PTP Final Exam With 100% Correct And Verified Answers, Exams of Advanced Education

A comprehensive study guide or reference material for a final exam related to construction and building practices. It covers a wide range of topics, including job descriptions, construction materials and methods, safety regulations, building codes, and inspection checklists. The level of detail and the breadth of information suggest that this document could be highly valuable for students or professionals in the construction industry, particularly those preparing for exams or certifications. Clear and concise answers to numerous questions, making it a potentially useful resource for review, study, and exam preparation. Overall, this document seems to be a well-organized and informative reference that could be beneficial for those seeking to deepen their understanding of construction-related topics.

Typology: Exams

2024/2025

Available from 10/15/2024

Qualityexam
Qualityexam 🇰🇪

2.5

(4)

2.7K documents

1 / 7

Toggle sidebar

Related documents


Partial preview of the text

Download PTP Final Exam With 100% Correct And Verified Answers and more Exams Advanced Education in PDF only on Docsity!

PTP Final Exam With 100% Correct And

Verified Answers

PJM Job Description (3 things) - Correct Answer--Manage Subs -Manage Budget -Observe Quality E&S Binder (4 items inside) - Correct Answer--SWPPP (Stormwater Pollution Prevention Plan) -NOI (Notice of Intent) -Bi-Weekly Inspections -State General Permit -RLD's -Preconstruction Inspection and Review Code of Ethics (Production issues) - Correct Answer--accepting gifts -subs working for you on company time -purchasing something personal with the P card AFUE - Correct Answer-Annual Fuel Utilization Efficiency SEER - Correct Answer-Seasonal Energy Efficiency Rating SEP - Correct Answer-Standard Energy Package Concrete Washout (5 things to remember) - Correct Answer--Identify -Protect -Accessible -Signage -Stay off SSF - Correct Answer-Super Silt Fence -12G chainlink fence, 5' aluminum posts, plus SF Portajohn Distance rules - Correct Answer-50' uphill 15' downhill Heat Pump - Correct Answer-electrical system that reverses refrigerant to either heat or cool air before introducing it into the home 3 locations for weepholes - Correct Answer--under windows -every 24" along flashing -bottom of wall

Stone SEP - Correct Answer--Grade D paper behind -Keene Rain Screen -EZ Bead around windows -Weep Screed at bottom of veneer 5 trades for MM - Correct Answer--Roofing -Framing -HVAC -Stone -Brick Moisture Management - Correct Answer-specifies products and install for exterior wall assembly and moisture preventative measures Mold - Correct Answer-fungal growth on organic matter Ingredients for Mold - Correct Answer--temps 40 and up -organic matter -moisture -oxygen R value - Correct Answer-Thermal resistance to heat flow SEP Manual (where and what) - Correct Answer--can be found on the CPE -contains a list of all Standard Energy Practices Sill Sealer - Correct Answer--under bottom plate -between mudsill and foundation Construction Adhesive - Correct Answer--between joist and subfloor -in between grooves of subfloor -between subfloor and bottom plate -interior edge of bottom plate that touches the subfloor -interior where all panels meet Trim SEP - Correct Answer--Attic Access -Door Thresholds Drywall SEP - Correct Answer--tape and mud garage seams -adhesive at top plate seams Plumbing SEP - Correct Answer--insulate behind the tubs and showers (r-13) -insulate p traps above garage -insulate any lines in garage

-low flow faucets Heating SEP - Correct Answer--screw and mastic all ducts -caulk duct penetrations in floor/ceiling -hold ducts 12-14" or more above truss bottom chords -don't pinch ducts ELEC SEP - Correct Answer--plastic boxes on all exterior walls and ceilings -interior elec panel held 3.5" off wall for insulation behind -route wires to prevent compression of insulation -run wires in cathedral ceilings 12" above bottom chord -seal penetrations for junction box/ lamp post in fdn Insulation SEP - Correct Answer--foam windows -foam penetrations from trades -6 sides touching -Attic Insulation -cut around receptacles Framing SEP - Correct Answer--tyvek -sill sealer -construction adhesice -t-ply -solid block joists above garage -block/tply all chases/dropped ceilings/bulkheads -insulated headers 4 Components of BuiltSmart - Correct Answer--Comfort -Efficiency -Quality -Environment HERS - Correct Answer-Home Energy Rating System -the lower the # the better -Ryan avg around 70 4 Checklists Completed @ Final Builtsmart Inspection: - Correct Answer--Thermal Envelope -Water Management -HVAC Checklist -PEG Checklist 4 areas checked at Final BuiltSmart Inspection - Correct Answer--Attic Insulation -Register Boots -Broan Fresh Air Intake (plugged in, working) (flap cut outside) -Door sweep and weatherstripping

Duct Blast Inspection (items checked) - Correct Answer--Insulation -Air Seal -Ducts Taped and Mastic good -Thermal Shell Two PEG/ BuiltSmart Inspections - Correct Answer--Duct Blaster (before drywall) -Blower Door (before settlement) Three Primary Factors in Setting a House - Correct Answer--Surface Water Drainage (Critical Point) -Driveway Slope -Sewer Depth Three SECONDARY Factors in Setting a House - Correct Answer--Appearance -Economics -Functionality Sewer fall requirement - Correct Answer-1/4" fall or every 1' run Safety Violation Program (1-6 offenses) - Correct Answer-1. -notify contactor

  1. -proof of training by contractor
  2. -$100 fine
  3. -$250 fine
  4. -proof of training from contractor
  5. -$500 fine + meeting w Div. Manager and PM NVR Employee Safety Violations (1-4 Offenses) - Correct Answer-1. -verbal warning
  6. -written warning
  7. -2nd written warning + 30 day probation
  8. -termination What are Reserves? - Correct Answer-zeroing out a home towards closing -adding money in phases where late bills are coming in -removing over estimates What to AF for on Plot? - Correct Answer--driveway -stoop & steps -sod & landscaping -public walks? -sewer LF -Deck? OSHA - Correct Answer-Occupational Safety and Health Administration 6 Safety Items in Trailer - Correct Answer--extra hard hats

-first aid kit -injury report -protective eyewear -SDS -Fire Extinguisher -Hand sanitizer and extra masks Excavation Safety Violations - Correct Answer--no back up alarm or personnel -no trench box -egress every 25' -did not call miss utility -cave-ins Framing Safety Violations - Correct Answer--walking on top plates -not tied off -no proper bracing -temporary stairs -ladder safety (3 rungs above) -holes/openings in floor not covered properly Electrical Safety Violations - Correct Answer--not using fiberglass ladder -frayed cords -generator missing gfci -missing ground prongs Roofing Safety Violations - Correct Answer--improper harness use -improper ladder use (3 rungs) -tied off too far -tools not secured Footing and Foundation Safety Violations - Correct Answer--no back up alarm -no capping or bending of rebar -walking on top plates -no egress every 25' 4 Focus OSHA Inspections - Correct Answer--fall -caught between -struck by -electrical Double 2x10 floor joist nailing - Correct Answer-(2) rows of 16D nails 12" o.c. subfloor nailing pattern - Correct Answer-8D ring shank -6" o.c. @ the edge (8 nails total) -10" o.c. in the field (5 nails total)

painted lumber in RL pack -gray -pink -orange - Correct Answer-gray: added by division pink: p/o orange: safety Steel Beam W8x22x23'8" - Correct Answer-Wide Flange 8" tall 22lbs per foot 23'8" long Roof Sheathing Specs - Correct Answer--5/8" or 7/16" Oriented Stand Board -8D ring shank nail -6" o.c. @ edge and 10" o.c. in field -H-clips to be installed every 24" o.c. -1/8" spacing at all butt joints to allow for expansion LFSS - Correct Answer-Laminated Fibrous Structural Sheathing House wrap - Correct Answer--start 2" below mudsill -overlap 6" vertical -overlap 2" horizontally -taped with Cantech House Wrap Framing MM - Correct Answer--only NVR approved flashing tapes shall be used -block mechanical penetrations when needed -all doors and windows must be properly flashed -Z-flashingmust be installed over brick mold and flat trim doors -all flashing and house wrap to be installed in a shingle style pattern -al penetrations or damage to sheathing must be repaired and water tight -deck to be flashed per NVR drawings ACQ - Correct Answer-Alkaline Copper Quarternary -copper based chemical preservative to be used to pressure treat lumber and preserve it from decay and insect infestation Roof line device specs - Correct Answer--notified by * on plans -1"x3" opening for tie off -2"x2" hole is considered a hole by OSHA PFAS - Correct Answer-Personal Fall Arrest System SFP and SYP - Correct Answer--Spruce/ Pine/ Fur

-Southern Yellow Pine Purpose of Pre Construction Meeting - Correct Answer--transition from sales -confirm selections -set agenda NVR Home Visitation Policy - Correct Answer--must notify 48 hr in advance -no one under the age of 18 allowed on site -must be accompanied by NVR employee Opening Statement to customer - Correct Answer-1. Set Agenda

  1. Provide Benefits
  2. Gain Commitment Why is it important to establish the grade and swales at rough grade? - Correct Answer--make room for framing material -managing water Footing general specs - Correct Answer--8"x16" unless soil report states different -minimum 2500psi concrete -not to be poured unless 28 degrees and rising Driveway concrete - Correct Answer--minimum of 3500 psi concrete -minimum of 3.5" thick -must be air entrained Basement slab concrete - Correct Answer--minimum of 3000 psi concrete -minimum of 3.5" thick -on 6 mil poly, over 4" gravel base What is a footing designed to do? - Correct Answer--serve as a flat and level surface to disperse weight into the ground ppe - Correct Answer-Personal Protection Equipment psi - Correct Answer-pounds per square inch Foundation/ poured wall PSI - Correct Answer-3000 psi