Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Michigan Builders License Exam Study Guide 2024, Exams of Advanced Education

This comprehensive document serves as a study guide for the michigan builders license exam in 2024. It covers various topics related to the international residential code, including administrative procedures, permit requirements, code interpretations, and insulation requirements. The guide also includes questions and answers to help candidates prepare for the exam.

Typology: Exams

2023/2024

Available from 05/14/2024

studycamp
studycamp 🇺🇸

3.7

(23)

2.5K documents

1 / 17

Toggle sidebar

Related documents


Partial preview of the text

Download Michigan Builders License Exam Study Guide 2024 and more Exams Advanced Education in PDF only on Docsity! MICHIGAN BUILDERS LICENSE EXAM-with 100% verified solutions 2024 Tutor verified Created to serve as a complete, comprehensive code regulating the construction of single-family, two-family and buildings consisting of three or more townhouse units. IRC (International Residential Code) Administrative First 2 chapters of code book are True Plans or supporting documents are almost always required by the controlling authority prior to issuing a permit. T or F Yes Does the building official have the authority to render interpretations of the code? 8 foot fence. None of the following require a permit, EXCEPT: sidewalks and driveways tiling an 8 foot fence playground equipment False Tables and illustrations are always supported by information found in the written code and footnotes. T or F Live load. The amount of evenly distributed weight imposed by inhabitants, goods and removable objects on a floor or roof system is referred to as True. If a code requirement is in the book, it is both acceptable and enforceable by the code official. T or F Figures. Illustrations are typically referred to as Determine that buildings are built to the minimum enforceable standard. Generally speaking, the building official's job is to True. It is required that all manufacturer instructions be at the jobsite at the time of inspection. T or F Kitchen. All of the following are not considered habitable spaces EXCEPT: bathrooms kitchens storage spaces closets 3. ___________ can be used to satisfy U-factor and SHGC requirements. IC (Insulation Contact) Recessed lights must be _____ rated. True. Up to 15 square feet of glazing per dwelling unit is exempted from U-value requirements. T or F Registered design professional. The 2009 IECC requires a permanent certificate posted on the electrical distribution panel. The certificate shall be completed by the builder or State energy code requirements. One hurdle contractors face when bidding for an energy efficient project is choosing materials that fit the design, and also meet False. Historically significant buildings are not exempt from code changes. T or F R-value Settled thickness Manufacturer name Insulation products (blown and sprayed) must be documented with: March 2011. The new Michigan codes took effect in 10. Below grade walls are insulated from the top of the basement wall down to _____ below grade, or the basement floor, whichever is less. Area weighted average. The _______ is the combined Solar Heat Gain Coefficient of all the glazed fenestration products in the building. Thermal insulation R-values Design criteria Equipment systems Plans and specifications must be detailed in regards to: 2009. In Michigan, the residential energy code is based on the _____ IECC, with certain amendments. Air leakage. ___________ is the rate of air infiltration in the presence of a specific pressure differential. Windows Attic access hatches Recessed lights Air leakage is the random movement of air into and out of ________ through cracks and holes. Table 402.1.1 2009 IECC R-values for insulation and fenestration requirements by component can be found in International Energy Conservation Code IECC U-factor and UA alternatives. The _____________ compliance method allows for more innovative construction techniques like SIPs or Advanced Framing. 500 sq feet R-30 is permitted in vaulted ceilings, but is limited to True. If work requiring a permit is provided in an emergency situation, the permit application must be submitted within: True. If an inspection official is refused entry to a building project, the official will have recourse to the remedies provided by law which include securing a warrant from the court and returning with an officer of the law. No. IRC R104.8 Can a building official be held liable for any damage occurring to persons or property as a result of their actions or inaction? Yes. An owner needs a foundation wall repaired, it has seriously buckled due to excessive lateral loading from soil pressure. Does the contractor need to pull a permit? 6 ft. IRC R105.2 Although contractors should check for restrictive covenants and local zoning requirements, a permit isn't required from the building official for installing a fence not over _______ tall. 180 days. If a permit is applied for but not yet approved and the applicant is not persueing approval after______ days the application will be considered abandoned. Yes. Can a building official revoke a Certificate of Occupancy? True. When a project requiring a permit has commenced prior to the issuance of a permit, the building official is authorized to charge an additional fee. T or F 450 Foam plastic is used as insulation. The flame spread index cannot exceed 75 and the smoke development index cannot exceed 8". Foam plastic used for interior trim shall have a maximum thickness of 1/2" and a maximum width of 10%. Foam plastic interior trim must not constitute more than __________ of the total wall and ceiling area of any room or space. 1/2". Foam plastic used as insulation in walls must be separated by an approved thermal barrier. What is the minimum thickness of gypsum wall board being used as a thermal barrier for spray foam insulated walls? Framing. Which of these inspections happens last? Mechanical rough Plumbing rough Framing Electrical rough Yes. A retaining wall will be five feet tall from the bottom of the footing to the top of the wall. Do you need to pull a permit? At the time of inspection. Your building is utilizing engineered products such as engineered floor joists. When do the installation instructions need to be available at the work site? 1 3/8" solid wood 1 3/8" honeycomb core 20 minute fire rated Any of the above A door directly between a garage and a residence shall never open directly into a sleeping room. The door must also be True. A garden shed over 200 square feet will require a permit.code T or F Bulldozer. What tool would you use to peel back topsoil? Cutting into Piling soil over Compacting _________ the root system of a tree during construction can potentially kill it. Builders level. You would use a ________ to determine a floor is level, but this tool would not help determine if a wall is plumb. 1/2 inch. The condition of erosion control devices must be checked after a rainfall event of _______ or more within a 24 hour period. 15 feet from the property line. A side yard easement of 15 feet means your building structure must be: Who set the monument When was it set Where was it set You can identify survey monuments by the following Easements. Public _________ provide utilities access to run lines or pipes across or under your property. Fill. A deposit of earth material placed by artificial means is called True. Grading is changing the earth surface by either excavating or filling or a combination of both. T or F Rough grade. The stage at which the grade approximately conforms to approved plans is called: True. Water wells should be located on the opposite side or uphill side of the house from the drainfield. T or F Lifts. When back filling around the foundation the soil should be compacted in __________ of 6 inches at a time. True. The ablility to achieve maximum density when compacting soil requires that the soil has it's optimum moistute content. T or F True. The heavier the plates are on a vibratoty plate compactor the more compaction force it will generate. T or F False. All soil types have the same optimum moisture content for compaction.