Michigan Builder License Requirements and Regulations, Exams of Construction

Detailed information about the requirements and regulations for obtaining and maintaining a builder's license in the state of michigan. It covers topics such as the composition of the licensing board, the renewal process, complaint procedures, financial record-keeping, and various legal and regulatory aspects of residential construction in michigan. A wide range of topics related to the construction industry, including licensing, contracts, liability, taxes, and worker's compensation. It serves as a comprehensive guide for residential builders, contractors, and homeowners in michigan, addressing key legal and regulatory requirements that must be understood and followed to operate a successful construction business or undertake a home building project.

Typology: Exams

2023/2024

Available from 07/29/2024

Achieverr
Achieverr 🇺🇸

4.8

(4)

3.9K documents

1 / 8

Toggle sidebar

Related documents


Partial preview of the text

Download Michigan Builder License Requirements and Regulations and more Exams Construction in PDF only on Docsity!

Michigan builder license

Term of board membercorrect answer4 years Board members must meet annuallycorrect answer2 times Board members arecorrect answer4 licensed residential builders, 2 licensed maintenance and alteration contractors, 1 building inspector, 2 general public. Time allowed to renew license without retaking builder examcorrect answer3 years Time allotted for department to acknowledge receipt of complaint to complainantcorrect answer15 days Time allotted to respond to a formal complaintcorrect answer15 days Time allotted to board to determine penalties after an administrative hearingcorrect answer60 days Time allotted to a person to request that a limitation be removed after they receive such noticecorrect answer30 days Time to submit financial records once the board notifies the licensed personcorrect answer30 days Time to notify the department of change in name or address of licensed personcorrect answer30 days Time allotted to licensed person notifying them of an investigative conferencecorrect answer10 days Time allotted to a residential builder to return sale's persons license and for sales person to return I.D card by certified mailcorrect answer5 days

What are the 4 legal documents for a home?correct answerThe survey, the date, the abstract and title, the contract. When do you need an architect to draw/design a house?correct answerAfter 3500 square feet of habitable space. Which type of plan can be adapted to fit many different lots, companies sell these by providing 4 plans and other drawings to show what the finished house will look like.correct answerStock plans Who can remove a limitation once it's put on the license?correct answerThe department and board Negligencecorrect answerAccident you are unaware of. gross negligencecorrect answerbeing aware of problem, and ignoring it. Can a construction salesperson get their own sales license?correct answerNo, only they contractor they work for. A license shall maintain documentation for at least ___ years.correct answer Residential owners have ___ months to make a complaintcorrect answer Workmanship just meet act __correct answer How does the department verify a complaint?correct answerContacting the local building department Department means?correct answerLARA All requirements must be submitted within one year from?correct answerSubmitting builders license application

If a bond is cancelled, a license predicated upon such a bond shall be suspended effective?correct answerUpon date of cancellation If you license is suspended you have __ days to turn it incorrect answer Contractors and suppliers must submit a form within __ days of providing goods and servicescorrect answer Laborers must submit form notice of furnishing within __ days after wages are duecorrect answer The proof of notice of furnishing goes to the ______ and _______.correct answerGeneral contractor, homeowner Proceedings to foreclose must take place within ____ of the date that the claim lien was recorded.correct answer1 year What business entity would have limited liability of a corporation but the tax advantage of a partnershipcorrect answerLLC The most common contract used for residential builders?correct answerLump sum contract Provides a fine of not more than 6 months or not more than $500.00 or bothcorrect answerProvision Provides a cancellation period of three business dayscorrect answerProvision Americans with Disabilities Act (ADA)law applies to employees with more than __ employees?correct answer Michigan civil rights law?correct answerElliot Larsen law

Which employers must carry worker's compensation coverage?correct answerprivate employers regularly employing 3 or more employees 35 hrs or more a week. For 13 weeks. Can an Injury related to intentional misconduct be compensated?correct answerNo Is the job is $___ or more a builders license is requiredcorrect answer Censure means?correct answerDisapproval of professional conduct complaint?correct answerOral or written grievance Physical dominioncorrect answerControl and possession Who appoints the board members?correct answergovernor respondentcorrect answerlicense holder that responds to complaint Accounts Payable?correct answerCurrent amount you owe/liability current assetscorrect answerAssets that can be turned into cash within 1 yr Current Liabilitiescorrect answerPayments of debt within one year Depreciationcorrect answerwrite off long term asset Networthcorrect answerassets minus liabilities A business owner should keep their records a minimum of _ years?correct answer

Personal records should be kept a minimum of _ years?correct answer Shows assets, liabilities, and equity at end of pay periodcorrect answerBalance sheet Shows net profit or lesscorrect answerIncome statement Time to repay construction lien fund in order to avoid suspension of licensecorrect answer90 days 1st penalty for engaging in practice of residential building w/o licensecorrect answerno less than $5, no more than $25,000 and/ or one year 2nd penaltycorrect answerno less than $5,000 no more than $25,000 and/ or two years 3rd penaltycorrect answerno less than $5,000 no more than $25,000 and/ or four years Definition of sole proprietorshipcorrect answerbusiness owned by one person Definition of general partnershipcorrect answerbusiness by 2 or more, merge assets, credit, equipment and talent Definition of limited partnershipcorrect answeratleast one or more general partner general partners and one or more limited partners Definition of corporationcorrect answerentity separate and distinct from its owners Definition of S Corporationcorrect answercorporations that elect to pass corporate income, losses, deductions, and credits through to their shareholders for federal tax purposes Definition of limited liability corporationcorrect answerbusiness structure that protects owner from personal responsibility for its debts or liabilities

In reference to a lien, who must be named in a lawsuit submitted by a sub-contractor?correct answerOwner and General Contractor A person must have a salespersons license to sell jobs if?correct answerhis or her sales are more than occasional. Changes in agreements shall be?correct answerSigned and in writing How many months does a contractor have after filing a claim of lien to bring suit to enforce the lien? correct answer According to federal tax law, what is the last date employers can provide a W-2 to an employee?correct answerJanuary 31 A lien is filed to protect?correct answerHomeowners, suppliers, and subcontractors from lawsuits After filing a lien at the county register deeds, subcontractors and suppliers must notify the homeowner either in person or certified mail within?correct answer15 days ____________ is a signed waiver stating, full payment has been received and that there is no claim of liencorrect answerFull conditional Which of the following is the federal retirement fund?correct answerSocial Security A construction company must file their income taxes?correct answerQuarterly When would an employee not be covered by workers compensation?correct answertraveling from home to work The party responsible for providing a notice of furnishing within 20 days of the first delivery of goods or services is the?correct answersubcontractor

ADA requirements do not apply to?correct answerResidential private apartments and homes B.F.D. meanscorrect answerbarrier-free design What must happen if a complaint is brought her against a contractor and it is settled during an informal conference?correct answerThe department and parties involved must agree on settlement When using an extension ladder, what is the last rung you may stand on according to MIOSHA standard? correct answermust be atleast 36" from the top of the ladder Two boards should be located?correct answerOn top of the planking along the edges MIOSHA rules dictate the minimum distance between power lines and a portable non-metallic ladder. What is the minimum distance allowed?correct answer10' MIOSHA rules state that the maximum permissible height for ladder jack scaffolds is?correct answer20' Why are toeboards used on a scaffold?correct answerHelp prevent tools from falling. The amount of overlap for a ladder up to and including 32 feet is?correct answer3 feet MIOSHA rules state a ladder must extend what minimum distance above the upper landing surface? correct answer3 feet What piece of personal protective equipment (PPE) is an employer responsible for providing?correct answerSafety toe shoes A ladder 20' high would be __ feet from the building at the bottomcorrect answer

The span rating on as 15/2"32 sheet of O.S.B is labeled 32/16. This material is sufficient for the decking of the roof trusses is the truss are __ or less on centercorrect answer A sheathing grade of plywood has an ID complex of ____ plywood edges will be blocked. On what framing member would this plywood be permissible to use when spanning a maximum of __" roof rafterscorrect answer48/24, 48 What is the best tool to use for removing a broken asphalt strip shingle?correct answerFlat pry bar. Plywood roof deck sheathing should be spaced from each other sheet bycorrect answer1/8" Where does base flashing go?correct answerBelow first brick above grade A drip edge has to extent ___ inch below ____ minimum of _ inches up on to the roofcorrect answer1/4, sheathing, 2