PSPO 1 Exam Questions with Answers Latest Update 2024-Assured Success, Exams of Nursing

A comprehensive set of pspo 1 exam questions and answers, covering various aspects of scrum framework, including the roles, events, artifacts, and principles. It aims to help scrum practitioners and aspiring product owners prepare for the pspo 1 certification exam. The questions cover a wide range of topics, such as the responsibilities of the product owner, the composition of the scrum team, the purpose and execution of scrum events, the management of the product backlog, and the application of scrum values and principles. By studying this document, individuals can gain a deeper understanding of the scrum methodology and enhance their skills in effectively managing and delivering products in complex environments. Structured in a clear and concise manner, making it a valuable resource for both experienced scrum practitioners and those new to the framework.

Typology: Exams

2023/2024

Available from 08/28/2024

john-master-2
john-master-2 šŸ‡ŗšŸ‡ø

2.3K documents

1 / 18

Toggle sidebar

Related documents


Partial preview of the text

Download PSPO 1 Exam Questions with Answers Latest Update 2024-Assured Success and more Exams Nursing in PDF only on Docsity!

PSPO 1 Exam Questions with Answers Latest

Update 2024-Assured Success

As a Manager, the Product Owner should tell the Developers how to decompose Product Backlog items into smaller work items of one day or less.True or False? - Correct Answer False. For each selected Product Backlog item, the Developers plan the work necessary to create an Increment that meets the Definition of Done. This is often done by decomposing Product Backlog items into smaller work items of one day or less. How this is done is at the sole discretion of the Developers. No one else tells them how to turn Product Backlog items into Increments of value. During the Sprint Review, what happens if an item does not meet the Definition of Done? - Correct Answer If a Product Backlog item does not meet the Definition of Done, it cannot be released or even presented at the Sprint Review. Instead, it returns to the Product Backlog for future consideration. Therefore as it is not presented it cannot be discussed. True or false, the Definition of "Done" is created during the first Sprint and should remain unchanged until the Product release? - Correct Answer False If the Sprint Review is successful what is the resulting output? - Correct Answer The purpose of the Sprint Review is to inspect the outcome of the Sprint and determine future adaptations. The Scrum Team presents the results of their work to key stakeholders and progress toward the Product Goal is discussed. During the event, the Scrum Team and stakeholders review what was accomplished in the Sprint and what has changed in their environment. Based on this information, attendees collaborate on what to do next. The Product Backlog may also be adjusted to meet new opportunities. The Sprint Review is a working session and the Scrum Team should avoid limiting it to a presentation. "Common understanding of what can be delivered in the Increment and how will the work needed to deliver the Increment be achieved": This is related to planning "Common understanding of progress toward the Sprint Goal and how progress is trending toward completing the work in the Sprint Backlog": This mentioned the Sprint Backlog and progress towards the Sprint Goal but at the Review stage, the Sprint has already finished. Sprint Planning only requires the Product Owner and the Developers. There is nothing to do for the Scrum Master. - Correct Answer False. The work to be performed in the Sprint is planned at the Sprint Planning. This plan is created by the collaborative work of the entire Scrum Team. Where can Scrum be used? - Correct Answer Scrum has been adopted in many domains holding essentially complex work, beyond software product development

where Scrum has its roots. As Scrum's use spreads, developers, researchers, analysts, scientists, and other specialists do the work. Is Scrum a process, technique, framework or method? - Correct Answer Scrum is not a process, technique, or definitive method. Rather, it is a framework within which you can employ various processes and techniques. How long are the time-boxes for the Sprint Review and the Sprint Retrospective? - Correct Answer The Sprint Review is at most a four-hour meeting for one-month Sprints. The Sprint Retrospective is at most a three-hour meeting for one-month Sprints. What can lead to the Sprint Goal becoming invalid according to the Scum Guide 2020?

  • Correct Answer the Scrum Guide states: When a Sprint's horizon is too long the Sprint Goal may become invalid, complexity may rise, and risk may increase. Shorter Sprints can be employed to generate more learning cycles and limit risk of cost and effort to a smaller time frame. Each Sprint may be considered a short project. The Scrum Guide recommends increasing the Daily Scrum timebox dependant on the size of the Scrum Team. The more Developers the more time will be needed. - Correct Answer The Daily Scrum is a 15-minute timeboxed event for a Scrum Team of any size. How long should the Sprint Planning be? - Correct Answer Sprint Planning is timeboxed to a maximum of eight hours for a one-month Sprint. There is no need to decompose all the Items in the Sprint Backlog. It can be done only for the first days of the Sprint. It is a good practice to have at least two Product Owners on big projects so there is coverage if one Product Owner is off ill. True or false? - Correct Answer False.The Product Owner is one person, not a committee, but the Product Owner may represent the desires of a committee in the Product Backlog. Select three of the most appropriate characteristics of the Developers - Correct Answer Within a Scrum Team, there are no sub-teams or hierarchies. It is a cohesive unit of professionals focused on one objective at a time, the Product Goal. The Developers are always accountable for: Creating a plan for the Sprint, the Sprint Backlog Instilling quality by adhering to a Definition of Done Adapting their plan each day toward the Sprint Goal Holding each other accountable as professionals Select all the Scrum Artifacts - Correct Answer The Scrum artifacts are Product Backlog, Sprint Backlog and Increment.

Some Key Stakeholders have asked the Scrum Master if they can attend the Sprint Planning to provide technical or domain advice. Should the Scrum Master allow or deny this? - Correct Answer Allow. The Scrum Team may also invite other people to attend Sprint Planning to provide advice. At the Sprint Retrospective some improvements were identified. What should be done? Select the best option. - Correct Answer The Scrum Team identifies the most helpful changes to improve its effectiveness. The most impactful improvements are addressed as soon as possible. They may even be added to the Sprint Backlog for the next Sprint. What is the Developers' source of requirements for the product? - Correct Answer The Product Backlog is an emergent, ordered list of what is needed to improve the product. It is the single source of work undertaken by the Scrum Team. Who has responsibility for the Product Backlog Management? - Correct Answer The Product Owner is accountable for maximizing the value of the product resulting from the work of the Scrum Team. How this is done may vary widely across organizations, Scrum Teams, and individuals. The Product Owner is also accountable for effective Product Backlog management. The Scrum Team members are: - Correct Answer The fundamental unit of Scrum is a small team of people, a Scrum Team. The Scrum Team consists of one Scrum Master, one Product Owner, and Developers. Within a Scrum Team, there are no sub-teams or hierarchies. It is a cohesive unit of professionals focused on one objective at a time, the Product Goal. What does Product Backlog management include? Select the three most applicable items: - Correct Answer Product Backlog management includes: Developing and explicitly communicating the Product Goal; Creating and clearly communicating Product Backlog items; Ordering Product Backlog items; and, Ensuring that the Product Backlog is transparent, visible and understood. Which of the below features does the Scrum Team possess? - Correct Answer Scrum Teams are cross-functional, meaning the members have all the skills necessary to create value each Sprint. They are also self-managing, meaning they internally decide who does what, when, and how. Cross-functional teams have all competencies needed to accomplish the work without depending on others not part of the team. Sprint Retrospective is to: - Correct Answer The purpose of the Sprint Retrospective is to: Inspect how the last Sprint went with regards to people, relationships, process, and tools; Identify and order the major items that went well and potential improvements; and, Create a plan for implementing improvements to the way the Scrum Team does its work.

How frequently should Scrum artifacts and progress toward a Sprint Goal be inspected?

  • Correct Answer The Scrum artifacts and the progress toward agreed goals must be inspected frequently and diligently to detect potentially undesirable variances or problems. Does Scrum allow the Product Owner and the Scrum Master be a part of the Developers? - Correct Answer Yes. Scrum does not prohibit the Product Owner or the Scrum Master do development work. However, it could create a conflict of interest. The product is experiencing many bugs in testing. Is it normal to have a dedicated Sprint to remove all technical debt and prepare the Product for the upcoming release? - Correct Answer It is not normal. The Scrum Team delivers at least one Increment of product functionality every Sprint. This Increment is usable, so a Product Owner may choose to immediately release it. So, there is nothing to prepare. Each increment contains only "Done" functionality that could be released immediately. Select the three most applicable items for the Definition of Done DoD is used to assess when work is complete on the product Increment (Correct) Keeps quality standards consistent through multiple Development teams (Correct) DoD ensures artifact transparency (Correct) DoD is created by the Product Owner and the Developers agree to comply with it DoD helps to calculate velocity of the Scrum Team (Incorrect) - Correct Answer The Definition of Done is a formal description of the state of the Increment when it meets the quality measures required for the product. The moment a Product Backlog item meets the Definition of Done, an Increment is born. If there are multiple Scrum Teams working together on a product, they must mutually define and comply with the same Definition of Done. The Definition of Done creates transparency by providing everyone a shared understanding of what work was completed as part of the Increment Who is responsible for time and effort estimates in the Sprint Backlog? The Product Owner The Scrum Team The Product Owner and the Scrum Master The Developers (Correct) - Correct Answer For each selected Product Backlog item, the Developers plan the work necessary to create an Increment that meets the Definition of Done. This is often done by decomposing Product Backlog items into smaller work items of one day or less. How this is done is at the sole discretion of the Developers. No one else tells them how to turn Product Backlog items into Increments of value. What do the Developers have sole responsibility for?

The Increment The Sprint Backlog (Correct) The Product Backlog The Definition of Done - Correct Answer Only the Development Team should change the Sprint Backlog during a Sprint. The Sprint Backlog is a plan by and for the Developers. It is a highly visible, real-time picture of the work that the Developers plan to accomplish during the Sprint in order to achieve the Sprint Goal. Consequently, the Sprint Backlog is updated throughout the Sprint as more is learned. It should have enough detail that they can inspect their progress in the Daily Scrum. What is the Sprint Backlog? The Sprint Goal and the plan for delivering Product Backlog items The Sprint Goal, Product Backlog items selected for this Sprint plus the plan for delivering them (Correct) The Product Backlog items selected for this Sprint The Product Backlog items selected for this Sprint plus the Team Backlog items - Correct Answer The Sprint Backlog is composed of the Sprint Goal (why), the set of Product Backlog items selected for the Sprint (what), as well as an actionable plan for delivering the Increment (how). Scrum is founded on? - Correct Answer Scrum is founded on empiricism and lean thinking. Empiricism asserts that knowledge comes from experience and making decisions based on what is observed. Lean thinking reduces waste and focuses on the essentials. From the Scrum Team who is most responsible for promoting and supporting Scrum? The Scrum Team - Correct Answer The Scrum Master is responsible for promoting and supporting Scrum as defined in the Scrum Guide. Scrum Masters do this by helping everyone understand Scrum theory, practices, rules, and values. Who is responsible for projecting the likelihood of achieving the Sprint Goal by tracking the total work remaining in the Sprint Backlog at every Daily Scrum? - Correct Answer At any point in time in a Sprint, the total work remaining in the Sprint Backlog can be summed. The Developers track this total work remaining at least for every Daily Scrum to project the likelihood of achieving the Sprint Goal. By tracking the remaining work throughout the Sprint, the Scrum Team can manage its progress. Who usually makes required changes to the Sprint Backlog during the Sprint? - Correct Answer The Sprint Backlog is a plan by and for the Developers. It is a highly visible, real-time picture of the work that the Developers plan to accomplish during the Sprint in order to achieve the Sprint Goal. Consequently, the Sprint Backlog is updated throughout the Sprint as more is learned. It should have enough detail that they can inspect their progress in the Daily Scrum.

If your team manages to complete the Daily Scrum in 5 minutes, can you finish early or spend another 10 on another useful team activity such as the Product Backlog refinement? - Correct Answer All events in Scrum are time-boxed. It means that every event has a maximum duration. However, the Scrum Guide does not require a minimum duration for any event. As Scrum Teams mature, they can do some events faster (e.g. the Sprint Planning or the Sprint Retrospective). If you want to use the time doing the backlog review then that is fine. Should the Daily Scrum be skipped if there is nothing that needs to be discussed? - Correct Answer Each event in Scrum is a formal opportunity to inspect and adapt Scrum artifacts. These events are specifically designed to enable the transparency required. Failure to operate any events as prescribed results in lost opportunities to inspect and adapt. Events are used in Scrum to create regularity and to minimize the need for meetings not defined in Scrum. What questions does Sprint Planning answer? Select three. - Correct Answer Sprint Planning answers the following: What can be delivered in the Increment resulting from the upcoming Sprint? How will the work needed to deliver the Increment be achieved? Also why is the Sprint valuable What provides guidance to the Developers on why they are building the Increment? The Sprint Goal (Correct) The Product Owner (Incorrect) The Scrum Master The Sprint Backlog - Correct Answer The Sprint Goal is the single objective for the Sprint. Although the Sprint Goal is a commitment by the Developers, it provides flexibility in terms of the exact work needed to achieve it. The Sprint Goal also creates coherence and focus, encouraging the Scrum Team to work together rather than on separate initiatives. For a new product, 10 developers and the Product Owner have been assigned. As the Scrum Master how should you advise they be divided into teams? Choose all applicable options: 1 team of 10 people (because the bigger the team the better) 3 teams of 4, 3 and 3 people (each team is cross-functional) (Correct) 2 teams of 6 and 4 people (after a short meeting the developers decided this is the best option) (Correct) 2 teams of 6 and 4 people (because it is good to have a separate quality assurance team) - Correct Answer The Scrum Team is small enough to remain nimble and large enough to complete significant work within a Sprint, typically 10 or fewer people. In general, we have found that smaller teams communicate better and are more

productive. If Scrum Teams become too large, they should consider reorganizing into multiple cohesive Scrum Teams, each focused on the same product. Therefore, they should share the same Product Goal, Product Backlog, and Product Owner. 1 team of 10 people could be allowed if the Scrum Team has determined it is appropriate, but this answer is not correct as the statement of bigger is better may not be correct. What is the Increment? The sum of all the Product Backlog items completed during the Sprint A stepping stone towards the Product Goal and an additive to all prior increments which integrates successfully. (Correct) All items in the Sprint Backlog that could be released regardless of whether the Product Owner decides to actually do it All "Done" items in the Sprint Backlog - Correct Answer An Increment is a concrete stepping stone toward the Product Goal. Each Increment is additive to all prior Increments and thoroughly verified, ensuring that all Increments work together. In order to provide value, the Increment must be usable. During the Daily Scrum the Scrum Master should make sure each team member should answer the three main questions: What did I do yesterday? What will I do today? Do I see any impediment? False (Correct) True (Incorrect) - Correct Answer There is not a prescribed structure set by the Scrum Guide. The structure of the Daily Scrum is set by the Scrum Team and can be done in any way so long as it focuses on progress toward the Sprint Goal. Some Scrum Teams will use questions, some will be more discussion based. The questions are a useful guide, but other ways of conducting the meeting are also possible. The Scrum Master helps to maximize the value created by the Scrum Team and removes impediments. The time-box for the Daily Scrum is how long? 15 minutes (Correct) 20 minutes 25 minutes Not limited. Every Scrum Team member should have enough time to answer the three Main Questions. - Correct Answer The Daily Scrum is a 15-minute time-boxed event. Can the Sprint Planning session be finished with work planned only for the first days of the Sprint where that work consists of units of one day or less? Yes, if the remaining work is also estimated, maybe in bigger units (Correct) No, all items in the Sprint Backlog should be decomposed to units of one day or less by the end of the Sprint Planning

(Incorrect) - Correct Answer The Scrum Guide requires only the work planned for the first days of the Sprint is decomposed by the end of the Sprint Planning, often to units of one day or less. However, the Development Team should be able to explain to the Product Owner and Scrum Master how it intends to work as a self-organizing team to accomplish the Sprint Goal and create the anticipated Increment. What does Cone of Uncertainty show? Dependencies, start times and stop times for project tasks How much is known about the Product over time (Correct) Hierarchy of tasks that comprise a project How much work remains till the end of the Sprint - Correct Answer The Cone of Uncertainty describes the evolution of the amount of uncertainty during a project. Which is true regarding cancelling a Sprint? The Sprint may be cancelled if the Sprint Goal becomes obsolete (Correct) At the Sprint Retrospective the Scrum Master determines who from the Development Team is responsible for cancelling the Sprint The Sprint should only be cancelled with agreement from the Key Stakeholders Only the Scrum Team together have the authority to cancel a Sprint Only the Product Owner has the authority to cancel the Sprint (Correct) - Correct Answer A Sprint could be cancelled if the Sprint Goal becomes obsolete. Only the Product Owner has the authority to cancel the Sprint. How does the Scrum Master assist the Product Owner? Select the three most appropriate from the below Finding techniques for effective Product Backlog management (Correct) Understanding product planning in an empirical environment (Correct) Leading and coaching the organization in its Scrum adoption (Incorrect) Facilitating stakeholder collaboration as requested (Correct) Introducing cutting edge development practices - Correct Answer The Scrum Master serves the Product Owner in several ways, including: Helping find techniques for effective Product Goal definition and Product Backlog management; Helping the Scrum Team understand the need for clear and concise Product Backlog items; Helping establish empirical product planning for a complex environment; and, Facilitating stakeholder collaboration as requested or needed. Who participates in the Sprint Planning? Select the applicable. Other people may be invited to provide advice

(Correct) The Developers (Correct) The Team Manager The Scrum Master (Correct) The Product Owner (Correct) - Correct Answer This resulting plan is created by the collaborative work of the entire Scrum Team. The Scrum Team may also invite other people to attend Sprint Planning to provide advice. True or false, the Scrum Master is focused primarily on the Scrum Team and usually does not care about those outside the Scrum Team. False (Correct) True - Correct Answer The Scrum Master is accountable for establishing Scrum as defined in the Scrum Guide. They do this by helping everyone understand Scrum theory and practice, both within the Scrum Team and the organization. The Scrum Master is responsible for promoting and supporting Scrum as defined in the Scrum Guide, how does he or she serve the Organisation? Select the most appropriate answers. Mixing experienced developers and junior specialists across different development teams in the organization to speed up Scrum adoption (Incorrect) Making sure the key stakeholders are invited on all Scrum Reviews within organization Leading, training and coaching the organization in its Scrum adoption (Correct) Planning and advising Scrum implementations within the organization (Correct) Removing barriers between stakeholders and Scrum Teams (Correct) Helping employees and stakeholders understand and enact an empirical approach for complex work (Correct) - Correct Answer The Scrum Master serves the organization in several ways, including: Leading, training, and coaching the organization in its Scrum adoption; Planning and advising Scrum implementations within the organization; Helping employees and stakeholders understand and enact an empirical approach for complex work; and, Removing barriers between stakeholders and Scrum Teams. When must an adjustment be made if an inspector determines that one or more aspects of a process has deviated outside of tolerable limits? As soon as possible to minimize further deviation (Correct)

The deviations should be discussed at the Daily Scrum and then an adjustment must be made (Incorrect) After Scrum Master approval After clarifying all the details with the Product Owner - Correct Answer If any aspects of a process deviate outside acceptable limits or if the resulting product is unacceptable, the process being applied or the materials being produced must be adjusted. The adjustment must be made as soon as possible to minimize further deviation. What is Scrum? A lightweight framework that helps people, teams and organizations generate value through adaptive solutions for complex problems. (Correct) A sequential design process, used in software development processes, in which progress is seen as flowing steadily downwards. A software development methodology which is intended to improve software quality. - Correct Answer Scrum is a framework for complex problems Who is allowed to make changes in the Product Backlog? Select two options. The Developers The Product Owner (Correct) The Scrum Master Anyone, but with permission of the Product Owner (Correct) The Key Stakeholders - Correct Answer The Product Owner is the sole person accountable for the Product Backlog. However, he or she can delegate some work related to product backlog management so long as he/she gives permission. Is Scrum an incomplete framework? Yes, Scrum is purposefully incomplete. It is built on the collective intelligence of the people using it, rather than providing detailed instructions. (Correct) No Scrum was developed in the 1990s and has many years to be refined and complete

  • Correct Answer The Scrum framework is purposefully incomplete, only defining the parts required to implement Scrum theory. Scrum is built upon by the collective intelligence of the people using it. Rather than provide people with detailed instructions, the rules of Scrum guide their relationships and interactions. Who in the Scrum team is responsible for monitoring progress toward high-level goals? The Scrum Master The Developers The Product Owner (Correct) The Scrum Master and the Developers

The Scrum Team - Correct Answer The Product Owner tracks total work remaining at least every Sprint Review. The Product Owner compares this amount with work remaining at previous Sprint Reviews to assess progress toward completing projected work by the desired time for the goal. This information is made transparent to all stakeholders. Which are all the opportunities to inspect and adapt. The Sprint Retrospective (Correct) The Sprint (Correct) The Sprint Planning (Correct) The Sprint Review (Correct) The Daily Scrum (Correct) - Correct Answer The Sprint is a container for all other events. Each event in Scrum is a formal opportunity to inspect and adapt Scrum artifacts. These events are specifically designed to enable the transparency required. Failure to operate any events as prescribed results in lost opportunities to inspect and adapt. The Scrum Guide does not include the Sprint as a formal event for inspection and adaption, but it may be considered an opportunity to inspect and adapt as it holds the other events. Who participates in the Sprint Review? Select all applicable. The Scrum Master (Correct) The Product Owner (Correct) The Developers (Correct) The Organization Senior Managers Stakeholders (Correct) - Correct Answer During the event, the Scrum Team and stakeholders review what was accomplished in the Sprint and what has changed in their environment. Scrum recommends using and adapting the Scrum components and rules that work for a particular project or team. Adjusting Scrum to work best for you is encouraged. False (Correct) True (Incorrect) - Correct Answer Each component within the Scrum framework serves a specific purpose and is essential to Scrum's success and usage. How is a "Developer" defined in the context of Scrum? Select the best option. Software and hardware developers

Development of an operational environment for the Product Architects, coders and all other technical people who contribute to the creation of applications and software Developers, researchers, analysts and scientists (Incorrect) Anyone that gets value from Scrum (Correct) - Correct Answer As Scrum's use spreads, developers, researchers, analysts, scientists, and other specialists do the work. We use the word "developers" in Scrum not to exclude, but to simplify. If you get value from Scrum, consider yourself included. "Developers, researchers, analysts and scientists" is not correct on because this is not an exhaustive list In the Daily Scrum the Scrum Master does which of the following? Select all that apply: Teaches the Developers to keep the Daily Scrum within the 15-minute time-box (Correct) Ensures the Team has the meeting (Correct) Is responsible for conducting the Daily Scrum If others are present at the Daily Scrum, ensures that they do not disrupt the meeting (Correct) - Correct Answer The Scrum Master ensures that the Developers have the meeting, but the Developers are responsible for conducting the Daily Scrum. Teaches the team to keep the Daily Scrum within the 15-minute time-box. If others are present at the Daily Scrum, ensures that they do not disrupt the meeting. Of the below which are correct statements that explain what happens during the Sprint? Sprint scope is defined at the Sprint Planning and cannot be changed Scope may be clarified and re-negotiated between the Product Owner and Developers as more is learned (Correct) Quality goals do not decrease (Correct) The Sprint Goal is changed frequently to reflect the status of the remaining work No changes are made that would endanger the Sprint Goal (Correct) - Correct Answer During the Sprint: No changes are made that would endanger the Sprint Goal Quality does not decrease The Product Backlog is refined as needed Scope may be clarified and renegotiated with the Product Owner as more is learned. True or False. It turned out there is a lot more work to do in the current Sprint than was estimated. If an item in the Sprint Backlog cannot be finished by the end of the Sprint, the Sprint is cancelled. False (Correct)

True - Correct Answer The Sprint is cancelled only in the case if the Sprint Goal became obsolete. If some work could not be done, the Sprint Backlog should be re- negotiated between the Product Owner and the Developers. What are the three pillars that uphold every implementation of empirical process control? Inspection (Correct) Cross-functionality Adaptation (Correct) Agility Self-organization Transparency (Correct) - Correct Answer Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge comes from experience and making decisions based on what is known. Three pillars uphold every implementation of empirical process control: transparency, inspection, and adaptation. Does the Daily Scrum help to eliminate the need for additional meetings? Yes (Correct) No - Correct Answer Daily Scrums improve communications, identify impediments, promote quick decision-making, and consequently eliminate the need for other meetings. The Daily Scrum is not the only time Developers are allowed to adjust their plan. They often meet throughout the day for more detailed discussions about adapting or re- planning the rest of the Sprint's work. What is Product Backlog Refinement? Select Adding details, such as a description, order, and size. (Correct) Adding User Stories and Story Points to the Product Backlog Items (Incorrect) The act of adding more detail to the items in the Product Backlog. With more detail the item is ready for the Sprint Backlog (Incorrect) The act of breaking down and further defining Product Backlog items into smaller more precise items (Correct) - Correct Answer Product Backlog refinement is the act of breaking down and further defining Product Backlog items into smaller more precise items. This is an ongoing activity to add details, such as a description, order, and size. Attributes often vary with the domain of work. Please note more detail is not necessarily better if that detail is confusing and offputting. Also, note the Scrum Guide does not mention the use of User Stories and Story Points. If they come up in the exam you can be sure it is an incorrect answer.

Who can help establish empirical product planning for a complex environment? The Scrum Team The Scrum Master (Correct) Experienced Managers The Product Owner - Correct Answer The Scrum Master serves the Product Owner in several ways, including: Helping find techniques for effective Product Goal definition and Product Backlog management Helping the Scrum Team understand the need for clear and concise Product Backlog items Helping establish empirical product planning for a complex environment Facilitating stakeholder collaboration as requested or needed What does Burn-down Chart show? Hierarchy of tasks that comprise a project Dependencies, start times and stop times for project tasks How much work remains till the end of the Sprint (Correct) The evolution of the amount of uncertainty during a project - Correct Answer Burn- down chart shows the evolution of remaining effort against time. What makes up Scrum (select four)? Burn-down charts Reports Events (Correct) Rules (Correct) Roles (Correct) Artifacts (Correct) - Correct Answer The Scrum framework consists of Scrum Teams and their associated roles, events, artifacts, and rules. Each component within the framework serves a specific purpose and is essential to Scrum's success and usage. The rules of Scrum bind together the events, roles, and artifacts, governing the relationships and interaction between them. Choose the correct order of items in the Product Backlog? Alphabetical The recently added items at the top The less clear items at the top At the Product Owner's discretion but usually the less valuable and most unclear items at the bottom

(Correct) - Correct Answer The Product Backlog needs to be in an order, this order is up to the Product Owner. It is common for the least detailed to be at the bottom and the most detailed at the top ready for selection into a sprint. What should the Developers do if the work needed in the Sprint to achieve the Sprint Goal turns out to be different than predicted at Sprint Planning? Discuss the situation with Management to obtain more resource and also ask the Product Owner to extend the Sprint timebox. Cancel the Sprint and enter into a new Sprint Planning immediately to begin a new Sprint Change the work items in the Sprint Backlog to reflect the work needed to complete the Sprint Goal Discuss with the Product Owner to negotiate the scope of the Sprint Backlog without affecting the Goal (Correct) - Correct Answer If the work turns out to be different than they expected, they collaborate with the Product Owner to negotiate the scope of the Sprint Backlog within the Sprint without affecting the Sprint Goal." What topics does the Sprint Planning aim to answer? Select Three. What new technologies could be used to speed up the development velocity? What is the size of the Technical Debt and how it could be removed? (Incorrect) Why is this Sprint valuable? (Correct) Who will be responsible for each item in the Sprint Backlog? How will the work needed to deliver the Increment be achieved? (Correct) What can be delivered in the Increment resulting from the upcoming Sprint? (Correct) - Correct Answer Sprint Planning addresses the following topics: Topic One: Why is this Sprint valuable? Topic Two: What can be Done this Sprint? Topic Three: How will the chosen work get done? Select the five Scrum Values. Focus (Correct) Commitment (Correct) Effectiveness Openness (Correct) Respect (Correct) Courage (Correct) - Correct Answer The Scrum Guide recognizes the following Scrum Values: commitment, courage, focus, openness and respect.

What are three purposes for the Daily Scrum? To inspect progress toward the Sprint Goal (Correct) To discuss solutions to problems in detail (Incorrect) To adjust the upcoming planned work (Correct) To explain all the discovered issues found yesterday to the Product Owner (Incorrect) To adapt the Sprint Backlog as necessary (Correct) - Correct Answer The purpose of the Daily Scrum is to inspect progress toward the Sprint Goal and adapt the Sprint Backlog as necessary, adjusting the upcoming planned work. Why does Scrum have a Sprint Retrospective? It is a meeting where the Developers synchronize activities and creates a plan for the next 24 hours It is the key inspect and adapt meeting It is a meeting to inspect the Increment and adapt the Product Backlog if needed It is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint (Correct) - Correct Answer The Sprint Retrospective is an opportunity for the Scrum Team to inspect itself and create a plan for improvements to be enacted during the next Sprint. Who is responsible for the creation of the Definition of "Done"? The Developers The Scrum Master The Scrum Team (Correct) The Product Owner (Incorrect) - Correct Answer If the Definition of Done for an increment is part of the standards of the organization, all Scrum Teams must follow it as a minimum. If it is not an organizational standard, the Scrum Team must create a Definition of Done appropriate for the product. All the Scrum Teams working on the same product should have the same Sprint length. True or false? - Correct Answer False. Scrum does not require having aligned Sprints for multiple teams. Which three are the most applicable characteristics of the Product Owner? Lead Scrum evangelist in the Organization Product Marketplace Expert (Correct) Facilitator of Scrum events

Lead Facilitator of Key Stakeholder Involvement (Correct) Product Value Maximizer (Correct) - Correct Answer Product Value Maximizer Lead Facilitator of Key Stakeholder Involvement Product Marketplace Expert Scrum Masters are true leaders who serve the Scrum Team and the larger organization, how does he or she serve the Product Owner? Select the four most appropriate. Helping establish empirical product planning for a complex environment (Correct) Understanding and practicing agility (Incorrect) Managing the stakeholders and senior manager engagement Helping find techniques for effective Product Goal definition and Product Backlog management (Correct) Facilitating stakeholder collaboration as requested or needed (Correct) Helping the Scrum Team understand the need for clear and concise Product Backlog items. (Correct) - Correct Answer From The Scrum Guide 2020, The Scrum Master serves the Product Owner by: Helping find techniques for effective Product Goal definition and Product Backlog management; Helping the Scrum Team understand the need for clear and concise Product Backlog items; Helping establish empirical product planning for a complex environment; and, Facilitating stakeholder collaboration as requested or needed. Who is responsible for managing the Product Backlog? The Developers The Key Stakeholders The Scrum Master The Product Owner (Correct) - Correct Answer The Product Owner is the sole person responsible for managing the Product Backlog If there are multiple teams working on a product but on different aspects of the development they must comply with the SAME Definition of Done. True of False? True (Correct) False - Correct Answer If there are multiple Scrum Teams working together on a product, they must mutually define and comply with the same Definition of Done. Select the two meetings in which people outside the Scrum Team are allowed to participate.

The Sprint Review (Correct) The Daily Scrum The Sprint Retrospective The Sprint Planning (Correct) - Correct Answer The Developers may invite other people to attend the Sprint Planning in order to provide technical or domain advice. The Product Owner is responsible for inviting the Key Stakeholders to the Sprint Review meeting What person or group has the authority to cancel the Sprint? The Product Owner and the Scrum Master The Scrum Master The Key Stakeholders The Developers The Product Owner (Correct) - Correct Answer A Sprint could be cancelled if the Sprint Goal becomes obsolete. Only the Product Owner has the authority to cancel the Sprint. Continue Retake test Course content Overview Q&AQuestions and answers Notes Announcements Reviews Learning tools