Download QSP Exam Questions with 100% Correct Answers | Verified | Updated 2024 and more Exams Advanced Education in PDF only on Docsity! QSP Exam Questions with 100% Correct Answers | Verified | Updated 2024 When does the CGP apply? - Correct Answer-Any construction or demolition of one acre or more Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands. - Correct Answer-C TRUE OR FALSE: if construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage - Correct Answer-True Risk Level 2 monitoring requirements include: pg. 1 professoraxe l a. Effluent sampling where applicable b. Sampling for pH and turbidity c. Sampling for pH, turbidity, and suspended sediments - Correct Answer-B All NAL data must be uploaded within ___ after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks - Correct Answer-C Who must file Permit Registration Documents (PRDs) prior to the commencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO - Correct Answer-B pg. 2 professoraxe l a. The degree to which the water loses its transparency due to the presence of suspended particulates b. the acidity or alkalinity of a solution c. the degree to which a chemical substance or a particular mixture of substances can damage an organism - Correct Answer-A The removal of a uniform thin layer of soil by raindrop splash or water run-off is... a. Splash Erosion b. Rill Erosion c. Sheet Erosion d. Wind Erosion - Correct Answer-C What elements of RUSLE are independent of location? a. K b. R c. LS d. C & P - Correct Answer-D pg. 5 professoraxe l What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)? a. Soil erodibility factor b. Management operations and support practices (sediment controls) c. Rainfall-runoff erosivity factor d. Length-slope factor e. Cover factor (erosion controls) - Correct Answer-B What is the difference of an LUP project in comparison to traditional projects? a. Erosion control is not needed. b. "Run-On/Run-Off" is not an objective. c. Sampling is not required. - Correct Answer-B TRUE OR FALSE: The SWPPP is a "living document" that is amended/updated to reflect conditions & reduce pollutants - Correct Answer-True Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after __days of inactivity. pg. 6 professoraxe l a. 3 b. 7 c. 10 d. 14 - Correct Answer-D Once identified, dischargers shall begin implementing repairs or design changes to BMPs: a. Immediately b. Within24 hours c. Within48 hours d. ASAP, but not more than 72 hours - Correct Answer-D The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) __ hours prior to any likely precipitation event. a. Immediately b. 24 hours c. 48 hours d. ASAP but not more than 72 hours - Correct Answer-C pg. 7 professoraxe l c. the contractor elects not to work and the site is "shut down" for a rainy day - Correct Answer-C What is the Numeric Action Level (NAL) for pH? a. 3.5-5.5 b. 6.0-9.0 c. 6.5-8.5 d. 9.0-12.0 - Correct Answer-C What is the exceedance trigger for Receiving Water Monitoring? a. 100 NTU b. 250 NTU c. 500 NTU d. 1,000 NTU - Correct Answer-C What system that uses chemical coagulation, chemical flocculation, or electro-coagulation to reduce turbidity? a. ATS b. CGP c. CWA pg. 10 professoraxe l d. NAL - Correct Answer-A If the R Factor is ____, you can apply for the Erosivity Waiver. a. 1 b. Less than 1 c. 5 d. Less than 5 - Correct Answer-D The R factor accounts for: a. Project location, length of construction period, and time of year b. Project schedule c. Historical rain events d. Potential pollutants on site - Correct Answer-A Which risk level must electronically submit all storm event sampling results to State Water Board no later than 5 days after the conclusion of the storm event? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 pg. 11 professoraxe l d. All Risk Levels - Correct Answer-C Which statement is true? Risk Level 2 sites: a. Are subject to all Risk Level 3 requirements b. Must electronically submit all NAL exceedance storm event sampling results to State Water Board no later than 10 days after the storm event c. Have 10 categories of year-round minimum BMP's d. Do not need to manage run-on or run-off controls - Correct Answer-B The REAP must be onsite during construction and available a. for a minimum of 1 Year b. for a minimum of 3 Years c. 72 hours prior to any likely precipitation event d. Until the end of the construction project - Correct Answer-B NEL Violation Reports must be submitted to State Board within 24 hours after exceedance has been identified. NEL's are only subject to: a. Risk Level1 pg. 12 professoraxe l TRUE OR FALSE: Discharges located within the watershed of an impaired water body, for which a TMDL for sediment has been adopted by the Regional Water Board or USEPA, must comply with the approved TMDL if it identifies "construction activity" or land disturbance as a source of sediment - Correct Answer-True A QSP is responsible for: a. Day to day implementation, inspections, and observations b. Amending the SWPPP as required c. Developing and certifying the SWPPP d. Certifying reports in SMARTS - Correct Answer-A Which projects must apply linear sediment controls along the face, toe, and grade breaks of exposed slopes? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. Risk Level 2 & 3 - Correct Answer-D Permit Registration Documents (PRDs) shall consist of all of the following except: pg. 15 professoraxe l a. Site Map b. Signed Certification Statement c. Risk Assessment d. Notice of Termination (NOT) e. Notice of Intent (NOI) - Correct Answer-D The FOUR phases of construction include, all of the following EXCEPT: a. Streets and Utility Phase b. Vertical Construction Phase c. Stormwater Sampling d. Grading and Land Development Phase e. Final landscaping and Site Stabilization Phase - Correct Answer-C What is an example of Housekeeping BMPs? a. Silt fence installation around the perimeter b. Waste management c. Covering inactive areas with hydroseed d. Installing fiber rolls along a slope - Correct Answer-B pg. 16 professoraxe l TRUE OR FALSE: A project may be terminated if construction activities have been suspended. - Correct Answer-True Within ____ of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. a. 24 hours b. 3 days c. 60 days d. 90 days - Correct Answer-D TRUE OR FALSE: A project may not be terminated if the permitted construction property is sold(property ownership has been transferred) prior to project completion - Correct Answer-False Acceptable methods to demonstrate final stabilization include: a. 50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method - Correct Answer-C pg. 17 professoraxe l