Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NCCCO Signal Person Certification Exam 2024-2025, Exams of Construction

A comprehensive overview of the nccco (national commission for the certification of crane operators) signal person certification exam for the years 2024-2025. It covers a wide range of questions and correct answers related to osha regulations, asme standards, and best practices for crane operations, particularly when working near energized power lines and lifting personnel platforms. The document delves into topics such as minimum clearance requirements, wind speed limitations, communication protocols, hand signals, and safety considerations. This resource would be invaluable for individuals preparing for the nccco signal person certification exam, as it provides a comprehensive overview of the key knowledge and skills required to pass the exam and ensure safe crane operations.

Typology: Exams

2024/2025

Available from 10/14/2024

zaza-maica
zaza-maica 🇬🇧

759 documents

1 / 7

Toggle sidebar

Related documents


Partial preview of the text

Download NCCCO Signal Person Certification Exam 2024-2025 and more Exams Construction in PDF only on Docsity! Nccco Signal Person Test 2024-2025. Questions & Correct Answers. Graded A+ 10 - ANSaccording to osha 1926.1411 when the crane is in transit and the power lines you are to go under are rated at 300kv what minimum clearance must you maintain 10 feet - ANSaccording to 1926.1408 when operating near a high voltage power lines what clearance shall be required when the rating of the lines are 33kv 10 feet w/encroachment precautions - ANSaccording to osha 1926.1408 for power lines rated 100kv the minimum clearance between the crane and any lines shall be 10 feet w/encroachment precautions - ANSaccording to osha 1926.1408 the minimum clearance between any part of the crane and power lines rated 50kv or below shall be 100 percent - ANSinside the personnel platform except for gates how much of the perimeter must contain a grab rail for the occupants 1926.1431 - ANSwhich osha section refers to housing personnel 20 feet - ANSaccording to 1926.1408 when operating near a high voltage power lines what clearance shall be required when the rating of the lines are 275kv 20 mph - ANSwhat is the maximum wind speed allowed during suspended personnel platform operations 6 - ANSosha 1926.1411 when you encounter power lines with a voltage of 44kv and the crane is in transit you must keep a minimum clearance of how many feet a 100 ton crane can pick up 100 tons when the boom is at - ANSmaximum boom height, minimum boom length all of the above - ANSwhich osha section refers to working near energized power lines anti two block - ANSaccording to osha 1926.1431 when signaling a crane that is lifting a personnel platform which device listed below must be attached to the crane asj the lift director for their determination - ANSif wind speeds are recorded at 22 mph in a personnel hoisting operation what should you do asme b30.3 - ANSaccording to asme which volume listed below must be used to hand signal a tower crane asme b30.5 - ANSaccording to asme which volume listed below must be used to hand signal a mobile crane asme b30.5 - ANSwhich asme section covers the construction of the mobile cranes back up - ANSif the operator sounds three short audible signals while loving the crane he/she intends to boom up 1' - ANShow do you level a load communicate with the operator - ANSaccording to asme b30.23 in a suspended personnel platform without boom motion controls management shall designate one person to perform what task continuously - ANSduring all crane movements, asme b30.5 states that communication shall be maintained damage to the cable - ANSwhat happens when you side load a crane signalman and who operator and platform occupants - ANSduring hoisting of a personnel platform and using a signalman who is located on the ground who mush the signalman keep continuous and positive communication with osha 1926.1400 appendix a - ANSaccording to osha which hand signal examples must be used to signal cranes osha 1926.1400 appendix a - ANSOSHA's standard method crane hand signals would be located in the following outward - ANSaccording to osha 1926.1431 during personnel platform hoisting operations access gates shall not swing in which direction perspective - ANSany direction given to the crane operator by the signal person shall be given from the operator placard in the cab and 2 in the outside of the crane - ANSwhere can you find information on electrical hazards assembly and disassembly of a crane posted conspicuously - ANSaccording to asme b30.5 where must a hand signal chart be posted pre lift meeting - ANSwhat must the operator signalman and the crew attend before they hoist a personnel platform radius decrease - ANSif boom angle remains the same while telescoping in what happens to the boom radius rigging of the load - ANSa signal person should not have to worry about safety representative - ANSwho is responsible for designating the number of signalpersons required to hoist a personnel platform safely side - ANSon a mobile crane which quadrant has less backwards stability signal person - ANSosha 1926.1401 a dedicated spotter must also have the qualifications of a signal person - ANSprior to beginning lifting operations using voice signals the signals shall be discussed and agreed upon by the lift director crane operator and which person lift below signalman - ANSaccording to 1926.1431 the only occupant of the personnel platform allowed to have any part of his body outside the platform is the person positioning the platform and the stand away from the load and signal from a safe distance - ANSwhen giving voice signals the signal person should standard signals - ANSaccording to asme b30.5 special signals cannot conflict with stop - ANSif the operator sounds one short audible signal while moving the crane he/she intends to stop all operations and consult with the operator - ANSif the operator reacts incorrectly to a given signal what should the signal person do stop crane movements - ANSif the communication is disrupted at any time while the crane is operation, the operator shall subpart cc - ANSwhat osha suboart refers to signal person operations test - ANStelephone,radios, or equivalent if used for voice signals must have what performed on them prior to use tested - ANSaccording to osha 1926.1419 before lifting operations begin communication systems shall be three - ANSaccording to osha and asme b30.5 each series of voice signals contain how many elements utility owner/operator - ANSoverheard power lines shall be considered energized authorization that the lines are deenergized must be given by whom when is signal person is not in direct line if the sight of the operator - ANSwhen hand signals not an option when necessary to control platform - ANSwhen signaling a personnel platform 1926.1431 states tag lines must be used wind from the rear - ANSwhen can wind play an effect on decreasing the load of capacity of a crane