Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A study guide for the home improvement contractor (HIC) Virginia exam, covering topics related to construction, materials, and building practices. The guide provides detailed information and technical content to help individuals prepare for the exam, including proper techniques, installation methods, and construction-related subjects.
Typology: Exams
1 / 2
Nailing into hard wood, whats best to use? - CORRECT ANSWER-Cut na To avoid hardening due to hydration ....use masonry mo before? - CORRECT ANSWER-2 1/2 Hours Heat flows in what direction? - CORRECT ANSWER-Hot to Cold First and most important step in using or preparing a material? - CORRECT ANSWER- Thoroughly read and understand the manufactures directions. whats true abou the gypsum broads over wood framing? - CORRECT ANSWER-Apply First to ceiling , then to wall What is used to remove air pockets from place concrete? - CORRECT ANSWER- Vibration wide square-edged boards are to be used for broad and batt siding. how should the batten strips be nailed? - CORRECT ANSWER-to the furring strips between the boards . what can be installed on a vertical wall to accept viny soppit panels? - CORRECT ANSWER-F-Channel a vapor retarder on blanket insulation - CORRECT ANSWER-Face the warm side of wall when installing shoe molding on a base board over hand wood floor , the shoe mold should be? - CORRECT ANSWER-nailed only to the base board to facilitate handling + workability ... must speak jobsite addition of water to the concrete mixture - CORRECT ANSWER-maintain the slump, without exceeding the allow water - cement ratio. Actual standard size of a concrete block? - CORRECT ANSWER-7 5/8 x 7 5/8 x 15 5/ Maximum threshold height of egress door , of group occupancy building? - CORRECT ANSWER-1/2 inch First leveling procedure after pouring concrete? - CORRECT ANSWER-screeding
timing for floating+ trouling is critical inproduce - CORRECT ANSWER-a smooth durable surface when applying a run of wall cabinets , the cabinets should be? - CORRECT ANSWER- fitted with a hanger rail