Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

MSSC Maintenance Study Guide Exam with Answers, Exams of Mechanical Engineering

A study guide for the mssc (manufacturing skill standards council) maintenance exam. It covers a wide range of topics related to industrial maintenance, including safety, tools, equipment, procedures, and troubleshooting. The guide provides 49 multiple-choice questions with answers, covering areas such as hazard awareness, osha regulations, technical manuals, gear alignment, flammable materials, preventive maintenance, power tool safety, chain and bolt specifications, bearing failure, calibration, electrical circuits, pump cavitation, and vibration analysis. The comprehensive nature of the content and the focus on practical maintenance knowledge make this document a valuable resource for maintenance technicians, industrial mechanics, and anyone preparing for the mssc maintenance exam.

Typology: Exams

2024/2025

Available from 10/05/2024

Martin-Ray-1
Martin-Ray-1 🇺🇸

2.8K documents

1 / 7

Toggle sidebar

Related documents


Partial preview of the text

Download MSSC Maintenance Study Guide Exam with Answers and more Exams Mechanical Engineering in PDF only on Docsity!

MSSC Maintenance Study Guide Exam

with Answers Latest Edition.

  1. Every machine as potential hazards. When operating a lathe, you should be particularly aware of: - ✔✔. Wrap points
  2. Most work-place hazards and safety systems are regulated and enforced by: - ✔✔. OSHA
  3. The information provided in a technical manual generally includes all of the following except: - ✔✔. The cost of the equipment
  4. To achieve the best fit possible between mating gears, you should: - ✔✔. Use a fine lapping compound to make them fit
  5. Which of the following is an example of a flammable material?: - ✔✔. Gasoline
  6. Part of a preventive maintenance program is keeping accurate records. A maintenance log contains: - ✔✔Results of tests, results of inspections, the maintenance schedule
  1. During an alignment check between tow timing pulleys, have _________ to assure proper belt operation: - ✔✔. At least a three point contact.
  2. The proper oil level in a submerged oil ball bearing system is submerging: - ✔✔ One half the bottom ball of the bearing
  3. Before any tool or piece of equipment, you must receive training in its safe use. Tool and equipment training is provided by: - ✔✔ supervisor or experienced co-worker, the equipment manufacturer, an on-site or on-line training course
  4. A standard operating procedure (SOP) provided a complete set of instructions to perform a certain task in a written description of the procedure. Documentation of the procedure is recorded as directed by the SOP: - ✔✔On a route sheet, in a log book, on a computer
  5. The purpose of a power tool safety interlock is to: - ✔✔. Prevent operation of a tool unless certain conditions are met
  6. Which safety color is commonly used to indicate hazardous equipment or part on a machine?: - ✔✔. Orange
  1. Proper body mechanics are important. When pulling an object, all of the following guidelines should be observed EXCEPT: - ✔✔. Placing the work on your forearms.
  2. Which of the following is true regarding double pitch chains?: - ✔✔. The side plates have been extended to twice the normal pitch.
  3. Tap drill charts are based on ______ of threads?: - ✔✔. 75 Percent
  4. Which of the following tools is NOT a measuring tool?: - ✔✔. Adjustable Wrench
  5. What is/are the most common cause(s) of bearing failure?: - ✔✔. Both contamination and misalignment
  6. A "Grade 5" bolt has _______ slashes on its head?: - ✔✔. Three
  7. The pitch for a number 50 chain is: - ✔✔. 5/8 inches
  8. Of the following measuring instruments, the one capable of making the most precise linear measurements is the: - ✔✔. Micrometer
  1. Anyone in the plant should be able to find the right tool for the right job in: - ✔✔. 30 seconds
  2. The process of tool calibration against a standard is generally required for: - ✔✔. Any type of test equipment.
  3. Closeout of a Preventative Maintenance (PM) work order indicates that: - ✔✔. The maintenance was completed.
  4. Many machines have warning systems to alert workers to danger. A trip device is a system that: - ✔✔. Shuts off the machine when it detects a potential contact hazard.
  5. The absolute rating of a filter element refers to that element's ______ hole size. - ✔✔. Largest
  6. The purpose of a machine guard is to: - ✔✔. Protect workers from moving parts or other hazards.
  7. Fuses and circuit breakers shut off electrical power to a tool when the current load exceeds that maximum for that circuit. When this happens, the first thing workers should do is: - ✔✔. Identify and correct the reason for the overload.
  1. When lubricating a bearing, you should avoid: - ✔✔. Getting dirt in a bearing.
  2. A maintenance program which focuses on cooperation between operators and maintenance specialists, is known as: - ✔✔. Total Productive Maintenance (TPM)
  3. If only one shaft can be turned when checking for out of round: - ✔✔. Mount the indicator first on the one that cannot be turned
  4. The meter shown is connected in the circuit so that it measures: - ✔✔. In parallel with a live circuit
  5. Which of the below is most likely to result in a shock from an electrical device?: - ✔✔. Improper grounding of the circuit
  6. The most obvious indicator that a v-belt pulley is worn beyond usefulness is when: - ✔✔. A new belt touches the bottom of the groove
  7. The first step to ensure proper alignment of motors with mating equipment is to: - ✔✔. Check shaft run out
  1. Regular, recurring, trouble on the same repair order should result in: - ✔✔. A thorough check for a history of similar problems
  2. A dial indicator should ______ during adjustment of the motor position: - ✔✔. Be removed
  3. The below is an example of ________ control logic: - ✔✔. Or
  4. The part of an electrical circuit that gives the operator control is the: - ✔✔. Input device
  5. The primary cause of pump cavitation is: - ✔✔. Suction line pressure is too low
  6. When converting gauge pressure to absolute pressure, you must:
    • ✔✔. Add atmospheric pressure to gauge pressure
  7. Daily maintenance involves keeping daily records because: - ✔✔. Recurring events can be analyzed to troubleshoot problems
  8. Which of the below is a goal of Total Productive Maintenance (TPM): - ✔✔. Zero breakdowns and defects
  1. A chain should be replaced when its length becomes _________ longer than the original length?: - ✔✔. 3%
  2. A maintenance technician must _______ prior to shutting down a machine for preventive maintenance: - ✔✔. Arrange for ready access of routine tools and supplies
  3. Making sure that a motor shaft is level on the mounting surface: - ✔✔. Reduces the number of needed shims
  4. _____________ Is the most common maintenance problem with vibration on air fans: - ✔✔. Sediment/product buildup
  5. In the below drawing, pulley "A" is rotating: - ✔✔. CW at 25 rpm
  6. Based on the sling configurations in the table below, what loads can be safely lifted using a 1,500 lb wire rope?: - ✔✔D. A,B,C, & D
  7. The _____________ test will show cracks in the surface of ferrous metal: - ✔✔. Magnaflux