Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NCCCO Questions Test 1 Latest Update 2024-2025 50 Questions and 100% Verified Accurate A, Exams of Business Administration

NCCCO Questions Test 1 Latest Update 2024-2025 50 Questions and 100% Verified Accurate Answers

Typology: Exams

2023/2024

Available from 08/31/2024

Wanjiruesther
Wanjiruesther 🇰🇪

5

(2)

563 documents

1 / 5

Toggle sidebar

Related documents


Partial preview of the text

Download NCCCO Questions Test 1 Latest Update 2024-2025 50 Questions and 100% Verified Accurate A and more Exams Business Administration in PDF only on Docsity! NCCCO Questions Test 1 Latest Update 2024-2025 50 Questions and 100% Verified Accurate Answers Where is the best location for leveling a crane? Upperworks When determining the "gross load" the best method is: Get an accurate load weight and add the rigging. By order of hitch strength, which is the correct answer? Basket, vertical, choker What is the purpose of using a jib? Increase height When taking a side strain on a boom, what concerns the operator most? Boom damage You should always have at least how many wraps on a hoist drum? 2 On a load chart, values above the bold line mean: Capacities based on structural competence. The primary purpose for a rooster sheave or Auxiliary boom point is to: Separate the hoist lines. What is the proper procedure when using an insulating link or a boot near power lines? Be sure to maintain the correct allowable distance from the lines. When the number of layers of rope on a drum increases, the: Allowable line pull decreases. What is the minimum allowable distance from the crane and power lines under 50kV? 10 ft. The term "Upperworks or Superstructure" refer to the area of the crane: Above the turntable Side loading may be caused by: Starting or stopping the swing too rapidly. What is the best procedure to follow when underground utilities may be present? Contact local utility company Eccentric main boom tip reeving causes: Twisting of the boom How many randomly broken wires must there be to remove a running wire rope from service? 6 When lifting personnel in a man-basket using 6x19 wire rope, the minimum safety factor is? 7 What is the safety factor required when using non rotating wire rope and lifting personnel in a man- basket? 10 Who has the responsibility for determining the correct weight of a load? Supervisor