Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A comprehensive set of questions and answers related to the nccco core exam for crane operators. It covers essential topics such as crane safety, load charts, boom angles, rigging, and powerline clearance. Designed to help individuals prepare for the nccco core exam and enhance their understanding of safe crane operation practices.
Typology: Exams
1 / 37
If taking sides strain on a boom what concerns the
operator
the most A- NSWER >>>>Boom
damage
If a crane load chart has capacities listed in the
shaded area
this means thatA - N SWER >>>>If overloaded
structural
confidence will be compromised
As the layers of rope on a drum increase the
allowable line
Pull wil - ANSWER
Decrease
Of the following actions which one will most likely
cause a
side load conditionA - N SWER>>>>Abruptly
starting or stopping the swing
Cording to OSHA with any hook ball or
attachment at its lowest point a minimum of
blankdrum atreps al l musttime s -AremainNSWER on the
What is the minimum distance of crane must
maintain from
powerlines rated below 50 KVAN - S WER >>>>
feet
What is the best procedures to follow if underground
utilities
are present A- NSWER >>>>Contact utility
company
For boom is reeves eccentrically to the block
thecommon most result would beAN - S WER >>>>Twisting of
the boom
P a g e 1 |
37
What is the safety factor for 6 x 19 IWRC wire
rope -
What is the safety factor for rotation resistor
wire rope -
What is the safety factor for rigging ANSWER
hardware -
What is the safety factor one hoisting personnel
using IWRC
wire Rope - ANSWER
What is the safety factor hoisting personnel using
rotation
resistance wire rope -ANSWER
Unless the manufacturer states otherwise the wind
speedseize hoisting to Shall beA - N SWER >>>>
mph
When hoisting personnel OSHA requires wind speed
not to
exceed - ANS WER>>>>
mph
Who has the responsibility of determining the
correct weight
of the load ANSW- ER
Supervisor
When an operator leave there a crane they
must -
Land load engage all locks and Pawls and lock
machine
When is it safe to work closer than alarm for distance
from
any powerline ANSW - ER>>>>When the utility
company
certifies that the lines are D energized
When operating a crawler crane what is the most
unstable
allowable quadrant of operationAN S-WER
Side
P a g e 2 |
37
three broken wires and one strand of one lay
length
When arriving first on the job site the operator
should first
determine the condition of the - >>>>Access
roads
Basket hitch is rated of a vertical hitch ANSW - ER
How many broken wires must be present in one
strand of one lay for running wire rope to be
removedANSWER >from>> service -
How many broken wires must be present in rotation
resistant
wire rope to be removed from service - >>>>2 in
six diameters
What is the minimum clearance needed between
cranescounterweight and any obstacleAN S- WER >>>>
feet
To restrict access to a crane swing radius the
operator must -
ANSWER >>>>Barricade the area around the
crane
You should always have at least how many wraps on
A hoist
drum - ANSWER
When working around powerlines you
must -
Never stockpile material under
powerlines Maintain the correct distance
according to the rated KV Ground the crane
with the proper grounding cable
Boom angle is best described as AN - SW ER>>>>The
angle
between the loaded boom and the
horizontal
P a g e 4 | 37
What is the best procedure to follow when
underground
utilities may be present - >>>>Contact local
utility company
When using cable or nylon spreaders it is
important toremember A- NSWER>>>>The lower the spreader
angle the
greater the tension
When is spinning load presents a danger the
operator should
tagline
Parts of line
means -
ANSWER >>>>The number of
lines
running through the load block
A sudden start or stop while operating a crane
produces -
ANSWER >>>>A dynamic
load
What percent of a cranes rated capacity is it
classified as a
critical lift A-NSWER
During disassembly of a long boom the hog lines are
connected on a maximum cantilever point and the
boom is slightly lifted off the ground which pins are to
be removed next
cantilever
point
If you were to make a left using a four legged bridle
how many
legs are you going to calculate the loadANS - WER
According to OSHA all cranes equipped with a luffing
jib must
have - ANSW ER>>>>Check
valve
P a g e 5 | 37
Controls for operating a superstructure mounted
power plant
shall include all of the following
except -
Means to shut off two cycle diesel engines in
emergency
Forces on a cranes hand lever Shall not
exceed -
35 lbs
Forces on a cranes Foot pedal shall not
exceed -
50 pounds
The travel distance on a cranes two way lever
must not
exceed from the neutral positionAN SW- ER >>>>
inches
The travel distance on a cranes one-way lever
mustexceed not from the neutral positionAN SW- ER >>>>
inches
Frequent inspection occurs ANSW - ER >>>>Every
shift
Frequent inspection should be
performed by -
Competent person
Periodic inspection occurs -
Weekly to monthly
When using single saddle or U bolt type clips the
saddle shall
NEVER be installed onA - N SWER >>>>The live
end
The pitch diameters for boom hoist sheaves shall not
exceed -
Pitch diameter load hoist sheave shall not ANSWER
exceed -
P a g e 7 | 37
Pitch diameters for load block sheaves shall not
exceed -
Prior to leaving a crane unattended the
operator shall -
ANSWER >>>>Land load or
attachment
Disengage master clutch
Turn off engine secure from
authorized use
Before lifting a rated load the operator
shall -
Left the load a few inches off the ground and
apply the brake
When performing a pic with a truck crane on
outriggers the
tires must beANSW - ER >>>>High enough to relieve
themthe cranes of weight
When blocking on the outrigger float the cribbing
Shall be -
ANSWER >>>>Sufficient to support the crane and
its load
When a crane is being used to lift personnel and
inspection of
the crane should be madeANSW - ER
Frequently
When using audible signal is one signal would
indicateANSWER - >>>>St
op
Two audible
signals -
ANSWER >>>>Go
ahead
Three audible signals ANSW - ER >>>>Go
back
A crane must stay at least from energize powerlines
underAN 50 SWER
Kv - >>>>
feet
P a g e 8 | 37
0
Over 50 to 200
kV -
Over 200 to 350
Over 350 to
Over 500 to 750
Over 750 to 1000Kv A - NSWER
If operating a crane in proximity of power lines over
what is the minimum clearance -
Determined by the utility company
During hoisting operations in proximity of
powerlineslines and rigging all tag should be ANS - WER
Synthetic
Powerlines or presumed energized
unless -
The utility companies certifies the lines are D
energized and they are visibly grounded
Up to. 75 kv A-NSWER
Over. 75 to 50 Kv A - NSWER
Over 50 Kv to 345 Kv ANS - WER
Over 345 kvvolts to 750 kV AN - S WER >>>>
feet
750 kV to 1000 kV - >>>>
feet
P a g e 10 |
37
1
What type of inspection requires no
documentation -
hift
During what inspection classification does
inspection of
ground conditions take placeANSW - ER
Shift
I frequent inspection is made -
Weekly to monthly
A periodic inspection is made ANSW - ER
Monthly to annually
A shift inspection must be completed -
Before the end of shift
What inspection classification requires disassembly of
aas necessary crane ANSW- ER
Annual/comprehensive
Equipment idle for more than three months must
have an inspection performed in accordance with
classificationANSWER >>>>Mont -
hly
Documentation of the annual/comprehensive
inspectionbe retained must for a minimum ANSWof - ER >>>>One
year
Hooks with locks and latches must be used
except when setting wooden trusses in such
situationANSWER can>>>>J be used -
hook
When is used to have a crane to hoist personal
permittedANSWER -
When there is no other
Safeway
P a g e 11 |
37
3
Hooks must be discarded if a twist of more than what
is found
When performing duty cycle work the rule of
thumb is to -
ANSWER >>>>Use 80% of the manufacturers
load chart
When assembling a lattice boom crane in what order
shouldboom sections be installedAN - SWER >>>>Shortest
closest to boom base
When extending bloom sections on a hydraulic
crane you
should - A NSWER >>>>Extend all the sections
equally
When assembling a lattice boom on a truck crane
the outriggers must be fully extended and the
boom placed -
ANSWER >>>>Over the quadrant of maximum
stability
When handling boom sections what type of sling is
preferred -
ANSWER >>>>Synth
etic
The distance it takes a strand to make a complete
revolution
around its core is referred to asAN - S WER >>>>Lay
length
How many random broken wires must be present for
running
route to be removed from service - >>>>Six In
one lay
How many broken wires and one strand of one lay
must be
present for removalANS - WER
Three
What is the minimum number of broken wires must be
present
and standing rope to warrant ANSWER
removal -
Two////One is allowed
P a g e 13 |
37
4
How many broken wires are permitted at and end
connection
of a pendant line -ANSWER
How many broken wires present in rotation resistant
wire rope
warrant removalA - N SWER >>>>Two in six
diameters
What is the safety factor for running
rope -
What is the safety factor for rigging ANS - WER
What is the safety factor for rotation resistant
wire rope -
In order of hitch strength goes as ANSWER
follows -
Basket vertical choker
Can a crane's roof serve as a workstation for
rigging or
assembly/disassembly or maintenanceANS - WER
Only
if it has the capability of supporting 250 pounds
A load applied at an angle to the vertical plane of the
boom is
referred to as ANSW- ER >>>>Side load///// when
you pick
some thing not being directly over the Center of the
load
The drum flange shall not extend a minimum of what
from the
top layer of rope - AN SWER>>>>Half an
inch
Boom hoist sheaves shall have a minimum pitch
diameter of -
ANSWER >>>>15 times rope
diameter
P a g e 14 |
37
6
Load rating charts are based on a percentage of
the loads which produce a tipping condition and
the least stable
direction the percentage is watt for a truck ANSWER
crane -
A standard hand signal chart must be posted
conspicuously at
the job site the ideal spot for the chart is -
On the crane
If the crane manufacturer does not specify what
order and
which boom sections are to be
assembled -
Smallest sections are closer to the
boom base
Boom connecting pins should be ANSWER
installed -
From the inside out
Personal hoisting by a crane is permitted
when -
No other safe means are available
Cranes lifting personal platforms must ANSWER
have -
Anti-two block
What is not permitted to be in an occupied
personnelANSWER >>>>Construction hoist -
materials
Tools and materials in an occupied personnel
basket -
ANSWER >>>>Must be
secured
When rigging personal platforms using a wire rope
bridal -
ANSWER >>>>A link must be used to ensure the
load is
divided
evenly
P a g e 16 |
37
7
Bridals and rigging used for personal
hoisting -
Can only be used for personal
hoistingThe ground pressure under outriggers is higher than
it is under a crawler track because of a smaller
bearingANSWER surface >>>>Tr -
ue
Deflection of the boom and pendant stretch will
increase -
ANSWER >>>>Load
radius
Within what percentage of level does a telescopic
boom crane have to be for the gross ratings in the
load chart to remain
valid - ANSWER
The load line of the crane you're operating comes into
contact with an energize powerlines there's no sign
of any other dangers such as fire and such situation
you should -
ANSWER >>>>Stay in the cab until the lines are D
energized
Unless the operator takes a count of boom
deflection when
lifted off the ground a properly rigged
load may -
Swingout away from the crane
According to be 30.5 mobile crane standard it's OK
for an operator to leave the cab of a crane with the
engineso long runningas AN- SWER >>>>The operator keeps the
crane in
view and restricts access to the area around the
crane
Unless the manufacturer states otherwise truck
cranes
generally have no lifting capacity over
which area -
front
P a g e 17 |
37
9
When setting a crane up on outriggers the
wheels of the
crane should ANSW- ER >>>>be just high enough
off the
ground to relieve the tires of crane
weight
On pick and carry operations you
should -
Keep the boom as short as
possibleOn a crawler crane ground bearing pressure is
greatest -
ANSWER >>>>Over the
corner
When preparing to hoist a light load the hook
should be
positioned ANSW- ER>>>>Directly above the loads
center of gravity
It's OK to temporary bypass a cranes overload
warning
system -A NSWER >>>>During
assembly/disassembly
operations
On a crawler crane the part of the low charge
governed by stability is based on what percentage
of its capacity -
When the boom length of the crane falls between the
lengths listed in the load chart you should use the
next capacity listed
for - A NSWER>>>>The next longest boom
length
A Jibbs offset is the Jibbs angle to the AN - SWER
Boom
All hazards and potential problems should be
discovered -
ANSWER >>>>Pre-operational work site
inspection
What was the result of boom ANSWER
deflection be -
Increased Boom radius
P a g e 19 |
37
0
When a crane is out of level by 1° it will lose the most
capacity
at what configuration - >>>>Long boom
minimum radius
What is the purpose of using a spreader ANSWER
beam -
Support long hard to control loads
Which of the following actions is most likely to
cause two
blocking -AN SWER >>>>Telescoping the
boom out
When is it safe to handle loads under
powerlines -
The load know where any part of the crane
can come closer than regulations allow
When working your power lines tag lines and slings
should be
constructed ofANSW - ER>>>>Probably
propylenepolyethylene or and webbing because they offer a fair
insulating properties
When reading a load chart the listed capacity has an
Asterix
next to it this meansANSW - ER >>>>The
capacities are
based on the cranes structural
competence
Pick can be made with the intermediate
outriggers -
If there is a load chart for intermediate
Outrigger work
The main boom angle minus the gym offset would
equal -
ANSWER >>>>Jib angle to the
ground
You can use the range diagram to
determine the -
Radius of unloaded boom
P a g e 20 |