Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Michigan Builders License Exam with 100% correct answers, Exams of Building and Prefabrication

Michigan Builders License Exam with 100% correct answers

Typology: Exams

2023/2024

Available from 07/01/2024

bestscore1
bestscore1 🇺🇸

4.7

(3)

2.1K documents

1 / 93

Toggle sidebar

Related documents


Partial preview of the text

Download Michigan Builders License Exam with 100% correct answers and more Exams Building and Prefabrication in PDF only on Docsity!

100% correct answers 2024

IRC (International Residential Code) - ANSWER-Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. First 2 chapters of code book are - ANSWER-Administrative Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F - ANSWER-True Does the building official have the authority to render interpretations of the code? - ANSWER-Yes None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment - ANSWER-8 foot fence. Tables and illustrations are always supported by information found in the written code and footnotes. T or F - ANSWER-False The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as - ANSWER-Live load. If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F - ANSWER-True.

100% correct answers 2024

Illustrations are typically referred to as - ANSWER-Figures. Generally speaking, the building official's job is to - ANSWER-Determine that buildings are built to the minimum enforceable standard. It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F - ANSWER-True. All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets - ANSWER-Kitchen. Bathrooms must be provided with an aggregate glazing area no less than _____ square feet, half of which must be openable. - ANSWER-3. The maximum height of an egress window above the floor is - ANSWER- inches. A basement bedroom must have an egress window with a clear opening of at least ______ square feet. - ANSWER-5.7 sq ft. At least one side-hinged exit door must be in each dwelling unit, and must be _____ feet wide. - ANSWER-3.

100% correct answers 2024

A porch more than _____ inches above grade must be provided with 36" guards. - ANSWER-30 inches. Wall and ceiling finishes shall have a flame-spread classification of no more than ______. - ANSWER-200. According to code, concrete must reach at least 70% of it's ability within ____________days. - ANSWER-7 days. A stud used for a non-bearing partitions may not be notched more than ____% of the stud width. - ANSWER-40%. The Michigan Uniform Energy code applies to new buildings as well as - ANSWER-Additions, alterations, renovation and repairs. ___________ is a measure of how well the window or door assembly conducts heat. The lower the number, the better insulation the assembly will provide. - ANSWER-U-factor. Energy losses from recessed lighting fixtures can often reach ___% of the total thermal loss of a ceiling. - ANSWER-50%. Michigan requires a minimum thermal resistance of ____________for mechanical system piping. - ANSWER-R-3.

100% correct answers 2024

Oversized HVAC equipment has a higher initial cost, a higher operating cost, provides less comfort, and shorter life expectancy. T or F - ANSWER-True. _______ is the compliance route that applies Table 402.1.1 to building envelope components, and is considered the most simple. - ANSWER- Prescriptive Path. ___________ can be used to satisfy U-factor and SHGC requirements. - ANSWER-Area weighted averages. Recessed lights must be _____ rated. - ANSWER-IC (Insulation Contact) Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F - ANSWER-True. The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or - ANSWER-Registered design professional. One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet - ANSWER-State energy code requirements. Historically significant buildings are not exempt from code changes. T or F - ANSWER-False. Insulation products (blown and sprayed) must be documented with: - ANSWER- R-value

100% correct answers 2024

Settled thickness Manufacturer name The new Michigan codes took effect in - ANSWER-March 2011. Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. - ANSWER-10. The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. - ANSWER-Area weighted average. Plans and specifications must be detailed in regards to: - ANSWER-Thermal insulation R-values Design criteria Equipment systems In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. - ANSWER-2009. ___________ is the rate of air infiltration in the presence of a specific pressure differential. - ANSWER-Air leakage. Air leakage is the random movement of air into and out of ________ through cracks and holes. - ANSWER-Windows Attic access hatches Recessed lights

100% correct answers 2024

R-values for insulation and fenestration requirements by component can be found in - ANSWER-Table 402.1. 2009 IECC IECC - ANSWER-International Energy Conservation Code The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. - ANSWER-U-factor and UA alternatives. R-30 is permitted in vaulted ceilings, but is limited to - ANSWER-500 sq feet Floor insulation must be installed to maintain permanent and continuous contact with the underside of the subfloor decking. T or F - ANSWER-True. Michigan falls into climate zones - ANSWER-5, 6 and 7. It is permissible for supply ducts to be run through the framing cavities of a residential building. T or F - ANSWER-False. __________ means an electrical fixture has been tested and listed as suitable for installation in a cavity where the fixture may come in contact with insulation. - ANSWER-IC rated (Insulation Contact) According to the Dept. of Energy, improved energy codes could reduce CO emissions by - ANSWER-3%.

100% correct answers 2024

Attic insulation markers must be installed every _____ square feet. - ANSWER- 300 sq ft. Buildings that are exempted from the new regulations are those with very low energy use or ones that are neither heated or cooled. T or F - ANSWER-True. A contractor needs to remove a non-load bearing wall, does he need to pull a permit? - ANSWER-Yes. A concrete contractor has been hired by an owner to install a driveway and sidewalks. The lot is flat and the concrete is being place on undisturbed earth with a prepared base. Does the contractor need to pull a permit? - ANSWER- No. A permit has been issued for a building project and there is a code infraction in the building plans that has been overlooked by the building official. Can the building official require a correction to a project that they previously overlooked? - ANSWER-Yes. Who issues a well and septic permit? - ANSWER-Health department. Permits are not required for one story detached accessory structures not exceeding: - ANSWER-200 sq. feet. IRC R If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: - ANSWER-The next business day.

100% correct answers 2024

If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. - ANSWER- True. Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? - ANSWER-No. IRC R104. An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? - ANSWER-Yes. Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. - ANSWER-6 ft. IRC R105. If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. - ANSWER-180 days. Can a building official revoke a Certificate of Occupancy? - ANSWER-Yes. When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F - ANSWER-True.

100% correct answers 2024

Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed - ANSWER- Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of - ANSWER-8". Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. - ANSWER-10%. Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? - ANSWER-1/2". Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough - ANSWER-Framing. A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? - ANSWER-Yes. Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? - ANSWER-At the time of inspection.

100% correct answers 2024

A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be - ANSWER-1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above The nosing for stairs shall not be less than 3/4" but not be more than - ANSWER-1 1/4" A front porch is 25 inches above the grade below. Are guards required to be installed? - ANSWER-No. If a smoke alarm is in a bedroom, it doesn't need to be right outside the bedroom also. - ANSWER-False. If spray foam insulation is used to insulate a wall, what is the minimum thickness of drywall needed to cover the foam plastic? - ANSWER-1/2" Finishing materials used for walls and ceiling shall have a flame-spread index not to exceed - ANSWER- Wood joists are 19" above exposed ground. Do they have to be preservative treated or naturally durable wood? - ANSWER-No. You may bulldoze, grade and remove tree stumps in a wetland as long as you have a permit. - ANSWER-True.

100% correct answers 2024

Current code requires that the lowest floors in newly constructed buildings in flood hazard areas not located in designated Coastal A Zones, must have the lowest floors elevated to or above the 100-year design flood elevation. T or F - ANSWER-True. What are the three basic soil types? - ANSWER-Cohesive, granular, organic. The principal reasons to understand soil composition are to: - ANSWER-Reduce settling Provide stability Increase load-bearing capacity If a excavating company needs to haul away 125 yards of bank soil that will swell 20% how many yards of loose soil will they haul away? - ANSWER- yards The exact location of property lines should be determined early in the design phase in order to comply with __________ requirements. - ANSWER-Setback. A garden shed over 200 square feet will require a permit.code T or F - ANSWER- True. What tool would you use to peel back topsoil? - ANSWER-Bulldozer. _________ the root system of a tree during construction can potentially kill it. - ANSWER-Cutting into Piling soil over

100% correct answers 2024

Compacting You would use a ________ to determine a floor is level, but this tool would not help determine if a wall is plumb. - ANSWER-Builders level. The condition of erosion control devices must be checked after a rainfall event of _______ or more within a 24 hour period. - ANSWER-1/2 inch. A side yard easement of 15 feet means your building structure must be: - ANSWER-15 feet from the property line. You can identify survey monuments by the following - ANSWER-Who set the monument When was it set Where was it set Public _________ provide utilities access to run lines or pipes across or under your property. - ANSWER-Easements. A deposit of earth material placed by artificial means is called - ANSWER-Fill. Grading is changing the earth surface by either excavating or filling or a combination of both. T or F - ANSWER-True. The stage at which the grade approximately conforms to approved plans is called: - ANSWER-Rough grade.

100% correct answers 2024

Water wells should be located on the opposite side or uphill side of the house from the drainfield. T or F - ANSWER-True. When back filling around the foundation the soil should be compacted in __________ of 6 inches at a time. - ANSWER-Lifts. The ablility to achieve maximum density when compacting soil requires that the soil has it's optimum moistute content. T or F - ANSWER-True. The heavier the plates are on a vibratoty plate compactor the more compaction force it will generate. T or F - ANSWER-True. All soil types have the same optimum moisture content for compaction. - ANSWER-False. Plot plan and site plan. - ANSWER-Which drawing shows the shape and boundary lines of a lot, as well as locating the building, driveway, sidewalks, well and septic system, elevation contours, etc. Plot Plan Site plan Elevation plan Both A and B Proctor test Sand cone test

100% correct answers 2024

Nuclear density test - ANSWER-What is a method of determining soil density? Without adequate moisture or containing too much water. - ANSWER-It is virtually impossible to compact soil without adequate moisture containing too much water with optimum moisture content both A and B Point of reference or a benchmark. - ANSWER-A basic starting point from which measurements in building layout can be made using a transit or builders level is called a All of the above. - ANSWER-When building in a floodplain, special precaution must be made concerning: flood resistant construction. determining the design flood elevation. placing the lowest floor at the proper elevation. all of the above Parking vehicles , building access or storage. - ANSWER-When building in a floodplain, enclosed areas below the design flood elevation will be used solely for True. - ANSWER-Increasing the weight of the plates on vibratory plate compactors is the best way to increase their efficiency. T or F

100% correct answers 2024

True. - ANSWER-Rammers are the most efficient compactor to use in clay (cohesive) soils. T or F Avoid raising or lowering the grade around the trees Bore under the tree roots instead of trenching for Utility installations Barricade the area around the trees keeping heavy equipment off - ANSWER- Special precautions should be taken with desirable trees on a building site to avoid injuring and even killing them such as: True. - ANSWER-The optimum moisture content for soil compaction will depend on the type of soil being compacted. Moisture content. - ANSWER-Proper _______________ is the most important factor in efficient soil compaction. Shoring up the side walls. - ANSWER-Three methods of preparing an excavated hole to prevent cave-ins are: 1) providing the correct angle of repose for the specific soil type, 2) the benching method and 3)___________________________________. 5 feet. - ANSWER-If an excavation is more than _____________, an adequate protective system from cave-ins must be utilized. True. - ANSWER-Grading is changing the earth surface by either excavating or filling or a combination of both.

100% correct answers 2024

Removing vegetation, noncomplying fill and topsoil. - ANSWER-Before filling, the ground must be prepared to receive fill. An example of this would be: Final grade. - ANSWER-Site vision GPS systems are installed on bulldozers to help establish : Lifts. - ANSWER-When compacting soils, soils should be compacted in ____________________ of 6 inches. This will provide for proper compaction through all levels. Slope. - ANSWER-A ground surface inclination expressed as a ratio of horizontal distance to vertical distance is called Hand shovel. - ANSWER-How should the excavator remove excess soil from beneath a buried electrical line? Prevent evaporation. - ANSWER-There are two ways to insure proper curing of concrete: apply water to make up for water lost due to evaporation, and True. - ANSWER-When pouring concrete, the concrete should be placed near its required point. Excessive handling of the concrete weakens it. T or F Never acceptable. - ANSWER-Pouring concrete on frozen earth is: 1/2" - ANSWER-The diameter of a No. 4 deformed bar is:

100% correct answers 2024

All of the above. - ANSWER-Which of the following are true in regard to cold- weather construction? calcium chloride is added to concrete to help it set quickly. insulation of straw, hay, or polyethylene is placed around concrete footings. concrete block walls are usually laid with heated mortar. all of the above 1/4 the thickness. - ANSWER-When sawing a control joint in a concrete slab, the joint must be a minimum of how deep? Middle one third. - ANSWER-Rebar placement for a footing should be in the ________________________ of the footing depth. Chairs. - ANSWER-The most precise way of positioning rebar for a slab is to use: True. - ANSWER-Chairs are classified according to their degree of rust protection. Class #1 is the maximum protection, class #2 is moderate protection, and class #3 is no protection. T or F Curing. - ANSWER-Proper __________________ prevents most problems in the finished concrete. Methods used to ensure a high quality, finished product, include a sprayed on membrane curing compound, polyethylene sheets, waterproof paper or wet burlap. Slump cone. - ANSWER-A _________________ is a 12" high cone which determines the amount of water in the mix.

100% correct answers 2024

5% to 7% - ANSWER-In cases of severe cold weather exposure, the air content in a concrete mix should be about: Scale or spall. - ANSWER-If concrete is exposed to de-icers and it is not air entrained, it will: Scaling. - ANSWER-When concrete becomes flaky and fragmented on the surface, this is called: One quarter the space between side forms Three quarters the space between reinforcing bars One third the depth of the slab on ground - ANSWER-The maximum size aggregate is limited to the lesser of: 150 lbs. - ANSWER-How much does one cubic foot of concrete weigh? 28 days. - ANSWER-Concrete is considered to be fully cured or set after ______________days. True. - ANSWER-Air entrainment protects concrete from frost damage, but also makes concrete more workable. For that reason, not as much water is necessary for the mix. T or F Retarders. - ANSWER-On hot sunny days in the summertime, a contractor may decide to use ____________ to slow down the setting time of concrete. Cement, sand, water, and gravel. - ANSWER-Concrete is made by mixing:

100% correct answers 2024

Cause it to shrink more Weaken it Cause it to crack more - ANSWER-Adding too much water to a concrete mix will _______________ it. Screeding - ANSWER-_________________ concrete is the process of leveling the freshly poured concrete before it is floated. True - ANSWER-Floating of the freshly screeded concrete is accomplished with a wood or magnesium bullfloat which smoothes out, levels, compacts and brings the small particles to the surface for finishing. T or F Power trowel. - ANSWER-On large areas, it may be necessary to use a __________________ to finish the surface area. Non-slip surface. - ANSWER-On sidewalk surfaces, it is necessary to broom the surface of concrete to provide a: Cure. - ANSWER-It is necessary to maintain the temperature above 50 degrees in order for concrete to properly: 2" - ANSWER-Welded wire mesh should be placed ___________ from the top of concrete slab surface. Efflorescence. - ANSWER-The white salty powder that forms on the finished surface of concrete is called

100% correct answers 2024

Slab. - ANSWER-A concrete floor may also be called a: The top cures faster. - ANSWER-Concrete slabs on grade have a tendency to curl because: Power screed. - ANSWER-As concrete is placed in a form it needs to be leveled off. This can be done manually or mechanically with a Movement, expansion or contraction. - ANSWER-A control joint allows for what? To slow down the setting time of concrete. - ANSWER-What is the purpose of adding retarders to a concrete mixture? Water reducers. - ANSWER-What is added to make concrete more workable with less water? 10' - ANSWER-A one car driveway should have a minimum width of? 18' - ANSWER-A two car wide driveway is usually how wide? 3" - ANSWER-Where concrete is cast against and permanently exposed to the earth, reinforcement steel should be __________________ from the earth.

100% correct answers 2024

Increase the slump to the level specified in the mix design. - ANSWER-In most specifications, adding water to a batch of concrete is permitted only one time at the job site as long as the water/cement ratio is not exceeded. This would be done in order to: Lower the cement factor and increase the size of the aggregate. - ANSWER-A method to prevent cast concrete from excessive shrinking is to: Control random cracking. - ANSWER-Contraction joints, also known as control joints, in a slab are used to: Movement - ANSWER-Isolation joints isolate differing parts of a structure to permit independent: Construction joints. - ANSWER-________________________ are a convenient way to limit the size of the placement of concrete to a manageable volume and are a stopping place for a day's work. Base. - ANSWER-For a slab placed below grade, it is necessary to provide at least 4" of crushed gravel or stone. This should be compacted. It will prevent moisture from collecting under the slab. This 4" area is known as ________________________. At least 12 hours. - ANSWER-The timing for the removal of forms is important. The concrete has to achieve a strength great enough to support its own weight and the weight of any construction loads placed upon it. General guidelines for wall and column form removal is _________________________ after placement.

100% correct answers 2024

Rich concrete. - ANSWER-Concrete that has a lot of Portland cement in the mix may be referred to as: Improves ductility and reduces surface cracks. - ANSWER-What is the reason for using fiber reinforcement in concrete? Form release agent (oil). - ANSWER-What is used to prevent concrete from sticking to wood forms? Calcium chloride. - ANSWER-The most commonly used additive to help concrete set rapidly and more cohesively is: Tool for leveling concrete. - ANSWER-What is a screed? 90 minutes. - ANSWER-With the exception of special conditions, maximum delivery time between the water being mixed with the Portland cement in batching and the time of completion of discharge from a transit-mix truck is Prevent cracks from opening. - ANSWER-What is the sole purpose for welded wire fabric in a floor slab? True. - ANSWER-The reason for tying reinforcing bars with tie wire is to keep the rebar in place while pouring. It does not add any additional stength to the concrete. T or F Stay-in-place forms. - ANSWER-Concrete slabs poured above grade are often supported by ribbed or corrugated steel decking. These forms are called

100% correct answers 2024

False. - ANSWER-Rebar is placed in concrete mainly to improve its compression strength. T or F #16 gauge soft annealed. - ANSWER-What is the usual size of tie wire for rebar placement? Temperature reinforcement. - ANSWER-Reinforcing steel placed to resist the stresses due to shrinkage and weather changes is called 27 - ANSWER-Ready mix concrete is purchased by the cubic yard, which is how many cubic feet? The curing process. - ANSWER-The thermal process known as hydration refers to: Determining water mix in concrete. - ANSWER-A slump cone is a metal cone used for: Air entraining agents. - ANSWER-What admixture is used to improve the durability of concrete that is exposed to freezing and thawing? Reinforcing rod or welded wire. - ANSWER-Reinforced concrete is accomplished by adding: 1/4 inch. - ANSWER-The term "fine aggregate" refers to well-graded gravel up to:

100% correct answers 2024

Has more workability and is more watertight. - ANSWER-In comparison to regular concrete, air entrained concrete: Making concrete more durable in freeze/thaw conditions. - ANSWER-Air entrainment is used for what? Hydration - ANSWER-When water is added to Portland cement it causes the mass to harden. This reaction is called: Calcium chloride. - ANSWER-Accelerators speed up the curing process. Which of the following is an accelerator? True. - ANSWER-Concrete cures best in cool, damp environments. T or F Durability Surface soundness Reducing cracking - ANSWER-Besides ensuring the proper strength of concrete, proper curing of concrete also aids in: 12" R1003.2 Chimneys - ANSWER-What is the minimum thickness of concrete footings for fireplaces? 3 1/2" - ANSWER-What is the minimum thickness of concrete used for floors on grade?

100% correct answers 2024

Hot days and large pours with small crews - ANSWER-Retarders slow down the setting time of concrete allowing more time for finishing. This is especially useful on: True. - ANSWER-When pouring concrete directly on earth for exterior purposes such as driveways and side walks, if the base is dry it will tend to draw the moisture out of the concrete prematurely. It's a good idea to moisten the base prior to the pour, no puddles though. Concrete not being air entrained Overworking while finishing air entrained concrete Exposure to deicers within 30 days of the pour - ANSWER-Scaling of concrete is caused by? True. - ANSWER-Concrete with larger aggregate will need less air entrainment. T or F Sand and water. - ANSWER-When air entrainment is used the amount of _________ in the mix is reduced. T or F Cool damp conditions. - ANSWER-Concrete cures best in? Once. - ANSWER-Transit mix concrete allows for water to be added to the mix ________ at the jobsite. Hydrolic cement or epoxy injection. - ANSWER-To repair a crack in a concrete foundation wall use