professional identifies the important elements of the design? (Physical Context, Activities, Unique Image) - Correct answer Architect ๏ Which Design Professional uses identifiable components and questions to be answered? - Correct answer Engineers ๏ Who is a professional responsible for all construction activities, whether they work as a General Contractor, or a Construction Manager? - Correct answer Constructor Construction Project Management (COSC
๏ Who prepares a complete list of all job costs? - Correct answer Estimators ๏ Who monitors job progress, coordinates subcontractors, analyzes changes and the impact of delays, and is a problem-solver? - Correct answer Scheduler ๏ Who buys subcontracts once the job is won? They negotiate to get the best price while ensuring all contract requirements are met. - Correct answer Purchasing Agents Construction Project Management (COSC
๏ Who is typically hired by and works for the General Contractor? - Correct answer Subcontractors ๏ Who do builders hire to do all trade work? - Correct answer Specialty Subcontractors ๏ Why do Contractors bid out work to Subcontractors? - Correct answer To reduce financial risk ๏ Why has the number of Trades increased recently? - Correct answer More complex building Construction Project Management (COSC
๏ T__________ form the core of the construction industry. - Correct answer Trades ๏ Who supplies materials and building components to the project? - Correct answer Materials Suppliers ๏ What does ANSI stand for? - Correct answer American National Standards Institute ๏ Who supplies equipment for sale and rent to a project? - Correct answer Equipment Suppliers Construction Project Management (COSC
๏ What is a formal way of requesting information of various kinds from different suppliers? ๏ It's normally a document containing a description on why the information is requested and a specification to what information is actually requested. - Correct answer RFI ๏ What is a request to really get a proposal on how the supplier would like to design or choose a component or create a service for you? - Correct answer RFP ๏ What entails the planning, scheduling, evaluation, and controlling Construction Project Management (COSC
of construction tasks or activities to accomplish specific objectives? - Correct answer Construction Management ๏ What does CMAA stand for? - Correct answer Construction Management Association of America ๏ What are the four industry sectors in construction? - Correct answer Residential, Commercial, Infrastructure & Heavy Highway; Industrial ๏ Which industry sectors are/can be publicly funded? - Correct answer Commercial; Industrial & Heavy Highway Construction Project Management (COSC
๏ Which of the following categories of projects is often publicly funded and called infrastructure? - Correct answer Heavy Engineering ๏ What describes when participants are organized to interact, transforming the owner's project goals and objectives into a finished reality? - Correct answer Project Delivery System ๏ Who are the three major players in Project Delivery? - Correct answer Owner, Designer, Contractor Construction Project Management (COSC
๏ What are the three project delivery methods mentioned in class? - Correct answer DBB, CM, DB ๏ Who wins a project in a Design-Bid- Build Bid? - Correct answer The lowest bidder ๏ Which project delivery method is linear in nature? - Correct answer Design-Bid-Build ๏ Is there a legal agreement between the Contractor and the Designer in Design-Bid-Build? - Correct answer No Construction Project Management (COSC
๏ What is the only thing the contractor is responsible for in a Design-Bid-Build method? - Correct answer Carrying out the work ๏ Which method of project delivery gives the owner a high degree of control? - Correct answer Design-Bid- Build ๏ Who defines the goals and objectives for a Design-Bid-Build method? - Correct answer Owner ๏ What is an agency that is a fee-based service that offers advice, does not Construction Project Management (COSC
perform construction work, and is not financially responsible for work? - Correct answer Agency CM ๏ What is the delivery of a project for GMP, where the Construction Manager acts as a consultant to the owner, performs the construction work, and is financially responsible for the work? - Correct answer At-Risk CM ๏ Which method of project delivery comes from a single source? - Correct answer Design/Build Bid Construction Project Management (COSC
๏ Is a legal entity set up during a Design/Build Bid? - Correct answer No ๏ What is the most prevalent form of Design/Build Bid? - Correct answer Contractor-Led ๏ Which project delivery system requires no excuses and more trust? Both design professionals and construction professionals work for the same firm. - Correct answer Design/Build Bid Construction Project Management (COSC
๏ Public or Private? Which of the two has an open bid? - Correct answer Public ๏ Public or Private? Which of the two has an closed bid and requires an invitation to bid? - Correct answer Private ๏ What three bonds are required in public projects? - Correct answer Bid Bond, Performance Bond, Labor and Materials Payment Bond ๏ What is an unethical practice in which a Contractor Discloses the Bid Construction Project Management (COSC
Price of One Subcontractor to Another in an Attempt to obtain a Lower Bid Price? - Correct answer Bid Shopping ๏ What unethical practice is when the Subcontractor waits to the submit bid just before the due-time? (The Contractor is unable to check for discrepancies and errors that may lead to increased costs, disputes over scope, and general inefficient prosecution of work.) - Correct answer Pre-Award Bid Shopping ๏ What unethical practice is when the Contractor seeks to obtain a lower price from a second subcontractor after Construction Project Management (COSC
having already been awarded the prime contract through the original subcontractor's bid? - Correct answer Post-Award Bid Shopping ๏ What is it called when the Subcontractor offers to Undercut the Known Bid of Another Subcontractor? - Correct answer Bid Peddling ๏ Who begins with a result and must synthesize the steps required to yield the results? (4) - Correct answer Planner Construction Project Management (COSC
๏ F_______, C_________, and G_______. You can only have two. (4) - Correct answer Fast; Cheap; Good ๏ What are the steps of planning a project? (4) - Correct answer Review Historical Data ๏ Review Contract ๏ Choice of Technology ๏ Definition of Work Tasks ๏ Define Precedence Relationships Among Activities ๏ Duration of Individual Tasks ๏ Estimation of Required Resources ๏ Communication Construction Project Management (COSC
Schedule (4) - Correct answer Work Breakdown Schedule (WBS) + Organizational Breakdown Schedule (OBS) ๏ What does WBS stand for? (4) - Correct answer Work Breakdown Schedule ๏ What does OBS stand for? (4) - Correct answer Organizational Breakdown Schedule ๏ What is a tool used for expressing the scope of a project in simple Construction Project Management (COSC
graphical terms? (4) - Correct answer WBS ๏ The WBS was developed by what two organizations? (4) - Correct answer US Defense Department (Late 50s) and NASA ( Early 60s) ๏ What is an activity that is required to start or finish before the next activities proceed? (4) - Correct answer Predecessor ๏ What is an activity that must start or finish after the previous activity can finish? (4) - Correct answer Successor Construction Project Management (COSC
_________ calculates the shortest path of planned activities to the end of the project. (4) - Correct answer Critical Path Method ๏ What is it called when you perform more activities in parallel? (4) - Correct answer Fast Tracking ๏ What is it called when you shorten the duration of critical path activities by adding resources? (4) - Correct answer Crashing the Critical Path Construction Project Management (COSC
๏ What does the project control begin with? What does it end with? (4) - Correct answer Identification of the Owner's Objectives; Those Objectives being met ๏ What is defined as a "roadmap" to allow the project team to constantly monitor and make corrections as necessary? (4) - Correct answer Project Control ๏ Standards are ________ and provide ________ to the project. (4) - Correct answer Measurable; Direction Construction Project Management (COSC
๏ Standards include three categories. State them. (4) - Correct answer Cost ๏ Schedule ๏ Quality ๏ What measures actual project progress? (4) - Correct answer Actuals ๏ What is a series of tasks or activities arranged in a logical order, depicting a start time, activity duration, and indicates a completion time? (5) - Correct answer Schedule ๏ Abandoning a project schedule results in an increased likelihood of Construction Project Management (COSC