Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

NICET Exam 2024/2025 with 100% Accurate Solutions, Exams of Nursing

Detailed and precise answers to a wide range of questions related to the nicet (national institute for certification in engineering technologies) exam for the years 2024/2025. Various topics such as fire alarm system requirements, cable specifications, installation guidelines, testing and maintenance procedures, and safety protocols. The comprehensive nature of the information presented makes this document a valuable resource for individuals preparing for the nicet exam, as well as professionals working in the fire alarm and protection industry. Answers to questions on topics like secondary power requirements, system classifications, detector types, wiring specifications, testing frequencies, and more. With its focus on providing accurate and up-to-date information, this document can serve as a reliable study guide or reference material for those seeking to excel in the nicet exam and enhance their knowledge in the field of fire alarm systems.

Typology: Exams

2023/2024

Available from 08/01/2024

ACADEMICLINKS
ACADEMICLINKS 🇺🇸

3.9

(8)

3.1K documents

1 / 10

Toggle sidebar

Related documents


Partial preview of the text

Download NICET Exam 2024/2025 with 100% Accurate Solutions and more Exams Nursing in PDF only on Docsity! NICET  EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS NICET  EXAM 2024/2025 WITH 100% ACCURATE SOLUTIONS Secondary power for remote supervising station systems shall be capable of normal operation for ___ hours and then operate the system in alarm for ___ minutes? - Precise Answer ✔✔24 / 5 A fire alarm system which serves contiguous or noncontiguous properties under one ownership is considered? - Precise Answer ✔✔Proprietary system An initiating device which is destroyed as a result of operation is what type? - Precise Answer ✔✔Nonrestorable The delay from the operation of an initiation device to the automatic activation of a fire safety function shall not exceed? - Precise Answer ✔✔10 seconds What documentation shall be delivered upon final acceptance of the system? - Precise Answer ✔✔Owners manual and installation instructions, Record copy of site specific software, Record drawings Maintenance, testing and inspection records shall be maintained for how long? - Precise Answer ✔✔Until the next test and 1 year thereafter Radiant energy detectors shall be tested how frequently? - Precise Answer ✔✔Semi annually How shall non restorable heat detectors be tested? - Precise Answer ✔✔Functional test both electrically and mechanically What is the alarm capability of a Class B circuit with a single open? - Precise Answer ✔✔All detectors from the control to the open would have alarm capability What is the required testing frequency for a waterflow device? - Precise Answer ✔✔Semi annually Consider a simple series circuit with a 24VDC power supply and a single 240 ohm resister. What is the current for this circuit. - Precise Answer ✔✔.10 amps (24v/240ohm = .10 amp) What is the resistance of 1000 feet of 16 AWG uncoated copper conductor at 75C? - Precise Answer ✔✔4.89 ohms Consider a circuit of 1000 feet (total) of coated 18 AWG FPL from a 24 VDC FACP to an initiating device, with a circuit amperage of 1 amp. At 75C, what voltage is present at the device? - Precise Answer ✔✔I x R = Voltage Drop 1 A x 8.1 ohms 8.1 v 24 v - 8.1 ohms = 15.9 v Why is it important to cut installation conductors at the device and use separate incoming and outgoing conductors? - Precise Answer ✔✔Circuit supervision Select the correct standby battery requirements for a Remote Station Fire Alarm System given the following: Standby load - .035 Amps Alarm load - 2.5 Amps - Precise Answer ✔✔Requires 12AH standby Air sampling network piping shall be conspicuously identified at? - Precise Answer ✔✔Changes in direction, Each side of penetrations, Intervals not to exceed 20ft Protective devices / guards for fire alarm devices shall be? - Precise Answer ✔✔Listed for use with the device Scaffolding and components shall be capable of supporting a weight of? - Precise Answer ✔✔4 times the max intended load How far above the point of support is a ladder to extend when used to access the roof? - Precise Answer ✔✔3 ft When are hard hats required on the job? - Precise Answer ✔✔When there is a potential for injury from falling objects When using a grounded power tool you find an available extension cord (2 wire). What should you do? - Precise Answer ✔✔You may not use an ungrounded 2 wire extension cord When may dehydration occur? - Precise Answer ✔✔During any season How do you treat someone who has fainted? - Precise Answer ✔✔Elevate their feet When should a tourniquet be applied to a bleeding wound? - Precise Answer ✔✔Only as a last resort Which of the following is not a symptom of Heat Stroke? - Precise Answer ✔✔Profuse sweating