Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

OSHA Final Exam Certification Test: A Comprehensive Guide to Workplace Safety, Exams of Nursing

A comprehensive overview of osha safety regulations and best practices, covering topics such as personal protective equipment (ppe), engineering controls, work practice controls, materials handling, scaffolding, electrical safety, and chemical hazards. It includes multiple-choice questions and answers, designed to test knowledge and understanding of osha standards. This resource is valuable for individuals seeking to enhance their understanding of workplace safety and prepare for osha certification exams.

Typology: Exams

2024/2025

Available from 01/08/2025

smart-scores
smart-scores 🇺🇸

5

(1)

2.9K documents

Partial preview of the text

Download OSHA Final Exam Certification Test: A Comprehensive Guide to Workplace Safety and more Exams Nursing in PDF only on Docsity!

OSHA FINAL EXAM Certification Test with verified

answers

Payment |for |PPE |- |correct |answer |-must |be |provided |by |the |employer |at |no |cost |to |employees, |except |for |specific |items |such |as: | -safety |toe |wear | -prescription |safety |eyewear | -everyday |clothing |and |weather |related |gear Engineering |Controls |- |correct |answer |-If......the |work |environment |can |be |physically |changed |to |prevent |employee |exposure |to |the |potential |hazard, |THEN......the |hazard |can |be |eliminated |with |an |engineering |control | Examples: | -Initial |design |specifications | -substitute |less |harmful |material | -change |process | -enclose |process | -isolate |process Work |Practice |Control |- |correct |answer |-IF........employees |can |change |the |way |they |do |their |jobs |and |the |exposure |to |materials....THEN...the |hazard |can |be |eliminated |with |a |work |practice |control | | Examples: |Job |rotation/wet |method/personal |hygiene/housekeeping |and |maintenance Responsibilities |- |correct |answer |-Employer: | -asses |the |workplace |for |hazards | -provide |PPE | -determine |when |to |use | -Provide |PPE |training |for |employees |and |instruction |in |proper |use | |

Employee: | -use |PPE |in |accordance |with |training |and |received |and |other |instructions | -inspect |daily |and |maintain |in |a |clean |and |reliable |condition PPE |Program |- |correct |answer |--includes |procedures |for |selecting, |providing, |and |using |PPE | -first--assess |the |workplace |to |determine |if |hazards |are |present | -after |selecting |PPE, |provide |training |to |employees Hard |Hats |- |correct |answer |-Class |G: |General |service |(most |requires |class |G)=ON |QUIZ | Class |E: |Electrical |Work | Class |C: |designed |for |comfort, |offer |limited |protection Safety |Glasses |- |correct |answer |--z87 |+ |or |Z87 |. Types |of |rubber |gloves |- |correct |answer |--Nitrile-solvents, |harsh |chemicals |etc. | -Butyl-gas |or |water |vapors | -Kevlar-protects |against |cuts | -Stainless |Steel |Mesh-protects |against |cuts |and |lacerations Flying |Objects |- |correct |answer |--pressurized |containers | -abrasive |wheels | -powder |actuated |tool | -compressed |air -Falling |objects |- |correct |answer |--tools |and |material |staged |at |elevation | -equipment |failures | -Wind | -loading/unloading | -unbraced |walls |or |other |structural |collapses |

-attach |handles |to |load |to |reduce |the |chances |of |getting |fingers |smashed Materials |Handling |Equipment |- |correct |answer |--employees |must |be |trained |in |proper |use |and |limitations |of |the |equipment |they |operate | -this |includes |knowing |how |to |effectively |use |equipment |such |as |forklifts, |cranes, |and |slings Earthmoving |Equipment |- |correct |answer |--provide |seatbelts | -equipment |with |an |obstructed |rear |view |can't |be |used |in |reverse |unless |the |equipment |has |a |signal |alarm Cranes |- |correct |answer |--check |the |load |chart |in |the |cab | -freq |inspect | -never |lift |people | -check |overhead |power |lines | -ensure |area |of |travel |is |clear Rigging |Equipment |Slings |- |correct |answer |--chain | -wire |rope | -metal |mesh | -synthetic | -all |rigging |must |be |inspected |prior |to |use Sling |Inspection |- |correct |answer |--each |day |before |use | -where |service |conditions |warrant | -remove |them |from |service |if |damaged |or |defective | -remove |when | 6 |lays |are |frayed Alloy |Steel |Chains |- |correct |answer |--adapts |to |shape |of |the |load | -can |damage |by |sudden |shocks |

-best |choice |for |hoisting |hot |materials | -must |be |inspected |annually | -must |have |an |affixed |tag |stating |size, |grade, |rated |capacity, |and |sling |manufacturer Employee |Training |- |correct |answer |--must |be |trained |on |initial |assignment |and |when |a |process |changes |or |there |is |a |new |hazard |in |the |workplace | -must |know |where |SDS |can |be |found Hazards |of |chemicals |- |correct |answer |--physical |hazard | -flammable/explosive, |water |reactive, |unstable | -health |hazards | -nausea, |stomach, |reproductive |damage | -detection |of |release |will |vary |depending |upon |the |chemical | -visual, |smell, |odor, |air |monitoring Acute |vs |Chronic |- |correct |answer |--Acute | -occur |after |a |short |period |of |exposure |and |their |damage |happens |quickly | -Chronic | -occurs |gradually |over |time |and |from |repeat |exposure Safety |Data |Sheets |- |correct |answer |--required |for |every |chemical |on |the |project | -most |recent |version |from |the |manufacturer | -must |be |legible |and |complete | -readily |accessible |at |all |times | -site |specific |binder Routes |of |Entry |- |correct |answer |--Inhalation | -inhaling |vapors, |dusts |and |fumes | -Absorption |

Fall |Protection |Requirements |- |correct |answer |--can |use |a |PFAS |instead |of |guardrails |on |some |scaffolds Falling |object |protection |- |correct |answer |--wear |hardhats | -barricade |area |below |scaffold |to |forbid |entry |into |that |area | -use |panels |or |screens |if |material |is |stacked |higher |than |the |toe |board | -build |a |canopy |or |erect |a |net |below |the |scaffold |that |will |shield Overhead |Power |Lines |- |correct |answer |--the |possibility |of |electrocution |is |a |serious |consideration |when |working |near |overhead |power |lines | -check |the |clearance |distances |listed Essential |elements |of |safe |scaffold |construction |- |correct |answer |--use |appropriate |scaffold |construction |methods | -proper |scaffold |access | -properly |use |a |competent |person Scaffold |Platform |Construction |- |correct |answer |--platforms |must: | -be |fully |planked |or |decked |with |no |more |than |one |inch |gaps | -be |able |to |support |its |weight |and |no |more |than | 4 |times |the |load | -no |large |gaps |in |front |edge |of |platforms | -each |abutted |end |plank |has |to |be |on |a |separate |support |surface | -12 |inch |overlap scaffold |limitations |- |correct |answer |--the |height |of |the |scaffold |should |not |be |more |than |four |times |its |minimum |base |dimension |unless |guys, |ties, |or |braces |are |used | | -when |using |ladders |the |bottom |rung |cannot |be |more |than | 24 |inches |high | | -ropes |must |be |capable |of |supporting | 6 |times |the |load

competent |person |- |correct |answer |-evaulate |connectins |to |ensure |the |supporting |surfaces |can |support |load | -inspect |ropes |for |defects |before |shift | -PFAS |must |have |anchors |independent |of |the |scaffold |support |system Moving |Scaffolds |- |correct |answer |--employees |cannot |be |on |a |moving |scaffold |unless: | -surface |is |level | -height |to |base |ratio |is | 2 |to | 1 | -outriggers |are |installed |on |a |flat |surface Electrical |Awareness |- |correct |answer |-Electricity |is |the |second |leading |cause |of |death |in |construction | | Electrocutions |make |up | 12 |percent |of |construction |fatalities |annually | | An |average |of |one |worker |is |electrocuted |on |the |job |everyday Current |flows |In |a |loop |or |circuit |- |correct |answer |--circuits |are |AC |or |DC | -current |is |usually |AC | -AC |current |has |five |parts | -electrical |source | -hot |wire |to |the |tool | -the |tool |itself | -Neutral |wire |returns |electricity |from |the |tool | -ground | -5 |milliamps |trip |the |wire | | -1000 |amps |in | 1 |milliamp

-20 |inches |beyond |the |swing |of |the |door | | -fix |slippery |conditions |before |using LADDERS |- |correct |answer |--ensure |rungs |are |spaced |10-14 |inches | -inspect |ladder | -keep |bottom |and |top |clear | -keep |ladders |free |from |slipping |hazards | -inspect |before |use |for |cracks, |dents, |missing |rungs | -side |rails---must |be |11.5 |inches |apart | -must |support | 4 |times |the |maximum |load | -don't |paint |ladders |(inspection |issues) | -4 |to | 1 |angle |ratio | -must |be | 3 |feet |above |the |upper |surface | | -equip |a |ladder | 24 |feet |or |longer |with |either |a |ladder |safety |device |or |self |retracting |lifelines |with |rest |platform |of |every | 150 |feet |or |less | -cage |or |well, |and |multiple |ladder |sections, |each |section |not |exceeding | 50 |feet Stable |rock |- |correct |answer |-Class |A-fairly |stable |soil. |Can |be |laid |back |¾ |to | 1 |slope |or |benched | Class |B- |generally |stable |soil/laid |back |at |1:1 |or |benched | Class |C-least |stable/cannot |be |benched/laid |at |1.5:1 |ratio Shoring |- |correct |answer |--provides |framework |to |work |in | -uses |wales, |cross |braces, |and |uprights | -supports |excavation |walls | -must |know |soil |type Major |causes |of |crane |accidents |- |correct |answer |-Falls/Overturns/contact |with |power |lines/mechanical |failures

How |do |accidents |occur |for |cranes? |- |correct |answer |--Instability-unsecured |load, |load |capacity |exceeded, |or |ground |not |level |or |too |soft | -lack |of |communication Types |of |cranes: |- |correct |answer |--Mobile | -Hydraulic | -Overhead | -Gantry | -Tower Crane |HAZARDS |- |correct |answer |--Improper |load |rating | -excessive |speeds | -no |signals | -inadequate |maintenance | -inspected |daily |by |operator/in |cab |on |site |annual |inspection |is |there | -must |be | 10 |feet |away |from |overhead |power |lines | -no |damaged |exhaust |or |windows | -must |have |steps/guardrail |walkways | -no |boom |angle |indicator | -Not |using |outriggers Load |capacity |- |correct |answer |--make |sure |the |crane |operator |can |see | -rated |load |capacities | -operating |speeds | -special |hazard |warning |or |instruction Know |the |weight |of |the |load |- |correct |answer |--refer |to |shipping |ticket | -ensure |lift |calculations |are |correct

-physical |damage |to |crane | -etc. PFAS |- |correct |answer |--Must |limit |free |fall |to |no |more |than | 6 |feet |

  • |Prevent |contact |with |lower |levels
  • |Limit |forces |on |body |to | 1800 |lbs -Most |components |must |be |designed |to |withstand |-loads |of | 5000 |lbs Warning |Line |System |- |correct |answer |- |At |least | 6 |feet |away |from |unprotected |edge - |Flagged |every | 6 |feet - |Suspended |between | 34 |- | 39 |inches - |Stanchions |capable |of |holding | 16 |pounds |of |force - |Line |minimum |tensile |breaking |strength |of | 500 |pounds Hole |Covers |- |correct |answer |-All |holes |or |openings | 2 |inches |or |greater |must |be |provided |a |cover |or |guardrail |immediately Protection |- |correct |answer |-Toeboards - |Canopy |structure | |Barricade |the |area - |Minimum - | 3 | 1⁄2 |inches |high - |Withstand | 50 |pounds - |Maximum - | 1⁄4 |inch |gap Stairway |or |Ladder |- |correct |answer |-There |must |be |a |stairway |or |ladder |at |points |of |access |where |there |is |an |elevation |break |of | 19 |inches |or |more. Shield |- |correct |answer |-a |structure |able |to |withstand |a |cave-in |and |protect |employees

Shoring |- |correct |answer |-a |structure |that |supports |the |sides |of |an |excavation |and |protects |against |cave-ins Sloping |- |correct |answer |-a |technique |that |employs |a |specific |angle |of |incline |on |the |sides |of |the |excavation. |The |angle |varies |based |on |assessment |of |impacting |site |factors.