Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A collection of exam questions and answers related to the nascla contractors guide to business, law, and project management. It covers various aspects of construction, including labor laws, safety regulations, project management, and building codes. The questions and answers are designed to help contractors prepare for licensing exams and enhance their knowledge of construction practices.
Typology: Exams
1 / 10
A business must meet the requirement of the Fair Labor Standards Act when there are more than how many employees? - ANSWER - What is the primary purpose of ventilating unconditioned spaces? - ANSWER -to control moisture Oxygen cylinders shall be stored where? - ANSWER -separate from fuel gas cylinders by a minimum of 20' Which of the following is included in a company's general overhead costs? - ANSWER -the company's administrative expenses What size diameter anchor bolts should open web joists have at each end? - ANSWER -2 1/2" When should duplex nails be used? - ANSWER -when building concrete forms Where would the contractor find details fo wall penetrations that are to be constructed as a part of the project? - ANSWER -technical specifications Trades that typically have the most stringent and specialized coordination requirement for project closeout are: - ANSWER -mechanical and electrical When forming waffle slabs in a multi-story building which of the following should be used? - ANSWER - pan forms Fiber glass insulation batts are being installed in an attic. Where should the vapor barrier be installed? - ANSWER -under the insulation
A crane is operating near overhead power lines rate less than 50 kV. What is the required minimum distance? - ANSWER -10' It is allowable to excavate how far below a trench box? - ANSWER -2 feet When storing steel joist at a job site they should be: - ANSWER -vertical, laid flat, or as shipped An installed truss has a 20' span and a depth of 6'. What is the maximum amount it can be out of plumb?
Egress doors must open to the direction of travel when the occupant load is more than: - ANSWER - persons Wallboard inspections must be made when? - ANSWER -before the joints are taped Which if the following would be an acceptable condition for a contractor to refuse to perform work on a project and not be a breach of contract? - ANSWER -a site condition that prohibits the subcontractor from the performing the work What method of disbursement account would be the most appropriate for a large construction company? - ANSWER -Establish a separate journal for disbursement and payroll Who is responsible for the maintenance of personal protective equipment when employees provide their own? - ANSWER -employer According to OSHA a radiant type temporary room heater used in a confined space must have how much clearance from the side and rear of the space? - ANSWER -36" An owner will require documentation that provides information as to how the project was actually constructed. Which of the following is provided by the contractor for this purpose? - ANSWER -as built drawings Who has the authority to change or adjust a shoring method of an excavation? - ANSWER -engineer Which of the following is done by the post-tensioning contractor prior to pouring concrete? - ANSWER - the tendons are encased in high-density polyethylene sheathing with a PT coating When installing 1/2" gypsum parallel to the framing members on the ceiling what is the maximum spacing of the framing members? - ANSWER -24" on center What is the diameter of #5 rebar? - ANSWER -5/8"
What is the minimum length of time required for wood flooring to be stored int he building to allow for climate acclimation? - ANSWER -4-5 days Which type of masonry joint finish is the most effective at preventing damage from freezing? - ANSWER -concave When constructing a light weight curtain wall what shall be between the building insulation and the external panels? - ANSWER -air gap Which one of th following has the greatest impact on determining how to safely manage traffic control at a. job site? - ANSWER -site layout A project Schedule of Values shows Task A worth $12,000, Task B worth $8,500, and Task C worth $25,000. Task A is 18% complete, Task B is 2% complete, and Task C is 7% complete. How much should the progress payment be? - ANSWER -$4, Guard rails and personal fall arrest systems shall be prove when ever platforms and walkways cannot feasibly be how wide? - ANSWER -18" What screw size is to be used to fasten metal decking? - ANSWER -Number 12's or 1/4" diameter A surveying benchmark is at 88.6 feet. There is a reference stake set 7.8 feet lower than the benchmark. If a ditch is to be excavated to a depth of 8.75 feet below the reference stake and 20 feet from the reference stake, what is the finished elevation of the bottom of the ditch? - ANSWER -72.05 feet If an employer has 8 employees which of the follow is required by OSHA when the business is moved into a new facility? - ANSWER -the employer must orally review all emergency procedures What effect will freezing temps have while curing concrete? - ANSWER -a longer time is needed According to OSHA, who has the responsibility to insure compliance to the standards and determine what safety equipment is required? - ANSWER -employer
When may compressed air be used to clean dust from equipment? - ANSWER -Only when the pressure is reduced to 30 psi or less and PPE is provided Which documents are primarily used by the contractor and architect to monitor quality? - ANSWER - submittals, shop drawings, and samples In order to protect the owner and contractor from lien filings, what document is provided by a subcontractor in exchange for final payment? - ANSWER -unconditional lien release What does a lien waiver release the owner from? - ANSWER -paying too much for services or materials A renovation project is to begin on a pre-1978 housing project. It will require the more than 2 sq. ft. of painting surface be removed or disturbs. What should the contractor do prior to beginning? - ANSWER - Distribute an EPA pamphlet entitled 'Protect Your Family from Lead in Your Home" to the property owner or adult occupant Which of the following is not a concern for a precast concrete contractor during a pre construction meeting? - ANSWER -maintaining anticipated overhead and profit margins The International Building Code states that the minimum thickness of plywood species Group I that may be used for subfloor joist spaced 16" on center is: - ANSWER -1/2" When a contract requires the contractor to indemnify the owner for any liability the owner may incur under her should: - ANSWER -have the contract reviewed by an attorney When concrete is cured properly what is included? - ANSWER -controlled drying A Proctor test is used to provide a contractor with what information? - ANSWER -soil compaction value What is considered project overhead? - ANSWER -temporary job site office
When unloading trusses what should a builder do? - ANSWER -unload as close as possible to the building site What is not appropriate eye protection for employees who wear spectacles with corrective lenses? - ANSWER -corrective spectacles only When an internal combustion engine is used indoors what must be done? - ANSWER -exhaust gases must be vented What is true regarding elevator floor control buttons? - ANSWER -must be arranged in a standard telephone pattern If an incident results in the death of a worker, what is the maximum amount of time it must be reported to OSHA? - ANSWER -8 hours What is the maximum installation interval that foundation plates or sills should be installed? - ANSWER - 6' What is the most efficient method to move material a short distance downgrade? - ANSWER -slot dozing What materials is best to fireproof steel beams and columns? - ANSWER -cellular concrete Which masonry mortar type is used to achieve a high early strength? - ANSWER -Type III For a contracting company there is a debt that has been carried for the past 3 years and is due to be paid off by the company. Where on the balance sheet should this be reflected? - ANSWER -current liabilities Which gauge of metal stud is the most cost efficient to be used in non-load bearing partitions? - ANSWER - What is the suggested angle of repose for shoring compacted sharp sand? - ANSWER -1 1/2:
A deck is required to have a guard rail when? - ANSWER -when it is more than 30" above grade A job requiring excavating was initially calculated to allow for a 10% swell factor for the soil. However during excavation it was found that the soil had a 25% actual swell factor. What effect will this have on the overall project? - ANSWER -will require more hauling and decrease in efficiency A non-sliding egress door of a group R3 occupancy building shall have a maximum threshold height of? - ANSWER -1/2" A parking lot with 30 spaces shall have a minimum of how many handicapped spaces? - ANSWER - Which formula describes a balance sheet? - ANSWER -assets = liabilities + owner's equity For a worker in a trench what is the maximum lateral distance from a means of egress? - ANSWER -25' What is not required to be provided by an employer on a job site? - ANSWER -a defibrillator What documents are required from the contractor before a final release of money? - ANSWER -affidavit of payment What procedure according to OSHA should be used by above ground personnel to best determine the number of people working underground during construction? - ANSWER -check-in/check-out A single with brick wall is 200 sq. ft. with 3/8" mortar joints, and 655 non-modular bricks per sq. ft. How many cubic feet of mortar is required? - ANSWER -11. A project contract is written for a lump sum of $200,000. The retainage for this project is 10%. The contractor has completed 90% of the project and has received all progress payments. The contractor submits a request for final payment. What should the final payment amount be? - ANSWER -between $35,000 and $40,
If a building is constructed using green procedures or guidelines, how much less energy will be required to operate it? - ANSWER -30-36% If a hotel is constructed with 20 sleeping room what is the minimum number of visible fire alarm notification devices? - ANSWER - What minimum thickness of compacted granular material is to be used as the base of a concrete curb? - ANSWER -6" A ceiling joist end may be notched a maximum of how much? - ANSWER -1/4 the joist depth A contractor should select subcontractors based on the subcontractor's: - ANSWER -ability to provide the most value to the project The effect of vibratory action on a concrete mix does what? - ANSWER -permits the use of a stiffer mixture containing larger portions of course aggregate 36 cubic yards of earth are removed from a hole and now occupies 45 cubic yards. What is the percent of swell for this dirt? - ANSWER -25% If a contract cannot be interpreted which of the following is true? - ANSWER -It is interpreted against the party who wrote it Provisions of construction document should show any requirement fo special reporting and documenting of construction activities for archaeological sensitive areas of a job site. Which provision should show this information? - ANSWER -supplementary conditions What is true regarding the elevator call buttons located in a lobby? - ANSWER -shall be raised or flush During a project the owner makes a change that would cost the contractor $2,500 in labor and materials and $700 in overhead costs. With this change the contractor will save $1,000 in labor costs and $280 in overhead costs. The original bid included a profit of 10% of all costs. If the contractor requires 10% of all costs for the changes, the change order should include an additional how much? - ANSWER -$2,
What is not a source of grey water? - ANSWER -kitchen sink What is the recommended length of tail to leave outside the edge form at each end after stressing the tendon? - ANSWER -12" which pile is used for horizontal loads? - ANSWER -sheet pile During project closeout the test and tolerance information should also include what? - ANSWER - method of testing What is the minimum clearance from the pull side of an accessible manual swinging door when approached from the front parallel to the doorway? - ANSWER -18" Consider the scenario: A benchmark has been established for building. The finished floor elevation is one foot above the benchmark. What will be the elevation of the bottom of a 4" concrete slab? - ANSWER -.667' What is a requirement in the specification to record as-built information that will be given to the owner at substantial completion? - ANSWER -project photos Bagged materials stored on a jobsite shall be stacked, by: - ANSWER -stepping back the layers and cross- keying the bags at least every ten gas high A contractor should account for added security of a project site by applying which methods? - ANSWER - utilizing locked trailers for small tools and materials, installing fencing for enclosing the perimeter of a site, installing cameras at. the jobsite For a front loading washing machine, what is the maximum allowable offset from the center of the door opening to establish clear floor space? - ANSWER -24" Where a roof meets a vertical wall which is the best method to follow? - ANSWER -install metal flashing under the shingles and siding
What is used to attach formed metal gutters to the building fascia? - ANSWER -wrap around hangers Which is the most accurate regarding a brick veneer wall? - ANSWER -the veneer carries its own weight What is considered a significant factor in determining how precast mortals should be delivered to job site? - ANSWER -whether the erector has the capability of rotating pieces How would a contractor determine which sealant to use in a particular application? - ANSWER -refer to the technical specs What is true regarding oily rags and flammable waste? - ANSWER -they should be stored in a covered container A construction delivery type that would have the contractor as an agent to the owner providing pre construction services without construction responsibilities would be? - ANSWER -CM at risk The maximum height of the top of gripping surfaces on handrails above stair nosing, ramp surfaces, and walking surfaces is what? - ANSWER -42" A performance management system should include management of performance standards and the creation of what? - ANSWER -an employee appraisal system What method is based on the actual costs? - ANSWER -cost plus What is not a manual soil test? - ANSWER -slump test