Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

LEED Green Associate Exam Preparation: Questions and Answers, Exams of Nursing

A collection of questions and answers related to the leed green associate exam. It covers various aspects of leed certification, including the rating system, credit requirements, and the integrative process. The questions are designed to help individuals prepare for the leed green associate exam and gain a better understanding of green building principles and practices.

Typology: Exams

2024/2025

Available from 12/14/2024

Beverlyn
Beverlyn 🇺🇸

4

(2)

2.5K documents

1 / 18

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
LEED Green Associate questions and
answers
LEED Addenda - If an error is found in the LEED rating system, which of the
following would USGBC use to address the error?
1. It is market-driven; 2. It is government-financed; 3. It is consensus-based - What
are three important factors of LEED Green Building Rating System?
1. Give clear guidance to customers; 2. Protect the integrated of the LEED
program; 3. Reduce certification process challenges - What are the goals of the
Minimum Program Requirements?
LEED BD+C: Homes - A multi-family building that is 3 stories tall would be certified
under what rating system?
Identifies the main sustainability goal or benefit of the prerequisite or credit. -
Each LEED credit and prerequisite includes the intent of the credit/prerequisite.
What it the intent of a credit/prerequisite?
Accessing web-based reference guides. - Which of the following actions can NOT
be performed by a project team member using LEED online?
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12

Partial preview of the text

Download LEED Green Associate Exam Preparation: Questions and Answers and more Exams Nursing in PDF only on Docsity!

answers

LEED Addenda - If an error is found in the LEED rating system, which of the following would USGBC use to address the error?

  1. It is market-driven; 2. It is government-financed; 3. It is consensus-based - What are three important factors of LEED Green Building Rating System?
  2. Give clear guidance to customers; 2. Protect the integrated of the LEED program; 3. Reduce certification process challenges - What are the goals of the Minimum Program Requirements? LEED BD+C: Homes - A multi-family building that is 3 stories tall would be certified under what rating system? Identifies the main sustainability goal or benefit of the prerequisite or credit. - Each LEED credit and prerequisite includes the intent of the credit/prerequisite. What it the intent of a credit/prerequisite? Accessing web-based reference guides. - Which of the following actions can NOT be performed by a project team member using LEED online?

answers

Traditional building codes. - What is the International Green Construction Code(IGCC) intended to replace? From a whole building perspective over a building's life cycle. - How does LEED evaluate the environment performance of a building?

  1. Promote beneficial effects; 2. Be easily implemented; 3. Mitigate the environmental harms of a building. - The point values of a credit are based on the credit's ability to: The agent must sign and upload the Confirmation of Agent Authority(COAA) to the project details page before registration. - When an owner's agent registers a project on behalf of the project owner, which of the following details is true? The project timeline. - What part of LEED Online can be used to obtain a real-time snapshot of the project's progress? That the credit has a Licensed Professional Exemption. - Some credits in In LEED Online have an LPE option. What does LPE mean?

answers

To allow credits to be refined through LEED project evaluations before they complete the balloting process for introduction into LEED. - What is the purpose of LEED Pilot Credit Library?

  1. Project Admin; 2. Project Team Manager; 3. Project Team Member; - LEED Online has three authorization levels for team members: Cost-effective LEED certification on a volume scale. - What does the LEED Volume Program help with? Change industry standards - Which of the following is NOT a guiding principle of USGBC? usgbc.org - Where should a project team go for updates and errata for the LEED BD+C: New Construction rating system. Credit for Green Power - Which of the following is NOT a difference between LEED v4 and LEED 2009

answers

LEED - When writing a project case study, how should the first usage of the rating system be written? LEED-certified - Grammatically, what language is the appropriate usage to describe a project that has been certified at any level? Buildings and communities that will regenerate and sustain the health and vitality of all life within a generation. - What is USGBC's vision Prerequisite. - What term refers to a mandatory project characteristic, measurement, quality, value or function as identified within the LEED rating system? ISO 14000 - Which of the following assess environmental performance of products and services and provide guidance to improving their environmental performance. The integrative process is iterative. - Which of the following identifies the biggest difference between integrated process and traditional building process?

answers

Energy and Water - For the LEED integrative process, which of the following analyses inform early design decisions through high levels of collaboration among all project team members? Environmentally preferable - Products that meet ISO 14000 standards are: The site area should be checked to make sure it is consistent across credits. - Which of the following indicates one of the final steps that should occur prior to submitting the project's final documentation for certification? Identifying opportunities for synergy. - Which of the following is one of the tasks that integrative project team members complete during the Discovery phase? Green building goals were not set in the pre-design phase. - What is the primary reason that a LEED project can have higher development costs compared to conventional development? EN 13779:2007; EN 15252:2007 - Which of the following standards for Indoor Air Quality were added in LEED v4 for internationalization?

answers

LEED Rating System adaptations - What LEED developments address specific space types and international requirements? U.S. Green Building Council - Which of the following instances of documentation is an acceptation form when the name of the organization is appearing in a press release for the first time? Not include the credit in the final application - The project team will not meet the threshold requirements of a particular LEED credit. What is the proper course of action that the team should take regarding this credit? Green Star; Breeam; Green Globes - Which of the following are green building rating systems that exist in addition to LEED? Exploring and comparing the green dimensions of the built environment - For which of the following would a LEED Green Associate use the Green Building Information Gateway (GBIG)? Timeline - A Construction Appeal Review would show up in which section of LEED Online?

answers

LEED BD+C: Homes - What rating system adjusts the certification level(Platinum, Gold, Silver, Certified) based on the project size? Using the LEED Volume Program - A hamburger franchise is planning on building thirsty new restaurants across the country in the next two years. Each restaurant is based on the same prototype. How should the multiple buildings be certified? Uploading a preliminary LEED project checklist - Which of the following is NOT part of the process when registering a new LEED project? LEED credit form - What is submitted to document that the requirements of a credit or prerequisite were met? Prerequisites - What are the key criteria that define green building performance? 7 - How many impact categories where developed and approved by the LEED Steering Committee for LEED v4? LEED interpretations are precedent-setting. - What is one difference between LEED interpretations and project CIRs?

answers

LEED Project Checklist - What should be used during all project phases to verify the green building goals are being met?

  1. Errata and Addenda; 2. Next version of LEED; 3. Adaptations - What are the basic types of LEED improvements that are updated through revisions on a regular development cycle? The Campus Program can be used for projects not necessarily uniform in design or operations but located on a single campus location. - A university client asks about certifying multiple buildings. Which of the following is an appropriate response? Each credit is independently evaluated within the seven impact categories. - How are the number of points a credit can earn in LEED v4 determined? The LEED Homes rating system that corresponds to the ENERGY STAR program in which they are participating. - Which of the following LEED rating systems would the project team of a planned new three-story apartment building choose?

answers

Sustainable Sites - What LEED credit category encourages strategies that minimize the impact on ecosystems and water resources? A campus requires at least one master site and one project. - Which of the following does a campus require for project registration? LEED BD+C: Core and Shell - Which LEED rating system has pre-certification? One specific inquiry - The submittal of a Credit Interpretation Request(CIR) should include: Submit a CIR using LEED Online. - If a mechanical engineer on a LEED project team needs guidance on whether a particular software package can be used to measure energy efficiency, how should the engineer proceed?

  1. Paints; 2. Coating; 3. Cleaning products - What type of products would carry a Green Seal Label?

answers

Discovery - Which of the following is considered the most important phase of the integrative process? ENERGY STAR for Homes - In LEED BD+C: Homes which standard is used to measure minimum energy performance? Indoor air quality - What does ASHRAE 62.1 specify? When determining the minimum energy performance of a two-story residential project. - When would a project team member use the HERS(The Home Energy Rating System) Index?

  1. When the reference guide does not address a specific issue; 2. When a conflict in a credit or prerequisite requires resolution - In what instances would a project team submit a Credit Interpretation Request(CIR)? Declarant - LEED credit forms must be signed by which person? After the construction phase - At what point can a project earn points for credits?

answers

LEED Steering Committee - Who is responsible for ensuring the use of the consensus process to evolve LEED in accordance with the mission, guiding principles, and strategic plan of USGBC? LEED Project Checklist - What tool is used to determine the target certification level?

  1. LEED O+M: Existing Buildings; 2. LEED ID+C: Commercial Interiors - If a building has already earned LEED BD+C: New Construction certification what additional certifications could the building earn in the future? Minimum Program Requirements - Which of the following defines the types of buildings, spaces, and neighborhoods that the LEED rating system is designed to evaluate? High-rise residential buildings nine stories high - The LEED BD+C: New Construction rating system is appropriate for which of the following:

answers

LEED O+M: Existing Buildings - What LEED rating system addresses exterior site maintenance programs? Enhance social equity, environmental justice, and community quality of life. - What impact category most directly helps with the people aspect of the triple bottom line?

  1. Whether the project is listed as public or private in the LEED project directories;
  2. Whether the project will use IP units or SI unites for measurement - When registering a new LEED project, which of the following project details can be entered on the registration form?
  3. Minimum building height; 2. Uniform site boundary - What is NOT a LEED Minimum Program Requirement in LEED v4?
  4. LEED green building program; 2. Local chapters - How does USGBC support achievement of its mission? Climate change - Which of the following impact categories is given the greatest weight in LEED?