LEED Green Associate Exam Preparation Study Guide 2023, Exams of Marketing Business-to-business (B2B)

A study guide for the LEED Green Associate Exam. It contains 60 multiple-choice questions with answers and explanations. The questions cover a range of topics related to green building and sustainability, including energy efficiency, water conservation, site selection, and indoor air quality. The guide is intended to help individuals prepare for the LEED Green Associate Exam and become certified in green building practices.

Typology: Exams

2023/2024

Available from 11/11/2023

TOPGradeBooster.
TOPGradeBooster. 🇺🇸

3.6

(58)

5.2K documents

Partial preview of the text

Download LEED Green Associate Exam Preparation Study Guide 2023 and more Exams Marketing Business-to-business (B2B) in PDF only on Docsity!

LEED Green Associate Exam Preparation Study Guide 2023.

When selecting your answers, choose the answer that best addresses the question asked.

Which rules provide guidance for making a decision when several rating systems appear to be appropriate for a project? (Choose 2) A 25/ B 40/ C Use the rating system that is most applicable D 75/ 2 What must the project team submit via LEED Online in order to verify prerequisite and credit compliance? A Letter of attestation B LEED Scorecard C CIR D Credit Forms 3 Which source consumes the largest amount of energy in commercial buildings? A Space Heating B Office Equipment C Water Heating D Lighting 4 Which standard, code, organization or policy provides legal protection of the ozone layer in the U.S.? A U.S. Department of Energy (DOE) B U.S. Environmental Protection Agency (EPA) C Kyoto Protocol D The Montreal Protocol on Substances That Deplete the Ozone Layer 5 Which mandatory requirements must all LEED rating systems comply with? (Choose 2) A Credits B Charrettes C CIRs D Minimum Program Requirements (MPRs) E Prerequisites 6 What is the baseline water consumption for a water closet? A 1.6 gallons per minute B 0.6 gallons per flush C 1.6 gallons per flush

D 1.0 gallons per minute

13 What determines the Regional Priority credits that are made available to the project? A Achieving the highest threshold level of the credit B The geographically specific location of the project C Ensuring all environmental concerns associated with energy usage for the project location are achieved D Determining all local environmental issues are achieved as identified by the Project Team 14 Which of the following describes how the LEED project boundary is defined? A The property inside the development footprint that is submitted for certification B The property outside the building footprint that is submitted for certification C The boundary description that is submitted for certification D The same as the attendance boundary 15 How many LEED rating systems are there? A 5 B 10 C 19 D 21 16 Which type of water is permitted as an alternative water source for indoor water use? A Well water B Used process water C Blackwater D Water discharged from an open-loop geothermal system 17 Which standard or program compares the energy performance of multiple buildings? A ENERGY STAR Portfolio Manager B Energy Policy Act of 1992 C ASHRAE Standard 90.1- 2010 D ASHRAE Standard 55 - 2010 18 What is the primary purpose of the LEED Scorecard? A Allows the project team to track attempted credit points B Allows the project team to track prerequisites C Allows the project team to track MPRs D Allows the owner to track the performance of the project team 19 What does every credit category begin with in the LEED reference guides? A Intent B Overview C Requirement D Triple Bottom Line Analysis

Which of the following organizations supports LEED, in addition to having its own building certification program? A ASHRAE B ENERGY STAR C American Council for an Energy Efficient Economy (ACEEE) D Advanced Buildings Core Performance Guide 21 Which statement is true for a project to qualify for the LEED BD+C: Homes rating system? A The project must be a single family residential project B The project cannot be a multistory residential project C The project can be a 3 story or less low-rise multifamily residential project D The project can be an 8 story mid-rise multifamily residential project 22 Buildings are associated with what percentage of all carbon dioxide emissions in the U.S.? A 14% B 38% C 72% D 50% 23 Source reduction relates to which one of the following areas? A Heat island effect B Waste prevention C Stormwater runoff D Energy reduction 24 How many levels, or tiers, of LEED professional accreditation are available?? A 4 B 3 C 2 D 7 25 Impact Categories were developed for incorporation into LEED v4 to address which of the following? A TRACI Categories B Regionalization C LEED’s Goals D Minimum Program Requirements (MPRs)

31 Which of the following is considered a green code? A Leadership in Energy and Environmental Design (LEED) B ENERGY STAR C lgCC D ISO 14000 32 LEED promotes development on high priority sites. What types of sites would be classified as high priority sites? (Choose 3) A A site with a reduced parking footprint B A Federal Enterprise Community site C An infill location in a historic district D A site in a walkable community E A brownfield where soil or groundwater contamination has been identified F A site that offers quality transit alternatives 33 Which strategy will help reduce construction related on-site pollution in the Sustainable Sites mandatory prerequisite for all LEED BD+C Rating Systems? A Controlling the hours for heavy equipment operation B Planting invasive landscaping C Installing rain gardens D Mulching 34 Which of the following statements best describes Smart Growth? A Promotes green energy growth B Promotes the future development of USGBC and LEED C Promotes a unique sense of community and place D Supports the need to separate uses (e.g. community-serving retail, civic facilities) in a hierarchical manner 35 What is one of the primary tasks for an integrated project team during the Discovery phase? A Understanding system interactions B Register the project via LEED Online C Secure project financing D Make certain there is a local waste hauler that recycles waste 36 How is Floor Area Ratio (FAR) defined? A FAR is the measure of the density of residential and non-residential land use on buildable land B FAR is the measure of the density of residential and non-residential land use on all land within the property C FAR is the measure of the density of non-residential land use on all land within the project boundary D FAR is the measure of the density of non-residential land use on buildable land

37 How would a product that can be recycled at the end of its useful life be classified? A Cradle to Gate B Preconsumer content C Cradle to Grave D Cradle to Cradle 38 LEED projects cover a wide range of building types and occupants. How does LEED define visitors (tran- sients)? (Choose 2) A Retail customers B Peak Outpatients C Part time employees D Full time receptionists E Operations and maintenance staff 39 What defines the cost or benefit that affects a party who did not choose to incur that cost or benefit? A Ponzi schemes B Externalities C The Butterfly Effect D The Prius Effect 40 Which of the following is not a source of alternative or renewable energy? A Renewable energy production B Green Power C Carbon Offsets D Demand Response 41 According to the Environmental Protection Agency, how much time do Americans typically spend indoors? A 75% B 50% C 90% D 35% 42 ASHRAE standards address which of the following? (Choose 4) A Rainwater management BMPs B Minimum requirements for the energy efficient design of most buildings C Volatile Organic Compounds D Minimum ventilation rates E Thermal comfort conditions F MERV ventilation air filters

49 Which of the following describes site energy? A The total amount of raw fuel that is required to operate the building B The raw fuel that is burned to create heat and electricity C The energy product (heat or electricity) created from a raw fuel D The amount of heat and electricity consumed by a building as reflected in utility bills 50 Rainwater harvesting systems are designed to address which of these environmental concerns? (Choose 2) A Water efficiency B Sensitive land protection C Heat island effect D Rainwater management 51 MERV ratings for air filters are determined by which of the following standards? A ASHRAE 90.1- 2010 B ASHRAE 55 - 2010 C ASHRAE 52.2- 2007 D SCAQMD 52 A project’s hard cost budget would include which of the following 2 items? (Choose 2) A Electrical system controls B Wall coverings C Office personal computers D Furniture 53 Which of the following requires preparing an energy model on a LEED BD+C: Homes single family project? A ENERGY STAR for Homes, version 3 B ASHRAE 90.1– 2010 C HERS rating D NAHB ICC 700 National Green Building Standard 54 What does low-impact development (LID) and Green infrastructure (GI) address? A Heat Island Reduction B Rainwater management C Light Pollution Reduction D Construction Activity Pollution Prevention

55 Which of the following are nationally or internationally recognized green building rating systems? (Choose 2) A Green Advantage B ENERGY STAR C BREEAM D International Green Construction Code (lgCC) E Green Star 56 Why would the project team submit a request for a Credit Interpretation Ruling (CIR)? A To receive approval for questionable credit strategies B To appeal credits that have been denied C To receive technical guidance on LEED credit strategies D To communicate with project teams regarding credit interpretations on other projects 57 Monitoring and verification are critical to the success of green buildings. M & V begins with which process? A The Discovery Phase B Benchmarking C A holistic approach to green building design D Ensuring IAQ performance 58 How does the project team register a project for LEED certification? A Contact USGBC B Register via LEED Online C Contact GBCI D Contact USGBC for a registration number then sign in at LEED Online 59 Which of the following allows project teams with unique project needs additional options or approaches for achieving LEED credit(s)? (Choose 2) A Alternative Compliance Paths (ACPs) B LEED Online credit review C Discussion with GBCI D Global Alternative Compliance Paths (Global ACPs) 60 How does the EPA defines a brownfield site? A A site that has been previously developed and is presently vacated B A site that is or may be complicated by the presence of a hazardous substance, pollutant, or contaminant C A barren site without vegetation D A site that has been previously developed and is presently occupied

67 Which of the following is not a building code? A International Code Council (ICC) B International Building Code (IBC) C International Residential Code (IRC) D SmartCode 68 The greatest threat to global warming potential is presented by which group of refrigerants? A CFCs (ChloroFluoroCarbons) B HCFCs (HydroChloroFluoroCarbons) C HFCs (HydroFluoroCarbons) D CFC- 500 (ChloroFluoroCarbons) 69 When selecting refrigerants, what is most important for the project team to take into account? A The availability of the refrigerant B An analysis of trade-offs between global warming and ozone depletion C The cost of the refrigerant D A determination of the refrigerant’s overall global warming potential E IV Project Systems and Energy Impacts (Energy & Atmosphere) 70 Which of the following statements is not true regarding environmental tobacco smoke control? A Smoking is not permitted in residential projects B Signage prohibiting smoking must be posted 25 feet from all entry locations C Signage prohibiting smoking must be posted 25 feet from all operable windows D Smoking is not permitted outside the building except in designated smoking areas 71 Which of the following statements is true regarding occupant surveys? A Surveys are required to be anonymous B Surveys are one of the EQ prerequisites C Surveys identify areas that need improvements D Surveys must be taken every 5 years and submitted to USGBC 72 What type of energy is used by products that are powered by means of an ordinary AC plug? A Process energy B Process load C Plug load D Unregulated load

73 Which of the following should be considered early in the design process when planning room layouts? A Acoustic performance B How the building flush out will be conducted C Which employees get window offices D The effects of ETS particulate matter on room surfaces 74 Which of the following affects the ventilation levels of a space? (Choose 2) A The types of occupant activities being performed B The total occupant load during a 24 hour period C The type of occupant clothing D The time of day when occupancy will be the greatest 75 Temperature, air speed, and humidity are addressed by which standard? A ASHRAE 90.1- 2010 B ASHRAE 55 - 2010 C ASHRAE 62.1- 2010 D ASHRAE 52.2- 2007 76 Which of the following is one of the primary goals of the Commissioning Process? A The project will earn enough points for certification B The project complies with the Owner’s Project Requirements (OPR) C The project complies with local building codes D The project complies with the Commissioning Authority Basis of Design (BOD) 77 VOC limits for clear wood finishes and adhesives, sealants, and sealant primers are addressed by which standards? (Choose 2) A Green Seal B SCAQMD Rule 1113 C California Air Resources Board (CARB) 93120 D SCAQMD Rule 1168 78 Which strategy can the project team suggest if the building owner wants to maintain ongoing energy efficiency and performance? A Enhanced Commissioning B Retrocommissioning C Building Automation Systems D Enhanced Refrigerant Management

85 Many building codes incorporate which two standards? (Choose 2) A SCAQMD B Uniform Plumbing Code (UPC) C EPAct 1992 D International Plumbing Code (IPC) 86 Which referenced standard is used for reducing site lighting pollution? A Low Impact Development (LID) B BUG rating C Green Infrastructure (GI) D Best Management Practices (BMP) 87 Which of the following strategies will not reduce the heat island effect caused by nonroof surfaces? A Planting large native trees for shading B Increase parking using pervious materials C Open grid pavement systems that are at least 50% unbound D Placing at least 25% of the parking under shade 88 When the owner and staff establish purchasing policies and plans for onging Operations and Maintenance (O&M), which of the following should they consider? (Choose 2) A Ongoing consumables B Durable goods C Demand Response program D Material attributes 89 Which of the following is a major concern with interior lighting? A Insufficient daylighting B Too much individual lighting control C Uniform fluorescent lighting D Glare 90 What is the primary goal of the Building Product Disclosure and Optimization - Environmental Product Declarations (EPDs) product selection? A Products verified to have been extracted or sourced in a responsible manner B Products that have verified improved environmental life-cycle impact C Products verified to minimize the use and generation of harmful substances D Building life-cycle impact reduction

91 Which of these locations would be more appropriate to consider for a new technology data center? A Land that is 25 feet from a wetland as defined by the U.S. Code of Regulations (CFR) B Land with plants listed on a federal or state threatened species list C Previously developed land located 110 feet from a fishing stream D 10 acres of a 100 acre farm defined by the USDA as prime farmland E Previously developed land located 40 feet from a wetland 92 Which sites would promote Smart Growth principles? (Choose 2) A A site that provides access to quality transit B A low density location in a rural area that offers tax incentives C A previously undeveloped site D A mixed-use development 93 Which LEED BD+C: New Construction credit gives building occupants a connection to the natural outdoor environment? A Direct Exterior Access B Places of Respite C Site Master Plan D Quality views 94 How can heat gain be mitigated when attempting the Daylight credit? A Reduce the amount of glazing B Install most of the glazing on south facing walls C Install high-performance glazing D Use a darker color scheme for the interior surfaces 95 Which strategy encourages building occupants to use alternative transportation? A Locate the project away from busy high density locations B Install required parking underground C Reduce the amount of parking D Restrict parking to be code compliant 96 Who is the person or entity responsible for field verification and testing on a LEED for Homes project? A LEED for Homes Provider B LEED AP C GBCI D Green Rater

1 B, C

2 D

3 A

4 B

5 D, E

6 C

7 B

8 A, C

9 C

10 C

11 A, C, D

12 B, D

13 B

14 C

15 D

16 B

17 A

18 A

19 B

20 B

21 C

22 B

23 B

24 B

25 C

26 A, C

27 B, D

28 C

29 C, D

30 B, D

31 C

32 B, C, E

33 D

34 C

35 A

36 D

37 D

38 A, B

39 B

40 D

41 C

42 B, D, E, F

43 A

44 A

45 A

46 A, C

47 A, B

48 B

49 D

50 A, D

51 C

52 A, B

53 C

54 B

55 C, E

56 C

57 B

58 B

59 A, D

60 B

61 A, B, D

62 B

63 B

64 A

65 C

66 D

67 D

68 C

69 B

70 A

71 C

72 C

73 A

74 A, C

75 B

76 B

77 B, D

78 C

79 C

80 C

81 A

82 B, D

83 B

84 D

85 B, D

86 B

87 B

88 A, B

89 D

90 B

91 C

92 A, D

93 D

94 C

95 C

96 D

97 B

98 C, D, E

99 A

100 A, B

101 C