Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

CQM-C EXAM-with 100% verified solutions 2024-2025, Exams of Advanced Education

CQM-C EXAM-with 100% verified solutions 2024-2025

Typology: Exams

2023/2024

Available from 07/18/2024

studycamp
studycamp 🇺🇸

3.8

(21)

2.5K documents

1 / 6

Toggle sidebar

Related documents


Partial preview of the text

Download CQM-C EXAM-with 100% verified solutions 2024-2025 and more Exams Advanced Education in PDF only on Docsity! CQM-C EXAM-with 100% verified solutions 2024-2025 The purpose of Construction Quality Management is to: Achieve the quality established by properly developed requirements through the combined responsibility, but seperate efforts of contractpr smd government personnel. Construction Quality Management is the performance of tasks, which ensure that construction is performed. According to plans and specifications, on time, within a defined budget and a safe work environment. Partnering relationships are based upon: Building trust and dedication to common goals It is the responsibility of Quality Assurance Personnel to: Periodically verify that the contractors system of control is working effectively. An effective contractor quality control program will: Be an incentive for work to be done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater profits. The success or failure of all contractors is based upon: The ability to control costs, finance work, estimate jobs, schedule the work, and maintain effective quality control. Quality Assurance Personnel have the responsibility to: Require contractors to maintain the quality specified in the plans and specifications. Inspection is: The process by which ongoing and completed work is examined During the punch-out inspection of a project: Quality Assurance Personnel must assure that the contractor prepares a punch-list and makes corrections. If there is a disagreement whether the contractors work complies with the contract: The government makes the final determination Characteristics that describe a definable feature of work include: Cross-referenced listings to the contractors construction schedule that may have more than one definable feature under a section of the specifications. The _____________________ consists of daily checks of the work to assure continuing compliance with contract requirements. Follow-up phase The Quality Assurance Plan: Is a government management tool establishing staffing, training, pre- award activities, and surveillance activities. Testing is extremely important in construction quality management and is performed by: Both the contractor and the government If the contractor does not provide an adequate superintendent, the contract allows the contracting officer to: Require the contractor to assume personal supervision of the work. The contractor is required to conduct a preparatory phase meeting before he begins any definable feature of work except when: There are no exceptions to the rule. The ____________________ is the appropriate time to assure that all materials and/or equipment have been tested, submitted, and approved. Preparatory phase The ____________________ is workmanship oriented, and where workmanship standards are established. Initial phase The contract requires the contractor to submit quality control reports: Daily. The Quality Control report should address: Both work completed and control activities The Quality Assurance Report is the governments record of project-related events and is prepared _______________. For each visit day Grounds for withholding payment include the contractors failure to: Perform in accordance with the terms of the contract, provide a Quality Control Plan giving assurance of intent and ability to comply with quality standards, and build to the quality standards established by the contract. Actual construction on the job site begins: After an interim or final QC Plan is accepted. Contractor testing procedures: Are outlined in the Quality Control Plan as defined by Section 01450N/01451A and addressed at the Coordination and Mutual Understanding Meeting (Navy). Requests for information are submitted to: Ask for clarification of the contract Design-Build contracts require: The QC Manager to be in place and take an active role in the review and coordination of the design.