Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NCCER MODULE 44108 EXAM - SCHEDULING 100% VERIFIED ANSWERS 2024/2025 CORRECT STUDY SET, Exams of Organization and Business Administration

NCCER MODULE 44108 EXAM - SCHEDULING 100% VERIFIED ANSWERS 2024/2025 CORRECT STUDY SET

Typology: Exams

2024/2025

Available from 11/15/2024

darine-4
darine-4 🇺🇸

3.7

(7)

3.6K documents

1 / 3

Toggle sidebar

Related documents


Partial preview of the text

Download NCCER MODULE 44108 EXAM - SCHEDULING 100% VERIFIED ANSWERS 2024/2025 CORRECT STUDY SET and more Exams Organization and Business Administration in PDF only on Docsity! NCCER MODULE 44108 EXAM - SCHEDULING 100% VERIFIED ANSWERS 2024/2025 CORRECT STUDY SET To effectively track projects and schedules, the project manager must be able to ______. a) run project management software b) keep detailed daily notes c) know the concepts of lean scheduling d) manage his/her own time d) manage his/her own time A wise project manager will use the 80/20 rule to _____. a) select vendors b) decide where time is best spent c) determine which subcontractors are best d) identify which project resources are most valuable b) decide where time is best spent A time period when activities overlap is known as _____. a) inter-task relationships b) lags c) project adjustments d) dependency reviewing b) lags A well-developed project schedule reduces construction time, forces detailed thinking, and ______. a) satisfies local codes and compliance agency requirements b) presents the most optimistic view of the work possible c) prevents weather from interfering with the job d) improves communication among the team members d) improves communication among the team members A SIPS is typically a schedule that covers _____. a) three or four days b) one to two weeks c) two to four weeks d) one to two months c) two to four weeks A well-prepared schedule will ______. a) track all tasks and materials b) track tasks and subcontractors' required resources c) record progress and document problems d) capture purchasing baselines c) record progress and document problems The chart that provides a macro view of the project is the _____. a) AOA graph b) flow chart c) bar chart d) AON chart c) bar chart Lean construction concepts have been adapted from the standards set in ______. a) Europe b) Southeast Asia c) manufacturing d) farming c) manufacturing