Contaminated Ground Water and Construction Site Management, Exams of Water and Wastewater Engineering

Managing contaminated ground water and storm water runoff during construction. Covers legal requirements, storm water pollution prevention plan (SWPPP), pollutant source management, BMP modification, construction scheduling, soil stabilization, sediment control, storm water inlet management, erosion and sedimentation control, sediment basin/trap installation and removal, BMP inspection and maintenance, chemical and fuel management, housekeeping, stockpile and maintenance area inspection, trash and recycling management, and check dam and storm drain inlet protection.

Typology: Exams

2024/2025

Available from 10/26/2024

Achieverr
Achieverr ๐Ÿ‡บ๐Ÿ‡ธ

4.8

(4)

3.8K documents

1 / 12

Toggle sidebar

Related documents


Partial preview of the text

Download Contaminated Ground Water and Construction Site Management and more Exams Water and Wastewater Engineering in PDF only on Docsity!

SWPPP study guide questions with

correct answers

Law set into place in 1970 for storm water regulation - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Clean Water Act Regulations for monitoring storm water activity on a construction site, are outlined in - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”NPDES When should you read and understand SWPP - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Immediately after project is awarded and before you begin any site work What is not an allowable storm water discharge or non-storm water discharge

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Contaminated ground water When may construction activity begin - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”When jurisdiction of operations specifies you can start Waters that fail anti-degradation list are placed on which list. - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”303D list SWPPPs certification are signed by who - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”An officer and project owner The document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT. (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”FALSE NOT can be filed when - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”All construction has been completed both inside and outside

Operations on a construction site are the entity in charge of plans and specification and the entity who? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”is in charge of daily activities Motives for staying in compliance with storm water objectives? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Stay out of trouble with the law Objectives of the clean water act are - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical and biological integrity NPDES stands for - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”National Pollutant Discharge Elimination System Which are a component of a good SWPPP - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Site description and maps, inspection and maintenance procedure. Potential pollutant sources, schedules of activities, site contact information, plan certification documents, site contact info and descriptions of controls BMP Construction sediment is not considered a potential pollutant source (T/F)

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False When modifying or substituting a storm water BMP the contractor must consult with - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Project owner, SWPPP designer NOI must be submitted to the appropriate agency before the storm water pollution preventive plan is developed (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False Name of the list with impaired waters is called totally daily maximum load (T/F)
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False, 303d List You should have a SWPPP for your construction site because? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”It is required by law, it documents storm water management activity on your site, and it demonstrates your intent to manage storm water on your site A well constructed SWPPP for your site should be? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Site specific

The NOI must be submitted when? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Prior to commencing construction One necessary component of a good SWPPP is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Schedule of activities Factors that may impact SWPPP scheduling activities include - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Weather and Climate Pollutant sources on a construction may include - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc If you believe BMP modification are necessary to the site you must? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Seek written approval of the project SWPPP designer or project owner The following consideration may be incorporated into the SWPPP? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Endangered species and historical preservation The SWPPP will contain the following? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Site maps, erosion sediment control, BMPs, site specific sequences of construction activities Once the site has experienced rain event of measurable quantity you must?

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Identify deficient and failed BMPs and make repairs immediately The subcontractor certification includes all of the following but the following?
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Subcontractors web site SWPPP site map includes the following - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Storm Water BMPs and their locations

With the state general permit your primary responsibility is to make sure the permit is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Present and current Document that contains your permit number is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Permit authorization letter Portion of the SWPPP that specifies the content of the SWPPP is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”The table of content Document in the SWPPP that certifies the GC commitment to compliance or to SWPPP is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”SWPPP certification letter The certification document that identifies the name and contact information of subcontractors on the site is the? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Sub contractor's certification form. Document that reveals the total area of disturbance is the? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”The site map The document that is completed by the SWPPP inspector recording site condition during the inspection is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”The inspection report form The document that must be completed when a hazardous spill is on the site is the -? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Spill report form The document that verifies that the weekly meetings have been conducted is the?

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Weekly meeting form The document delegating inspection to another is the? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”The delegation letter The document that must be completed when final stabilization is completed is the?
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”NOT (notice of termination)

Scheduling and Sequencing - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Are considered and actual BMP category by the USEPA Which of these activities are not necessary parts of the construction phase?

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Project bidding If a contractor determines it is necessary to modify the SWPPP sequence of construction activities the contractor must? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) carefully assess the situation 2.) request assistance and approval by the projects SWPPP designer 3.) Receive written approval from the project SWPPP designer 4.) Make necessary changes in the field and update site maps It's enough to prepare the top soil plant seed or sod and walk away? (T/F)
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False (you must also protect vegetation as it is established) Scheduling - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Aids in protecting the site by timing construction activities Stabilize inactive areas after 21 days? (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False (14 days) When installing perimeter BMP controls? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Note locations and dates of insulation on the site map Storm water issues usually discussed during the pre-construction meeting include
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”SWPPP BMPs and the construction schedule Sediment control devices must be installed - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Down slope of construction areas and functioning as desired prior to beginning land disturbance activities If you have a storm water inlet in a construction roadway - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Consult project SWPPP to insure you are protecting inlets appropriately

Soil stock piles and other disturbed areas must receive - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Temporary stabilization if they will remain inactive more than 14 days and potentially fewer days depending on jurisdiction When in the process of transition from land development to building construction it is important to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Implement specific BMPs to address the potential pollutants associated with construction materials The SWPPP sequence of activities can be modified after - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Consulting with the project SWPPP designer and/or the project owner and receiving written approval Once the notice of termination is filed all storm water related project information must be retained for - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”3 years or more depending on permit or contract obligation Definition that describes sedimentation is - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”When, where, and how eroded sediment is deposited Erosion controls are BMPs that trap soil patricians after they have been detached and are being transported by wind and water (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False ( it is sediment controls, NOT erosion controls that trap particles after they have been detached) The following are common types of erosion caused by water - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Gully, rill, rain drops, splash, and channel Of the following factors the one the contractor has the most control over is

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Ground cover Which erosion control BMP increases water and filtration dissipates rain fall energy and slows over land flow of storm water - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Vegetation Which of the following factors effect erosion. - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Amount of duration of rain fall, ground cover soil type

Erosion and sedimentation control principles do not include which of the following

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”leave unprotected openings for storm water drains open Inactive areas on a construction site must be temporarily stabilized within 21 days (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False (14 days) The following control is a source control that treats soil as a non-renewable source that has value and should be kept in place - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”erosion controls treat soil as a non-renewable resource that has value and should be kept in place All design sites best specific erosion and sediment controls require no inspections or maintenance (T/F) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”False The system of erosion and sediment controls BMP's often called - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”A treatment train Accelerated erosion is caused by? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Manmade activities Factors of erosion, the one that a contractor has most control over is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Ground cover Of the following the one that is a primary erosion and sediment control objective
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Minimize the extent of exposure... SWPPP BMPs can be modified after? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”consulting with project SWPPP designer or project owner and receiving written approval Protecting vegetation should be implemented when - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Before construction activities begin

The benefits of soil or surface ruffling are? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”It impedes the sheet from erosion as water flows down a slope and it provides an area for seed germination and growth When establishing vegetation in ground cover the following steps should be followed.

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) Properly prepare the seed bed 2.) Insure good seed to soil contact 3.) Install specified short term protection such as erosion control blanket 4.) Provide ongoing maintenance until ground cover is appropriately established One thing not to be considered when installing a roll of erosion controlled product (ACP) - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Water soil until completely saturated is not a consideration before installing a rolled erosion control product Common materials and techniques used to temporary stabilize construction site soils include all but one of the following - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”diesel fuel emulsified in water Pertaining to the permanent stabilization is appropriate to - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) Properly prepare site soils to meet top soil quality and quantity specification 2.) develop a permanent stabilization plan early in a construction schedule 3.) mow and maintain vegetation and landscape areas per contract requirements Silt fence may be used in all but one of the following locations - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”May not be used across stormwater convinces such as as ditch or swell Silt fence and fiber roll capture and retain sediment primarily through
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Ponding and settling When inspecting a sediment trap look for - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) proper installation and stabilization 2.) sediment accumulation 3.) sediment discharge When installing a sediment basin or trap the following steps should be followed
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) Consult a SWPPP's sequence and construction documents 2.) Install and stabilize prior to conducting up slope-ground disturbances activities 3.) inspect per SWPPP schedule 4.) Repair and maintain

The one that is not a concern when inspecting a construction exit? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Location of the spill kit Temporary stabilization should be implemented? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”On all disturbances that will remain inactive for more than 14 days or more A key first step before installing a rolled controlled product is to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Properly preparing the ground surface Which of the following ground covers are best applied on moderate to steep slopes in storm water conveniences? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”A rolled erosion product (ARP) What percentage of vegetation is typically required for establishing final stabilization

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”70% When inspecting a silt fence look for all but one of the following deficiencies
  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Trac out A fiber roll or a waddle is intended to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Capture sediment from sheet flow to control run off velocity Sediment tarps are generally designed to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Capture and retain sediment for small water sheds Which of the following is not a consideration when removing temporary sediment basins? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Keep the overflow spill way intact The primary purpose of a construction exit is? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”to remove sediment from construction site vehicles and prevent trackout

BMPs identified by the SWPPP inspectors as needing repairs must be corrected and documented - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”In a timely manner and in compliance with the SWPPP documents Run off controls do what? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Transfer storm water around or across the construction site Check dams are intended to - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”1.) Reduce the velocity of storm water flowing through a storm channel 2.) minimize channel erosion and score 3.) retain small amounts of sediment Which is not true concerning diversion swales and berms? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”It is not necessary to stabilize a swale or diversion berm before water starts flowing When inspecting inlet protection look for all but one of the following - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Appropriate vegetative stabilization (look for structural damage including torn fabric and broken supports, accumulated sediment debris and restricted bypass) In regards to velocity protection which of the following are true? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”All of the above; minimize scour and erosion from concentrated flow When installing a storm water retention or detention pond which of the following statement may be incorrect - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”May not be appropriate to completely compact soil in the bottom of the pond Which BMP is often overlooked on a construction site - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Good housekeeping and material management Concrete washout containers can be used to manage - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Manage concrete washout from concrete trucks and equipment Paint washout stations are intended to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Provide an opportunity to recycle or properly dispose of paint waste, minimize potential waste hazards from populating the environment

You can effectively control dust by? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Covering stock piles with tarps and plastics, routinely watering disturbed areas and keeping areas stable unit needed to be worked When working with chemicals and fuels consider and inspect - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Disposal, containment, use safety storage and delivery Which of the following is not a valued BMP housekeeping practice - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Cover up spills leaks and stains unless someone is watching You should inspect stockpiles for - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Signs of erosion, appropriate stabilization cover, non-conforming materials or loose, dry unprotected materials During a routine SWPPP inspection check portable toilets for? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”leaks, fluids, and stains on pavement and soil, damage of vandalism, anchor toilets, maintenance report form and make sure toilets are clean and empty. When conducting inspection, inspect maintenance areas for - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Proper material storage and disposal, leaks staining and other restricted releases, spill kits and related containment materials and consistent and appropriate use As you are inspecting the perimeter of your site what potential areas may require attention? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Street cleaning operation, disposal of collected sediments, construction exit which indicates pending trackout Not a primary function of trash and recycling management - .......ANSWERS ๐Ÿ”ท๐Ÿ–Š โœ”โœ”Provide single dumpster for ALL waste What should you consider before dewatering? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Consider the soil type, is a permit needed?, your discharge area, your pump rate, and saturated sediment management

If you have any questions or concerns about the BMP's specified in your project SWPPP - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Contact your project SWPPP designer When installing and maintaining a check dam, make sure - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”The low point overflow of the check dam is in the middle of the channel Storm drain inlet protection is intended to? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Pond water and allow sediment to settle out To reduce the possibilities of undercutting you should? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Install filter fabric under BMP's and storm water convinces Sediment basins are often converted into? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Detention and retention ponds Concrete washout water has high levels of? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”pH Proper spill management should include all of the following except? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Installation of a spill pit on your construction site The best location for a portable toilet is in? - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”On level ground and in low-traffic areas A common potential pollutant in - .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Petroleum Which material management practice may address both sediment and dust control?

  • .......ANSWERS ๐Ÿ”ท๐Ÿ–Šโœ”โœ”Street cleaning