Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

QSP Exam Questions and Answers With Complete Solutions 100% Correct 2024, Exams of Advanced Education

QSP Exam Questions and Answers With Complete Solutions 100% Correct 2024 What does this permit regulate? - Correct Answer-Discharges of pollutants in storm water associated with construction activity (storm water discharges) to waters of the united states from construction site that disturb one or more acres of land surface, or that are part of a common plan of development or sale that disturbs more than one acre of land surface. The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the __________ may also serve as the LRP. - Correct Answer-LUP Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP Guidance Handbook. - Correct Answer-True In the RUSLE equation, "P" stands for - Correct Answer-Management operations and support practices. Ma

Typology: Exams

2023/2024

Available from 06/27/2024

professoraxel
professoraxel 🇺🇸

3.8

(27)

9.7K documents

1 / 12

Toggle sidebar

Related documents


Partial preview of the text

Download QSP Exam Questions and Answers With Complete Solutions 100% Correct 2024 and more Exams Advanced Education in PDF only on Docsity! QSP Exam Questions and Answers With Complete Solutions 100% Correct 2024 What does this permit regulate? - Correct Answer-Discharges of pollutants in storm water associated with construction activity (storm water discharges) to waters of the united states from construction site that disturb one or more acres of land surface, or that are part of a common plan of development or sale that disturbs more than one acre of land surface. The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the __________ may also serve as the LRP. - Correct Answer-LUP Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP Guidance Handbook. - Correct Answer-True In the RUSLE equation, "P" stands for - Correct Answer- Management operations and support practices. pg. 1 professoraxe l Management operations and support practices. - Correct Answer-Management operations and support practices. When does risk level one has to sample? - Correct Answer- When required for non-visible pollutants. ATS instruments shall record which of the following? - Correct Answer-Flow, turbidity, and pH Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? - Correct Answer-K and LS Failure to obtain coverage under the permit for storm water discharges to waters of the US is a violation of the - Correct Answer-Clean Water Act and California Water Code For traditional construction projects the LRP may be - Correct Answer-The person who possesses real properly interest in the land upon which the construction activities will occur for the regulated site What does NTU measure? - Correct Answer-a measurement of optical properties of a liquid that cause light rays to be pg. 2 professoraxe l What weather forecast would trigger a reap? - Correct Answer-50% chance of rain, within 48 hours. During routine inspection a LUP discharger observes a non- stormwater discharge and therefore must prepare a non storm water report. - Correct Answer-UNSURE* but: False (no non-stormwater report exists?) What BMP does the permit discourage? - Correct Answer- Plastic cover (maybe sediment basin?) What factors are used for RUSLE? - Correct Answer-R, K, LS, C, P Which two best represent an ATS "mode of operation"? - Correct Answer-Flow through and Batch treatment What does NPDES stand for? - Correct Answer-National Pollutant Discharge Elimination System When shall a discharger conduct a construction site evaluation and run-on evaluation? - Correct Answer-Whenever the results from a storm event daily average indicate that the pg. 5 professoraxe l discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the turbidity NAL. You only have to cover waste containers prior and during a rain event. - Correct Answer-False (at the end of each day) Does this permit constitute a waiver of water quality certification under CWA section 401? - Correct Answer-answer unknown (yes, no, sometimes, when the site looks good) Run-on and Run-off controls are not required for? - Correct Answer-Risk level 1 projects and type 1 LUP projects The SWPPP shall be available? - Correct Answer-At the project site. Which BMP category should be used as the primary line of defense of erosion preventing? - Correct Answer-Soil stabilization. Bioassessment monitoring is an assessment of - Correct Answer-measure of the number and diversity of benthic macroinvertebrates in a water body. pg. 6 professoraxe l Which of the following are examples of erosion control? - Correct Answer-Protective blankets, wildflowers, and straw ATS stands for - Correct Answer-Active Treatment System For each day of discharge from a qualifying event, the absolute minimum number of pH and turbidity effluent samples is - Correct Answer-Three The primary goal of BMP implementation is to? - Correct Answer-Prevent or reduce the discharge of pollutants Other reputable sources may be substituted for NOAA weather forecasts - Correct Answer-False If required, when should risk level 1 sites conduct discharge sampling? - Correct Answer-During business hours Who is responsible for identifying the monitoring locations in the SWPPP? - Correct Answer-the QSD pg. 7 professoraxe l A discharger is considered covered by the construction general permit when - Correct Answer-PRDs have been filed **** unsure LRP stands for - Correct Answer-Legally responsible person Does this permit authorize discharges of fill or dredged material regulated by the US army cops of engineers under CWA section 404? - Correct Answer-No SWAMP stands for - Correct Answer-Surface Water Ambient Monitoring Program Non-visible pollutant monitoring is - Correct Answer-triggered by the potential for non-visible pollutants to be discharged from any project site. What is the CGP-approved method for pH analysis? - Correct Answer-Calibrated field meter A discharged shall ensure that a paper copy of each rain event action plan is - Correct Answer-Maintained onsite pg. 10 professoraxe l Visual monitoring of ATS is required to be conducted - Correct Answer-Daily When are Risk level 3 and LUP type 3 sites that directly discharge runoff to a freshwater wadeable stream(s) required to conduct bioassessment? - Correct Answer-When the site is greater than 30 acres Turbidity is measured in - Correct Answer-Nephelometric Units The LRPs approved signatory for the military must be - Correct Answer-Any military officer or department of defense civilian, acting in an equivalent capacity to a military officer, who has been designated Each project utilizing ATS shall have a site-specific operation and maintenance manual - Correct Answer-True What is the most common pollutant in runoff from construction sites? - Correct Answer-Sediment pg. 11 professoraxe l Offsite run-on monitoring may be required on - Correct Answer-risk level 3 sites The BMP requirements for Type 2 LUPs are found in - Correct Answer-Attachment D What is the primary federal law governing storm water pollution and regulation? - Correct Answer-Clean Water Act Visual monitoring is required for - Correct Answer-All projects pg. 12 professoraxe l