Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

LARE Section 1 Study Questions with 100% Correct Answers | Verified | Latest Update, Exams of Advanced Education

LARE Section 1 Study Questions with 100% Correct Answers | Verified | Latest Update

Typology: Exams

2024/2025

Available from 11/21/2024

professoraxel
professoraxel 🇺🇸

3.5

(34)

11K documents

Partial preview of the text

Download LARE Section 1 Study Questions with 100% Correct Answers | Verified | Latest Update and more Exams Advanced Education in PDF only on Docsity!

LARE Section 1 Study Questions with

100% Correct Answers | Verified | Latest

Update

AddendumivsiBulletinivsiChangeiOrderi-iCorrectiAnswer- Addendaiareiissuediafteriaiprojectigoesitoibid,ibutibeforeibidsiareievalua ted.i Bulletinsiandichangeiordersiareiissuediduringiconstruction.i Aibulletiniisiairequestiforiaichangeifromitheidesign/constructioniside.i Aichangeiorderiisiaichangeitoitheicontractianditypicallyiinvolvesiaichange iiniscopeiorichangeiinifeesidueitoiinaccurateioriincompleteiplans,idetailsi orispecs. Whatitypesiofisituationsimightipromptiaichangeiorder?i- iCorrectiAnswer- Usuallyianythingithatiresultsiiniaichangeiiniscopeiorifees;idrawingsierror siand/oriomissions,idesignichanges,iinaccurateispecs,iunforeseenisoilico nditions,iinaccurateiestimateiofimaterialsineeded,ietc.i*Noteithatiaicha ngeiordericanialsoiresultiinireducedifeesiforicontractoriifisubstitutedimat erialsicostilessithanipreviouslyispecifiedimaterials.

Whaticouldihappeniifiailandscapeiarchitectitakesicallsifromiaibiddingicon tractoriduringitheibiddingiprocess?i-iCorrectiAnswer- Theibidsicouldibecomeiinvalidatedianditheilandscapeiarchitecticouldibec omeiliableiforitheicostiofibidding.iDuringibiddingialliquestionsihaveitoibei submittediiniwritingitoiensureiallibiddersihaveiaccessitoitheisameiinform ation. Whoisubmitsishopidrawings?i-iCorrectiAnswer- Theicontractorioriproductimanufacturer. Whatiareishopidrawings?iShopidrawingsivsispecifications?i- iCorrectiAnswer- AnyisubmittalitoitheiPMiforireviewiincludingidetailsidesignicalculations,i designidrawings,ifabricationiandiinstallationidrawings,ierectionidrawing s,ilists,igraphs,ioperatingiinstructions,icatalogisheets,idataisheets,isampl esiandisimilariitems Shopidrawingsiareinoticontractidocuments Whileicontractiplansiandispecificationsi(includingiSupplementaliandiSpe cialiProvisions)idefineitheioverallinatureiofitheiprojectiwithimanyispecifi cirequirements,iShopiDrawingsiprovideiaimethodiforitheiContractoritoip ropose,iunderitheispecificationiguides,iaiparticularimaterial,iproductioris ystemiofiaccomplishingitheiwork. Whatiisiincludediiniawardingitheicontract?i-iCorrectiAnswer- 1.iAdvertising

2.iReceiptiandibidiopening 3.iBidievaluation 4.iContracticomplianceireview 5.iBoardiapprovalitoiawardiprojects 6.iProcessingibondsiandiinsurance 7.iPreiConimeeting 8.iIssuingitheiNoticeitoiProceed Atiwhatistageiareishopidrawingsisubmittediandiareitheyiincludediinianyi dwgisetioripackage?i-iCorrectiAnswer- Submittals.iTheicontractoriusuallyijustisubmitsishopidrawingsitoitheilan dscapeiarchitect.iInisomeicasesiwheniaipermitiisirequired,ishopidrawing simayibeisubmitteditoitheiCity. WhatiisianiRFI?i-iCorrectiAnswer- Anyiformaliquestioniaboutitheiplans,ispecsioricontractirequirementsitha ticomeitoitheiPMifromitheicontractor,iexceptiforirequestsiforiCOiorishopi drawingisubmittals.iREVIEWRFIicategoryi 6 iisichangeiorderirequest. ..soiisiaichangeiorderirequestiaitypeiofiRFI? WhoiinitiatesianiRFI?i-iCorrectiAnswer- Almostialwaysiinitiatedibyitheicontractor,iprocessedibyitheiPM

Whatichangesiiniunitipriceicontractualirelationshipsicouldiwarranticontr actichanges?i-iCorrectiAnswer-- Changesiiniqualityirequiringiainewiunitipriceibeinegotiated

  • Changesiiniquantity;iofteniifichangeiiniquantityiisigreaterithani 10 - 20%i(exacti%itoibeistatediinicontract),inewiunitipricesicanibeinegotiated

Changesiinicontractitime;imayiresultiinichangesitoioverheadicostsiificont ractitimeichanges

  • Changesiinicontracticonditions Whatiareitheimainichangeiorderipricingistructures?i-iCorrectiAnswer-- negotiatedilumpisumi

timeiandimaterial.iPaymentiwillibeibasedionidocumentedidirecticostian diapprovedioverheadiandiprofitiafteritheicompletioniofiwork

unilateral.iThisiisiissuediwheniagreementionicostsiand/oritimeiadjustme ntsicannotibeireached Excusable,icompensableidelayiimpactsi-iCorrectiAnswer- =ithoseiwithinicontroliofiowner 1.ierrorsiandiomissions 2.idelayionishopidrawings 3.iownerifurnishediequipment

Excusable,inon-compensableidelayiimpactsi-iCorrectiAnswer- =ioutsideiofieitheriparty'sicontrol 1.iweather 2.istrikesi 3.iactsiofiGod Inexcusableidelayiimpactsi-iCorrectiAnswer- =iwithinitheicontroliofitheicontractor 1.ifailureitoiproperlyimanitheijob 2.ifailureitoiproperlyisuperviseitheiwork 3.ifailureitoiproperlyischeduleitheiwork 4.idelayiiniorderingitheimaterial 5.ifailureitoiproperlyimanageioriadministeritheiwork Whatiareiconstructiveichanges?i-iCorrectiAnswer- Owner'siactiwhichihasieffectiofirequiringitheicontractoritoidoisomethingi moreithaniminimallyirequiredibyicontract;iinvolvesiunintendediandiune xpectedichanges WhatiisiaiGanttichart?i-iCorrectiAnswer- Typeiofibarichartiwhichihighlightsiaiprojectischeduleishowingitheidurati oniofispecificitasks.

Whatiareitheielementsiofiaiconstructiveichange?i-iCorrectiAnswer-- workiexceedsicontractiminimumirequirements

  • noticeiofichange
  • changeiactuallyirequiredi(**defineirequirediinithisicontext)
  • extraitimeiand/oricostiincurred

contractorientitleditoiequitableiadjustmentiifielementsiofiproofiareimet Mechanic'siLienivsiStopiNoticei-iCorrectiAnswer- Mechanic'siLieniisiprivateiproject;istopinoticeiisipubliciproject Mechanic'siLieni-iCorrectiAnswer- Aistatutoryilienionitheirealipropertyiofianother,icreateditoiensureipaym entiforiworkiperformediandimaterialsifurnishediinitheirepairioriimprove mentiofirealiproperty,isuchiasiaibuilding. WhatidoesiPERTistandiforiandiwhatiisiit?i-iCorrectiAnswer- ProgramiEvaluationiReviewiTechnique;iAiPERTichartiisiaiprojectimgmtito oliuseditoischedule,iorganizeiandicoordinateitasks.iItiisiaitypeiofirelation ship/bubbleidiagram.iPMsiuseiaiPERTichartitoianalyzeitasksiandiminimu mitimeitoicompleteiaiproject. WhatidoitheiarrowsiandinodesirepresentiiniaiPERTichart?i- iCorrectiAnswer- Arrowsirepresentiactivitiesiandinodesirepresentimilestones

GanttichartivsiPERTicharti-iCorrectiAnswer- PERTichartsicanibeiusediprioritoiaiprojectibecauseidurationiisilistedibutin otidates.i AiPERTichartiallowsiyouitoibreakiaiprojectiintoismalleritasks,iestimateith eitimeinecessaryitoicompleteieachitask,iandikeepiyouriprojectionitrack.iT heyialsoidoiaibetterijobiofishowingiwhethericertainitasksineeditoibeicom pletediiniorderioriwhetheritheyicanibeicompletedisimultaneously.iUseiai PERTichartiifiyouineedito: Showitheiinter-dependencyioficertainitasks. Anticipateitheiamountiofitimeiit'llitakeitoicompleteiaiproject. Determineitheicriticalipathitoimeetiyourideadlines. Planiforilargeiorimoreicomplexiprojects.iGanttichartsilistispecificistartian diendidatesiandiareitypicallyiusediwhileiaiprojectiisiongoing.iGanttichart sihelpiyouiseeitheiprogressiyouriteamihasimade. Howimanyis.f.iareiinianiacre?i-iCorrectiAnswer-43,560isfiinianiacre MaxiADAirampislope?i-iCorrectiAnswer-1:12i(8.3%) MinirequiredicleariwidthiforianiADAiramp?i-iCorrectiAnswer-36" MaxiADAipathislopeibeforeiitiisiconsiderediairamp?i-iCorrectiAnswer- 1:20i(5%)

WhatiisitheimaxiheightiofianiADAirampibeforeiailandingishouldibeiadded ?i-iCorrectiAnswer- 30".iIfiaigreateririseiisirequired,itheirampiwillineeditoibeibrokeniupiintois everalirampsiwhichiareiseparatedibyi60"ilandings. Iniwhichicaseiwouldiyouihireiaiciviliengineeriasiaisub?i-iCorrectiAnswer- reviewiConstructionioficertainistructures,icertainitypesiofigradingisitu ations WhatiisiErrorsi&iOmissionsiInsuranceiandiwhoidoesiitiprotect?i- iCorrectiAnswer- Designiprofessionalsigetithisiinsuranceiasiaiprotectioniforidetailsileftiouti ofiplans.iAlsoiknowniasiProfessionaliLiabilityiInsurance. Nameiandidescribeitheithreeitypesiofispecifications.i(3iPs)i- iCorrectiAnswer-Performanceispecs- ispecifiesiminimumistandard;i(ex:iconcreteistrength) Prescriptiveispecs- ispecifiesitypesioriingredients,isuchiasiplantingiamendments;i Proprietaryispecs-iwrittenibyimanufactureritoiutilizeiaispecificiproduct *anotheritypeiisidescriptiveispecsi(lessicommonlyiused,iIibelieve)

WhatiisiCSIiandiwhatiareirelatedidivisions?i-iCorrectiAnswer- ConstructioniSpecificationiInstitute Mosticommonispecificationsiformat. DivisionsiasilistedibyiAngelaiWoodward:i 2.iSiteworki(includesilandscaping) 3.iConcrete 4.iMasonry Whatiareitheithreeielementsiofitheibiddingirequirements?i- iCorrectiAnswer- 1)InvitationitoiBidders,iwhichiincludesilicenseirequirementsiandiscopeio fiwork; 2)InstructionsitoiBidders,iwhichiincludesilocation,itimeiandidateiofitheib idsiasiwelliasibondingirequirements;iand 3)BidiForm,iwhichiincludesiailineiforibaseibid,ideductiveioriadditibeialter nateibid,iandisignatureiofibidder Whatiareitheitwoimosticommonibiddingimethodsiinilandscapeiarchitect ureicontracts?i-iCorrectiAnswer-Lumpisumiandiunitiprices

1)iLumpisumiisiaisingleipriceiforiallitheiconstructioniindicatediinitheiplans iandispecs.i 2)iUnitipricesiisiaibreakdowniofitheiworkinecessaryiforitheiconstructioni byiunitiprices. Nameithreeibondsitheicontractorimayibeirequireditoicarryitoiprotectithe iowner.i-iCorrectiAnswer-Bidibondi- iguaranteesithatitheicontractoriwilliagreeitoitheicontractiifihisiproposalii siaccepted.iIsitypicallyi5%-10%iofitheibidiamount.i Performanceibondi- iguaranteesithatitheiworkiwillibeiperformed.iIsitypicallyi50%- 100%iofitheibidiamount.i LaboriandiMaterialsibond- guaranteesithatitheicontractoriwillipayialliofihisibillsiforilaboriandimateri als.iIsitypicallyi50%-100%iofitheibidiamount. Whereiwoulditheifollowingiitemsitypicallyibeifoundiiniaiconstructionico ntract:i workiincludediinitheiplans,i contractor'siexaminationiofitheipremises,i interpretationiofitheicontractidocuments,i processiandicompletioniofitheicontract,i

permitsirequired,i contractor'siresponsibility,i siteiprotectioniandisafety,i paymentiitervalsiandibilling,i indemnityi(contractoriholdingiowneriharmless),i insurance,i beneficialiuseioficonstructionisite,i inspections,iguarantees?i-iCorrectiAnswer- Sectioni 1 iofiSpecificationsiGeneraliProvisionsi(alsoilabelediasiGeneraliRe quirementsioriGeneraliConditions) Whatiisiaibidibreakdowniandiwhatiisiitialsoiknownias?i-iCorrectiAnswer- Aicostiitemizationiofitheivariousiconstructioniphasesiofitheiproject;iakai ScheduleiofiValues Theiprimaryipurposeiofipreparingiaischeduleiofivaluesiisitoipermititheio wnerioriarchitectitoidetermineiwhatipercentageioficompletionihasibeeni achievediforiparticulariitemsiofiworkiiniorderitoiagreeioniprogressipaym ents. Whatiareisomeiresponsibilitiesiofiaiconstructionimanager?i- iCorrectiAnswer-Responsibilitiesiinclude:i

  • administeritheiconstructionicontract
  • coordinateiwithiothericityiagencies
  • maintainiprojectirecords
  • evaluateidisputesiandiclaims
  • orderichangesiinitheiwork
  • negotiateicontractimodifications
  • prepareistatusireports
  • reviewimonthlyipaymentirequests
  • monitoricostsiandischedule
  • interpretitheitechnicalicontentiofidrawingsiandispecs
  • responditoiquestionsifromicontractoriiniaipromptimanner
  • doinotiimpedeitheicontractoriwithoutigoodicause
  • witnessistartupitests Whereiareideductiveiandiadditiveialternativesifound?i-iCorrectiAnswer- IncludediinitheiBidiForm WhatiisitheiMechanicsiLieniLaw?i-iCorrectiAnswer- Statesithatianyicontractor,isubcontractor,ilaborer,isupplierioriotheripers oniwhoihelpsitoiimproveiyouripropertry,ibutiisinotipaidiforihisiwork/sup plies,ihasiairightitoienforceiaiclaimiagainstiyouriproperty. Whatiareipossibleioutcomesiifitheiownerihasipaiditheicontractoriinifullib utitheicontractorihasinotipaiditheisubs?i-iCorrectiAnswer- Theiowner'sipropertyicouldibeisolditoisatisfyitheiindebtednessiperitheiM echanicsiLieniLaw.

Preliminaryinoticei-iCorrectiAnswer- Subsiorimaterialisuppliersimustiprovideitheiowneriwithithisinoticeiiniord eritoifileiaiclaimiagainstitheipropertyiinitheieventiofifailureitoimakeipaym ent Whoiissuesibonds?i-iCorrectiAnswer-Suretyicompanies Duringiwhichiphaseiareishopidrawingsisubmitted?i-iCorrectiAnswer- Submittalsi(check) Areishopidrawingsiconsideredicontractidocuments?i-iCorrectiAnswer- No;iSectioni3.12.4iofiAIAiDocumentiA- 201 - 2007 istates:iShopiDrawings,iProductiData,iSamplesiandisimilarisubmitta lsiareinotiContractiDocuments.iTheiripurposeiisitoidemonstrateitheiwayii niwhichitheiContractoriproposesitoiconformitoitheiinformationigivenian ditheidesigniconceptiexpressediinitheiContractiDocumentsiforithoseiport ionsiofitheiWorkiforiwhichitheiContractiDocumentsirequireisubmittals. Whatiisiaitort?i-iCorrectiAnswer- Aiwrongicommittedibyianiindividualithaticausesidamageitoitheipropertyi ofianotheriindividual;imayibeisatisfiedibyitheipaymentiofimoney Trespassingi-iCorrectiAnswer- Physicalientryiuponitheilandiofianotheriwithoutipermissioniandicausingi damageitoitheiland;inotirestricteditoihumanientryiandimayiincludeiwate

rithatiisidivertedioriphysicaliobjectsithatiareidisposediofionipropertyi(ph ysicalientryiandidamageicausedibyientry) Nuisancei-iCorrectiAnswer- Disruptionithaticausesiphysicalidiscomfortitoitheilandowner;irequiresin oientryitoiland Negligencei-iCorrectiAnswer- Failureionitheipartiofioneipersonitoiexerciseisufficienticareioriprecautioni toiprotectitheihealthiandisafetyiofianotheriperson;imustiinvolveianiinjur yitoitheihealthiandisafetyiofianothericausedibyiaifailureitoiexerciseireaso nableicareiiniperformingianiactioriiniperformingianiactiwhichiisinotireaso nableitoiperform Whatiisiaitechnicalimemorandum?i-iCorrectiAnswer-Meetingiminutes Substantialicompletionivsifinalicompletioni-iCorrectiAnswer- Substantialicompletioniisitheistateiofiprogressiwhenitheiownericaniuseit heiprojectiforiitsiintendediuse.iSubstantialicompletioniwilliusuallyiinvolv eiaipunchilistiofiminoriitemsiforitheicontractoritoiperformibeforeiaiproje ctiisiconsidereditoihaveireachedifinalicompletion. Substantialicompletionitriggersitheicontractor'sientitlementitoipaymen timinusiretainageiwithheldiuntilifinalicompletion.iItimayialsoitriggeriwar ranteesianditheistartiofistatuteiofilimitationsiperiod.

Anyiexcavationiwhichiremovesilateralisupportifromiadjoiningilandiandit herebyicausesidamageiisiai________i-iCorrectiAnswer-Tort RiparianiRightsi-iCorrectiAnswer- Rightsiofiownershipiofilandiadjacentitoibothibanksiofinon- navigableistream Caniailandscapeiarchitectirelyionitheiadviceiofiotheriprofessionalsiasitoit heiintenti&imeaningiofiapplicableiregulations?i-iCorrectiAnswer-Yes Whatiareikeyisociologicaliinfluencesionisiteilandiuseiplanning?i- iCorrectiAnswer-Adaptability,iaccessibility,ihealth,istress,icontext FunctionaliDiagrami-iCorrectiAnswer- diagramiuseditoicommunicateitheibestiandimostiappropriateirelationsh ipsibetweenifunctioni&ispaces Whoiisiprotectedibyianiindemnificationiclause?i-iCorrectiAnswer- Owner.iSeeiindemnificationiclause. Whatiisianiaerialitopo?i-iCorrectiAnswer- Essentiallyiaerialiphotoiwithitopoilines.iShowsivegetation,idrainage,istr uctures,istreams,icirculationi(viaistreets,ietc)

WhatiareiIPMistrategies?i-iCorrectiAnswer- Integratedipestimanagement;iincludes:iCulturalicontroli(cropirotation,iu seiofilocallyiadaptedioripestiresistant/tolerantivarieties,isanitation,iman ipulatingiplanting/harvestidatesitoiavoidipests)iBiologicalicontroli(prote ct,ienhanceioriimportinaturalienemiesiofipests) Ifiaicontractorimakesiaichangeitoimaterials,iwhoseiresponsibilityiisiititoia cceptioridenyichange?i-iCorrectiAnswer-Landscapeiarchitect Whoineedsitoisigniaichangeiorder?i-iCorrectiAnswer- Contractoriandiowner Whatishouldiailandscapeiarchitectidoiifimaterialsidoinotimeetispecs?i- iCorrectiAnswer-Rejectitheimaterials Whichidocumentitypicallyiclosesioutipermits?i-iCorrectiAnswer- Certificateiofisubstantialicompletion PatentivsiLatentiDefecti-iCorrectiAnswer- Ailatentidefectiisiaifaultithatiwouldinotireadilyibeirevealedibyiaireasonab leiinspectioniwhereasipatentidefectsiareidefectsithatiareinotihiddeniandi shouldieasilyibeidiscoveredibyiaireasonableiinspection.i*reviewihowithe yiaffectidamagesirecoverable WheniisiitibestitoiuseiCostiPlusicontract?i-iCorrectiAnswer- Wheniyouiareiunsureiofihowilongiaiprojectiwillitake

RFQivsiRFPi-iCorrectiAnswer- http://www.differencebetween.net/business/difference-between- rfp-and-rfq/ AiRequestiforiQuotei(RFQ)iisicommonlyiusediwheniairequestoriknowsiw hatitheyiwantibutineediinformationionihowivendorsiwouldimeetitheireq uirementsiand/orihowimuchiitiwillicost.iRFQsistillidoinotiengageivendors ionispecificsiaroundicompletingiaiparticulariproject.iTheseiareilessicomm oniiniprojectiworkiandiRFQsiareimoreilikelyiwhenitheiprimaryitermsiofith eidealiareifinancialioriotherielementsiofiperformanceiareinotisignificant. AiRequestiforiProposali(RFP)iisitheimostiformaliandiintensiveiofitheithre eiforibothitheirequestorianditheivendor.iRFPsihaveistrictiprocurementiru lesiforicontent,itimelineiandivendoriresponsesiandiareiusediwhenitheire questihasiaispecificiprojectioriproblem.iTheirequestorispecifiesiaiscopeio fiworkithatineedsitoibeiperformedi(theiRFP)iandisolicitsiiniresponseiaiPro posalifromitheivendoridescribingihowitheyiwouldigoiaboutiexecutingith eiprojecti-iincludingipricingiinformation.


RFPitypicallyiforiservices,iRFQuoteitypicallyiforimaterialsiorismalliprojec tsi(justiincludesiquoteiandinoiscope) RFQualificationsirequestsiairesumeiofisortsilistingisimilariprojectsidone.

----------------------------------------------------

Isiiti(scopeiofiservices,iworkitoibeidone,iresume,isimilarijobsidone)?? Whatiphaseiisiresearchi&ianalysis?i-iCorrectiAnswer-Conceptual Extensiveivsiintensiveigreeniroofi-iCorrectiAnswer- Intensiveiallowsipeople Whatidoesiredisoilimean?i-iCorrectiAnswer- Rediironioxidesiareipresentianditheisoiliisilikelyiacidic Slopeiaspecti-iCorrectiAnswer- Theidirectionitheislopeifaces;iimpactsimicroclimate Regionaliscalei-iCorrectiAnswer- Generallyiconsidereditoibeianiareaithatirangesifromimoreithani 10 isquar eikilometersitoitheisizeiofiaicontinent. Whichiorderidoitheseigoiin:iworkiplan,iscope,iRFP,ibudget?i- iCorrectiAnswer-RFP,iscope,iworkiplan,ibudget Aibidibondiisitypicallyi__%iofitheicontractiamount.i-iCorrectiAnswer-5%- 10%

Whatitypesiofiinsuranceiareiconsultingifirmsitypicallyirequireditoicarry?i

  • iCorrectiAnswer-ProfessionaliLiabilityiInsurance Whoiisiresponsibleiforicontrollingiconstructionicosts?i-iCorrectiAnswer- Owner Iniwhichisectioniofiaicontractiareitheifinaliprogramirequirementsilisted?i
  • iCorrectiAnswer-Owner'siResponsibilityiSection Whatiareiliquidatedidamages?i-iCorrectiAnswer- Specificicostsitheicontractoriisirequireditoipayiifihisiworkilastsilongeritha nitheispecifiediprojectilength Strictiliabilityi-iCorrectiAnswer- Doesinotirequireiproofioficarelessnessiorifault;itypicallyiassociatediwithi defectivelyimanufacturediproducts Toiprotectifinancialiassetsifromipotentialicreditorsiainewiconsultingifirm ishouldiformiwhichitypeiofibusinessistructure?i-iCorrectiAnswer-LLC Whatiareifactorsithatidetermineitreeivalueiinilegalicases?i- iCorrectiAnswer-Location,iage,isize,iuse,icondition

Howidoifederaliagenciesiadvertiseifederaliprojects?i-iCorrectiAnswer- ThroughitheiFBOiwhichistandsiforiFederaliBusinessiOpportunites Whatiisiincludediiniaicityicharter?i-iCorrectiAnswer- Aimunicipalicharteriisitheibasicidocumentithatidefinesitheiorganization,i powers,ifunctionsiandiessentialiproceduresiofitheicityigovernment.iThei charteriis,itherefore,itheimostiimportantilegalidocumentiofianyicity. WhoipreparesiaidailyilogiofiRFI,iASI,ichangeiorders,ietc?i- iCorrectiAnswer-Constructioniadministrationicoordinator Whatiisiaibackcharge?i-iCorrectiAnswer- Aniadjustmentimethodibyiwhichiaicontractorichargesitheiresponsibleipa rtyiforirepeatingiaitaskioricorrectingiaisequentialistep WhichiCSIidivisioniwouldioneifindiExistingiConditions?i-iCorrectiAnswer- F Whatitypeiofiinsuranceicoversiaithirdipartyioniaiconstructionisite?i- iCorrectiAnswer-GeneraliLiabilityiInsurance Aniactionibyiaistateiboardiagainstiailandscapeiarchitectiisiwhichitypeiofia ction?i-iCorrectiAnswer-Administrativeiagencyiaction

Ailandscapeiarchitectiwouldiseekiwhichitypeiofiassistanceiforiaistateiboa rdihearing?i-iCorrectiAnswer- Administrativeipracticeiassistanceiwouldibeisoughtiinithisicase. Whatiisimalfeasance?i-iCorrectiAnswer- Refersitoianierroneousiprofessionaliactionitakenibyiaipubliciofficial Whatiisinegligence?i(1)i-iCorrectiAnswer- Wheniaidutyitoiactiwasinotimadeiorianiomissioniofisomeitypeiwasimadei (appliesitoitheiprivateisector) Whatiisiabatement?i-iCorrectiAnswer- Theiactionitakeniagainstiaipropertyiowneritoienforceicodeicompliance.iT hisiactiauthorizesiremovaliofianiimprovementiwhichidoesinotimeeticode . Whatiisitheiactioniwhichiallowsiaigovernmentibodyitoiremoveianiimprov ementiwhichidoesinotimeeticode?i-iCorrectiAnswer-Abatement Whatiisianiassignment?i-iCorrectiAnswer- Theitransferiofianiobligationioricontractifromioneipersonitoianother Whatiisiaifeasibilityistudy?i-iCorrectiAnswer- Aniassessmentiofitheipracticalityiofiaiproposediproject

WhatiisitheiroleiofiaiClerkiofiWorks?i-iCorrectiAnswer- Alsoiknowniasisiteiinspector;iEnsuresitheiqualityiofimaterialsiandiworkm anshipiareiinilineiwithitheispecsiandidrawings.iSpecificitasksimayiinclude :iverifyingitheiquantitiesiofideliverediearthwork,imeasuringistorediprod ucts,iloggingianditrackingivisitorsiiniandioutiofitheijobsite Differenceibetweenilicensureiandiregistration?iWouldisomeistatesirequ ireilandscapeiarchitectsibeioneiandinotitheiother?i-iCorrectiAnswer- Registrationigetsiyouisignediupiandiinitheidataibaseiforiwhateveristateiy ouiareiworkingiin.iLicensureiisitheiactualicertificateithatiallowsiyouitoipr acticeiasiailandscapeiarchitect. Whatiisitheipurposeiofiaisoilsireport?i-iCorrectiAnswer-Pre- construction:ireportitheiphysicaliandiengineeringicharacteristicsiofiaisoil iwhichiwillibeiusediasibuildingimaterial. Duringiconstruction:iverifiesisoiliamendmentiperformanceiandisoilifertil ityitoiensureisoiliisimoreiproductiveiforiplantigrowth Wheniisiaisoilsireportiperformed?i-iCorrectiAnswer- Dependsioniwhichitypeiisimeantibyisoilsireport.iSoiliengineeringiandisoili contaminationireportsiareiperformediprioritoianyiconstructioniandiposs iblyiprioritoibidding.iAisoilsiagronomyireportiisimostilikelyiperformedilat eriinitheiproject.i Whileisoilireportiandi"geo"ireportiareiofteniusedisynonymously,itheyire feritoidifferentiyetirelatediservices.iAisoilireportiisipreparedibyiaigeotech

nicaliengineer,ioriaisoilsiengineer.iAisoilireportiisitypicallyicomposediofiai textiportion,isiteiplan,iboringilogs,isomeifigures,iandiengineeringicalcula tions.iSoiliengineersianalyzeifieldiconditionsiandisoililaboratoryidata,ipe rformicalculations,iandiprovideirecommendationsiforibuildingifoundati ons. Aigeologyireportiisipreparedibyiaigeologistioriengineeringigeologist.iGeo logistsidiscussiandianalyzeinaturaliconditionsiandiseismicihazards,isuchi asiearthquakes,ilandslides,ihighigroundwater,iorimudflowiandidebrisiflo ws,iinigreateridetailithanidoiengineers.iInimanyigeographicaliareas,itheie xpertiseiofibothianiengineeriandigeologistiisirequirediprioritoisiteidevelo pment,isuchiasihillsideiareas,ifaultizones,iandiareasisubjectitoihighigroun dwater.iAsisuch,imostireportsiincludeibothiaisoiliengineeringiandigeolog iciportion,iandiasisuchiareireferreditoiasisoil/geologyireports. Theitermi"soilireport"icanihaveimanyimeanings.iInitheiconstructioniindu stry,isoilireportitypicallyirefersitoiaireportiofitheiphysicaliandiengineerin gicharacteristicsiofiaisoiliwhichiwillibeiusediasibuildingimaterial. Aisoilicontaminationireportiisiaiseparateiservice,iandirequiresitestingiofi soilisamplesiforicontaminantsisuchiasisolvents,ihydrocarbons,iandipesti cides.iSuchiaireportioftenifollowsianienvironmentaliinvestigation,iandiisi preparedibyiaiprofessionaligeologistioriengineeriwithiexperienceiinienvi ronmentaliconsulting.iAESihasigeologistsiandiengineersiwithitheinecess Whoipreparesiaisoilsireport?i-iCorrectiAnswer-Agronomist

Theispecificiprocedureitoipressureitestianiirrigationimainiduringiconsruc tioniwouldibeifoundiinithei_______.i-iCorrectiAnswer- Contractoriperformanceisectioniofispecifications Theitestingirequirementsiforianiirrigationisystem'sibackflowipreventioni deviceiwouldibeifoundiinithei______.i-iCorrectiAnswer- Localioristateihealthicodes Whatiareisomeicommonitasksiperformedibyimaterialitestingifirms?i- iCorrectiAnswer- Tasksiincludeiverifyingiearthworkidensities,iconductingisieveianalysesi(t oimeasureiparticleisizesiinigranularisoiliorirockimaterial),iperformigislum piandibreakitestsi(toicheckiconcreteistrength) Whichipartyiisiresponsibleiforianiirrigationisystem'sievaluation?i- iCorrectiAnswer- Theilandscapeiarchitectioriirrigationiconsultantiassistingitheilandscapeia rchitect Whatiisiaislumpiandibreakitest?i-iCorrectiAnswer- Testsitheistrengthioficoncrete Whichipartyiisiresponsibleitoishowitheipropertyirestrictionsi(listediinithe ititle)?i-iCorrectiAnswer- Theilandisurveyoriisitheipartyibestitraineditoireadiandishowitheirangeiofi privateirestrictionsiaffectingiaiproperty

Toimaintainianiirrigationisystem'siperformanceipost- construction,itheilandscapeiarchitectishouldirecommendi____.i- iCorrectiAnswer- Theiclientitoiorderiaiwateriauditiandipurchaseireplacementipartsitoimat chitheisystem'sioriginalidesign. Whatiisitheipurposeiofiaiwateriaudit?i-iCorrectiAnswer- Identifiesiwhereiexcessiwateriisibeingiusediandicanihelpidetermineiprac ticesitoireduceiexcessiwatericonsumption Constructionidocumentsiareiusuallyidividediiniwhichifouricategories?i- iCorrectiAnswer- 1)iworkingidrawingsi(scaledigraphiciplansirepresentingitheiproposedisit eidevelopment) 2)specsi(writtenidescriptioniofidesirediwork,imethodsitoibeiused,iperfor manceirequirements,iandiqualityistandards) 3)generaliconditionsi(contractirequirementsiincludingiinsuranceicovera ge,ifieldichangeiorders,iandiotheriadministrativeiduties) 4)aniagreementiformiakaitheicontracti(ailegallyibindingidocumentibetw eenitheiownerianditheicontractoricontainingiaicompleteilistiofibidiitems)