Download LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (10 and more Exams Nursing in PDF only on Docsity! LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) All the following are part of the USGBC's policy regarding the use of their officially registered logo, except: A. The logo is provided by the USGBC. B. The logo may only refer to a USGBC program or product. C. The logo signifies endorsement by the USGBC. D. All uses of the logo must include a trademark, except when repeated logos in the same document. E. The USGBC logo is less prominent in a document than the logo of the user - correct answers ✅C. The logo signifies endorsement by the USGBC. A mixed-use project is proposed with one story or level of residential apartments over ground floor retail core and shell space. Which LEED rating system should the team use to certify the project? A. LEED Homes: Low-rise. B. LEED BD+C: New Construction C. LEED BD+C: Core & Shell D. LEED Neighborhood Development - correct answers ✅B. LEED BD+C: New Construction LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) The primary project team member responsible for managing the documentation for a project in LEED Online is known as the _________________________. A. LEED Project Analyst B. LEED Project Assistant C. LEED Project Ombudsman D. LEED Project Administrator - correct answers ✅D. LEED Project Administrator Which one of the following refers to a way of analyzing the environmental, social, and local impact of a material or product? A. Impact cycle assessment B. Life cycle costs C. Life cycle assessment D. Purchasing of ongoing consumables - correct answers ✅C. Life cycle assessment. Which of the following is not a rapidly renewable material? A. Wool LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) E. Asphalt paving with reprocessed asphalt removed from old parking lot F. Insulation made of scrap from denim jean manufacturing - correct answers ✅A, D, F A. Concrete with fly ash from coal-fired power plants D. Acoustical wall panel made with by-product from a plastic bottle F. Insulation made of scrap from denim jean manufacturing All of the following are typical elements of a Construction and Demolition Waste Management Plan, except: A. A waste diversion goal B. Identification of types of waste to be generated during construction C. An estimate of the total weight or volume of each type of waste to be generated during construction D. Identification of local resources for recycling and salvage of materials E. Communication plan to increase participation by jobsite personnel - correct answers ✅C. An estimate of the total weight or volume of each type of waste to be generated during construction LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A developer is proposing a new office building on a former industrial site less than 1/4 mile from downtown, but a freeway separates the site from the restaurant and shopping district. In order to improve the community connectivity of this project, the developer could: A. Incorporate a strip mall and housing into the proposed development B. Propose a jogging trail and bike path connecting to a nearby park and community center C. Propose a gravel path be added to the one road that connects the project site to downtown via a freeway underpass and narrow shoulder D. Propose to provide discounted transit passes to future tenants of the office building - correct answers ✅B. Propose a jogging trail and bike path connecting to a nearby park and community center Where would information on the volatile organic compound content of an adhesive or sealant typically be found? A. Material Safety Data Sheet B. Environmental Protection Agency web site C. Department of Environmental Quality product registry LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. USGBC's LEED complaint product database - correct answers ✅A. Material Safety Data Sheet Increasing access to public transportation can provide which one of the following benefits? A. Reduced heat island effect B. Reduced requirements for bicycle parking C. Increased demand for road capacity D. Reduced vehicle miles traveled - correct answers ✅D. Reduced vehicle miles traveled The Montreal Protocol included a ban on the production of CFC refrigerants in developing countries beginning in what year? A. 1992 B. 1996 C. 2001 D. 2010 - correct answers ✅D. 2010 LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A proposed mixed-use building includes a restaurant on the ground floor. Which of the following services located within walking distance of the project would contribute to Surrounding Density and Diverse Uses? (select 2) A. A bank B. A car dealership C. A hotel D. A hair salon E. The restaurant in the project F. An auto repair shop - correct answers ✅A, D A. A bank D. A hair salon On-site renewable power can be generated using which of the following sources? (select 2) A. Capturing gas from an old landfill on-site and burning it to produce energy B. Purchasing electricity from a wind-farm located 25 miles away C. Burning properly treated wood waste to produce energy D. Burning natural gas in a micro-turbine on-site LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) E. Installing a geo-exchange heat pump system on-site F. Generating electricity from subterranean steam or heat - correct answers ✅C, F C. Burning properly treated wood waste to produce energy F. Generating electricity from subterranean steam or heat Which one of the following scenarios would allow bamboo flooring to be considered both rapidly renewable and regional? A. Bamboo that is harvested oversees and shipped to a manufacturing facility 300 miles from the project site before delivery and installation B. Bamboo that is harvested 80 miles from the project site and shipped to a manufacturing facility 100 miles from the site before delivery and installation C. Bamboo that is harvested 120 miles from the project site and shipped to a manufacturing facility 200 miles from the site before delivery and installation LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Bamboo that is harvested 300 miles from the project site and shipped to a manufacturing facility 500 miles from the site before delivery and installation - correct answers ✅B. Bamboo that is harvested 80 miles from the project site and shipped to a manufacturing facility 100 miles from the site before delivery and installation A LEED Accredited Professional may contribute to a project in all of the following ways, except: A. Facilitates the eco-charrette B. Serves as the LEED Project Administrator for LEED Online C. Guarantees that the project receives LEED certification D. Identifies interactions between LEED prerequisites and credits - correct answers ✅C. Guarantees that the project receives LEED certification All of the following are high efficiency irrigation technologies, except: A. Drip irrigation systems B. Moisture sensors C. Conductivity meters D. Evapotranspiration controllers LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) An owner cannot purchase off-site renewable energy from which of the following? A. A licensed in-state provider of Green-e-certified power B. A local electric utility offering a Green-e-accredited program C. A licensed provider of Green-e-certified power in an adjacent state D. Green-e-accredited renewable energy certificates - correct answers ✅C. A licensed provider of Green-e-certified power in an adjacent state A project team may take any of the following approaches to establish a reasonable LEED project boundary, except: A. Define the LEED project boundary to match the property boundary B. Define the LEED project boundary to match the limits of work of construction for the proposed project C. Define the LEED project boundary to exclude portions of the proposed project that complicate certain LEED credits D. Define the LEED project boundary to include improvements in the public right-of-way that are part LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) of the project scope - correct answers ✅C. Define the LEED project boundary to exclude portions of the proposed project that complicate certain LEED credits A code compliant water closet uses how much water? A. 1.6 gallons per minute B. 1.6 gallons per flush C. 1.2 gallon per flush D. gallons per flush - correct answers ✅B. 1.6 gallons per flush Which of the following are examples of building and material reuse, as defined by LEED Materials & Resources credits? (select 3) A. Salvaged structural timber from a demolished warehouse B. Old brick removed from a demolished wall in a building undergoing renovation, and used for new paving in the buildings courtyard C. Ceiling tiles with known asbestos to be maintained for reuse D. Old wood doors removed during a renovation and installed as countertops in the same building E. Salvaged electrical conduit used for a new electrical distribution system LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) F. Old framing lumber removed from demolished homes and used to manufacturer medium density fiberboard (MDF) panels - correct answers ✅A, B, D A. Salvaged structural timber from a demolished warehouse B. Old brick removed from a demolished wall in a building undergoing renovation, and used for new paving in the buildings courtyard D. Old wood doors removed during a renovation and installed as countertops in the same building Which one of the following is not considered a structural measure for rainwater quality control? A. Pervious pavement B. Retention ponds C. Rainwater cisterns D. Manhole treatment devices - correct answers ✅A. Pervious pavement The LEED Scorecard is intended to be used for which of the following purposes? (Select 2) A. Forecasting the organizations energy expenses. LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A. HVAC protection B. Pollutant source control C. IAQ monitoring D. Housekeeping - correct answers ✅C. IAQ monitoring Which 2 factors are used to determine the solar reflectance index of a material? A. Solar heat gain coefficient and emissivity B. Albedo and emissivity C. Visible reflectance and emissivity D. Albedo and solar reflectance - correct answers ✅B. Albedo and emissivity __________ evaluates the environmental effects of the life of a service, product, or project, inputs and outputs into the system. A. Life Cycle Analysis B. Location Valuation Factor C. Life Cycle Cost LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Waste Hierarchy - correct answers ✅A. Life Cycle Analysis 1. Which of the following water efficiency measures might add the most to construction costs? A. Low-flow faucets and showers B. Dual-flush toilets and waterless urinals C. Grey water reuse system D. Rain water harvesting for irrigation - correct answers ✅C. Grey water reuse system ____________ is a voluntary, consensus-based national standard for developing high-performance, sustainable buildings and interiors. A. Living Building Challenge B. United States Green Building Council C. Leadership in Energy and Environmental Design D. Green Building Certification Institute - correct answers ✅C. Leadership in Energy and Environmental Design Visible light transmittance is most closely associated with what factor? LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A. Daylighting B. Light pollution reduction C. Optimized energy performance D. Lighting power density - correct answers ✅A. Daylighting A developer is proposing a three-story, market-rate apartment complex with a clubhouse and pool in the center. The project will include a central boiler for heating and hot water, but each unit will be separately metered for electricity. Which LEED rating system would be most applicable to certify this project? A. LEED BD+C: New Construction & Major Renovation B. LEED BD+C: Core & Shell C. LEED Homes: Multifamily Lowrise D. LEED ID+C: Commercial Interiors - correct answers ✅C. LEED Homes: Multifamily Lowrise A developer is moving their corporate office into one of the existing buildings that they own. Their new offices will occupy floors 2 through 4 of the seven-story building. Which LEED rating system would be most applicable to certify this project? LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Exclude stakeholders for quicker decision making - correct answers ✅B. Optimize green strategies, drawing on the expertise of all participants Which one of the following are the maximum flush and flow rates allowed by the Energy Policy Acts of 1992 and 2005________________. A. Water closets 1.6 gpm, urinals 1.0 gpm, faucets 0.5 gpf, showers 2.5 gpf B. Water closets 1.2 gpf, urinals 0.8 gpf, faucets 2.2 gpm, showers 2.5 gpm C. Water closets 1.6 gpf, urinals 0.5 gpf, faucets 0.5 gpm, showers 2.5 gpm D. Water closets 1.6 gpf, urinals 1.0 gpf, faucets 0.5 gpm, showers 2.5 gpm - correct answers ✅D. Water closets 1.6 gpf, urinals 1.0 gpf, faucets 0.5 gpm, showers 2.5 gpm What is the largest energy end use in a typical US office building? A. Lighting B. HVAC C. Water heating D. Office equipment - correct answers ✅B. HVAC LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) When evaluating daylighting from windows on the building perimeter, which one of the following refers to "vision glazing?" A. The glazed portion of an interior window with access to a clear view B. The glazed portion of an exterior windows located at least 7'-6" above the floor C. The glazed portion of an exterior window with access to a clear view with added tints to prevent solar gain D. The glazed portion of an exterior window with access to a clear view with no added tints - correct answers ✅D. The glazed portion of an exterior window with access to a clear view with no added tints Which one of the following is not considered a regulated energy use in buildings? A. Service water heating B. Exterior lighting C. Elevators D. Heat pumps - correct answers ✅C. Elevators LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) What are the two ways to earn an Innovation in Design credit? (select 2) A. Specify a new and innovative building system or component that contributes to earning one of the LEED credits B. Demonstrate the environmental benefits of design opportunities not currently considered for LEED credits C. Design a component of the project to significantly exceed the requirements of a LEED credit D. Design the project to exceed the requirements of every LEED credit being pursued E. Design the project to exceed the requirements in three or more LEED credits - correct answers ✅B, C B. Demonstrate the environmental benefits of design opportunities not currently considered for LEED credits C. Design a component of the project to significantly exceed the requirements of a LEED credit Which of the following statements about Innovation in Design credits is not true? A. A project needs to submit a Credit Interpretation Request to confirm the proposed design LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) How many LEED points are available for Innovation in Design? A. 10 B. 3 C. 6 D. 4 E. 8 - correct answers ✅C. 6 What step must a project take to achieve an Innovation in Design credit for a design innovation not addressed by the current LEED rating system? A. Write a custom credit stating intent, requirements and documentation B. Write a custom credit stating intent, estimated cost, estimated annual energy savings, and payback period C. Determine the closest available LEED credit and submit a CIR D. Submit a narrative to the GBCI stating how the project compares to local building codes, showing differences in measurable quantities such as therms, kWh, and gallons of water E. Determine the closest available LEED credit and submit a narrative to the GBCI explaining why the project is an improvement over the current LEED LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) requirements - correct answers ✅A. Write a custom credit stating intent, requirements and documentation Which of the following statements are true in regards to achieving an Innovation in Design credit through Exemplary Performance? A. Exemplary Performance is achieved by doubling the requirements of any LEED credit B. Exemplary Performance is a tiered structure based on incremental performance increases over baseline credit requirements C. Exemplary Performance must be accompanied by a design innovation to earn an Innovation in Design credit D. Exemplary Performance can be achieved by doubling a credit's performance requirement, or reaching the next performance increment, depending on the structure of the credit - correct answers ✅D. Exemplary Performance can be achieved by doubling a credit's performance requirement, or reaching the next performance increment, depending on the structure of the credit LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) All of the following are methods for a project team to earn an Innovation credit for a LEED project, except which one? A. Meet the requirements of a credit in the LEED pilot library B. Meet the requirements of a credit from another LEED rating system C. Have a LEED AP with specialty on the project team D. Achieve exemplary performance of a credit within the project's applicable LEED rating system E. Create a custom innovation credit, not addressed by LEED rating systems - correct answers ✅A. Meet the requirements of a credit in the LEED pilot library What standard determines the minimum energy efficiency requirements for buildings other than lowrise residential? A. ASHRAE 55 B. Green-e C. ASHRAE/IESNA 90.1 D. ASHRAE 62.1 - correct answers ✅C. ASHRAE/IESNA 90.1 LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) An insurance agent is relocating her offices into a 500 square foot storefront space in a newly constructed strip mall. The project includes a full tenant improvement, a new rooftop package mechanical unit, and exterior signage per the developer's tenant standards. Which LEED rating System is most appropriate for this project? A. LEED BD+C: Core & Shell B. LEED ID+C: Commercial Interiors C. LEED BD+C: New Construction D. LEED O+M: Existing Buildings - correct answers ✅B. LEED ID+C: Commercial Interiors A project's LEED certification fee paid to the GBCI is based on which of the following factors? (select 2) A. Target certification level B. Project square footage C. Project site area D. USGBC membership status E. GBCI membership status - correct answers ✅B, D B. Project square footage LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. USGBC membership status A municipality is proposing a renovation of their existing police department. The project includes interior improvements and system upgrades to all spaces in the 50,000 square foot building, except the recently updated 5,000 square foot 911 call center. The project also inc ludes sidewalk and parking improvements and landscaping. Which LEED rating system is most appropriate for this project? A. LEED O+M: Existing Buildings B. LEED ID+C: Commercial Interiors C. LEED BD+C: Core & Shell D. LEED BD+C: New Construction - correct answers ✅D. LEED BD+C: New Construction A developer is proposing a new 20 story office tower. They have already signed a major tenant who will occupy the top seven floors and the tenant improvement of this space will be included in the primary construction scope. Which LEED rating system is most appropriate for this project? A. LEED BD+C: New Construction LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) B. LEED BD+C: Core & Shell C. LEED ID+C: Commercial Interiors D. LEED O+M: Existing Buildings - correct answers ✅B. LEED BD+C: Core & Shell A vegetated roof of native or adapted species may contribute to all of the following LEED credits, except: A. Sustainable Sites: Site Development - Protect & Restore Habitat B. Sustainable Sites: Heat Island Reduction C. Water Efficiency: Outdoor Water Use Reduction D. Sustainable Sites: Rainwater Management E. Sustainable Sites: Environmental Site Assessment - correct answers ✅C. Water Efficiency: Outdoor Water Use Reduction Which of the following is a responsibility of the US Green Building Council? A. Certification of LEED projects B. LEED credentialing maintenance C. Development of the LEED rating system LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) A contractor is beginning site preparation for a new building seeking LEED certification. The site contains an existing building that must be demolished. As the contractor begins implementing the Construction Waste Management Plan, which of the following will be included in the waste diversion calculations? (select 2) A. Concrete rubble from demolished sidewalks B. Soil and rock from the excavation for new foundations C. Trees and shrubs removed during land clearing D. Brick, wood and roofing material from the demolished building E. Flooring and insulation containing asbestos from the demolished building - correct answers ✅A, D A. Concrete rubble from demolished sidewalks D. Brick, wood and roofing material from the demolished building Grey water is: A. Harvested rain water B. Water from sinks and showers C. Water from urinals and laundry LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) D. Water from restroom fixtures - correct answers ✅B. Water from sinks and showers What method must a project team use to measure the distance from the project's building entrance to the nearest public transportation stops? A. Shortest path analysis B. Radius method C. Direct path analysis D. Vehicle miles traveled - correct answers ✅A. Shortest path analysis Which of these is an example of a post-consumer content recycled product? A. Light gauge metal studs made from steel fabrication scrap. B. Ceramic tile made from window glass rejects C. Carpet pad made from scrap from a plastic bottle manufacturing facility D. Medium density fiberboard made from scrapped shipping pallets from a distribution facility - correct answers ✅D. Medium density fiberboard made from scrapped shipping pallets from a distribution facility LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) Which item is not considered an "ongoing consumable" in LEED O+M: Existing Buildings sustainable product purchasing requirements? A. Coffee filters B. Food waste C. Refrigerator D. Printer paper - correct answers ✅C. Refrigerator Where would information on the volatile organic compound (VOC) content of an adhesive or sealant typically be found? A. Material Safety Data Sheet B. Environmental Protection Agency web site C. Department of Environmental Quality product registry D. USGBC's LEED complaint product database - correct answers ✅A. Material Safety Data Sheet Which one of the following refers to a process that encourages the use of products or materials with available life-cycle information about the environmentally, economically, and socially preferable lifecycle LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) What method is used to meet light pollution reduction requirements? A. Backlight-uplight-glare B. Daylight glazing C. Lighting boundary D. Light trespass compliance - correct answers ✅A. Backlight-uplight-glare What document is typically completed by the commissioning authority after construction is completed? A. Functional testing procedures B. Commissioning report C. Commissioning plan D. Basis of design - correct answers ✅B. Commissioning report Protecting ventilation return air grilles with filters and using a wetting agent when sweeping are examples of what? A. An ASHRAE 62.1 compliance plan B. A green housekeeping policy LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) C. A construction indoor air quality plan D. A commissioning plan - correct answers ✅C. A construction indoor air quality plan Which of the following is not a strategy for mitigating the urban heat island effect? A. Pervious paving B. Carports covered with photovoltaic panels C. Open grid paving D. A parking garage - correct answers ✅A. Pervious paving A small office building is proposed in a location with a hot arid climate. What passive design strategy would be least applicable for this project? A. Evaporative cooling B. Passive solar C. Thermal mass D. Exterior shading - correct answers ✅B. Passive solar LEED v4 GA Practice Exam Questions with Verified Answers (2023 Update) Assured Success (100Qs) An approach to reduction of material use and waste in commercial office space is known as: A. Low impact design B. Waste management plan C. Open office planning D. Life-cycle analysis - correct answers ✅C. Open office planning A Phase I Environmental Site Assessment of an existing building confirms: A. The presence of hazardous materials B. The adequacy of ventilation C. The presence of CFC refrigerants D. The quantity of waste being recycled - correct answers ✅A. The presence of hazardous materials A commissioning authority is typically hired by: A. The general contractor B. The owner C. The architect