Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A series of questions and answers related to nccco mobile crane inspections. It covers various aspects of crane operation, maintenance, and safety, including boom angle indicators, load testing, and periodic inspections. Useful for individuals preparing for nccco certification exams or those seeking to enhance their knowledge of crane safety practices.
Typology: Exams
1 / 4
How does the operator verify the LMI's boom length or load radius reading? - ANSWER Actual measurements On whose recommendations should a preventive maintenance program be set-up? - ANSWER Crane manufacturer The proper way to calibrate a boom angle indicator is; - ANSWER Using a level, raise the boom to horizontal and set the indicator at 0 degree
D. All of above - ANSWER D. all of the above A frequent inspection is defined as - ANSWER Daily to monthly Load test for cranes should not exceed_____________% of the manufacturer's rating. - ANSWER 110% B30.5 requires load indicator on cranes when it's maximum capacity exceeds; - ANSWER 3 tons and above Which statement best describes how OSHA 1926.1400 looks at a crane manufacturer's instructions, specifications, and limitations? - ANSWER They must be followed exactly as law Where does OSHA 1926.1400 require hand signals to be posted? - ANSWER On the equipment or conspicuously posted in the vicinity of the hoisting operations According to OSHA 1910.180 are cranes allowed to be overloaded? - ANSWER Yes, but only during testing and not over 110% of rated capacity
Excessive side loading of booms by freely suspended load is caused by; - ANSWER Starting or stopping the swing to rapidly When telescoping the boom section of an R/T, which section should be telescoped first? - ANSWER All sections should be telescoped equally When should the operator use the seat of his pants technique; - ANSWER Never Is the load applied to the crane when determining the loaded boom angle? - ANSWER Yes How do outriggers increase the tipping capacity of a crane? - ANSWER By moving the tipping axis farther away from the center of gravity of the crane How often must periodic inspections be conducted? - ANSWER Monthly to annually How often must periodic inspections be conducted? – ANSWER When push the far left hand control lever forward the crane action will be; - ANSWER Swing toward the boom
What is the maximum amount of twist allowed in a hook? - ANSWER 0 degrees in plane of hook What is the maximum amount a hook throat can open up? - ANSWER 5% According to OSHA 1926.1400 who can do annual inspections? - ANSWER Qualified person According to ASME B30.5 an operator aid (such as ATB, LMI) shall be inspected and tested at least once every________ by a qualified person. - ANSWER 12 months What is the difference between an anti-two-block warning device and an anti-two-block prevention system? - ANSWER Warning device only warns, but prevention system will stop the operation The primary purpose for a rooster or Auxiliary boom point is to; - ANSWER Separate the hoist lines When the number of layers of rope on a drum increases the; - ANSWER Line pull decreases