QSP EXAM STUDY EXAM QUESTIONS LATEST DOWNLOAD VERIFIED ANSWERS[2024-2025], Exams of Advanced Education

QSP EXAM STUDY EXAM QUESTIONS LATEST DOWNLOAD VERIFIED ANSWERS[2024-2025]

Typology: Exams

2024/2025

Available from 04/30/2025

tizian-mwangi
tizian-mwangi 🇺🇸

3.8

(6)

7.1K documents

1 / 20

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
1 / 20
QSP EXAM STUDY EXAM QUESTIONS LATEST
DOWNLOAD VERIFIED ANSWERS[2024-2025]
1. A likely precipitation event is any weather pattern that is forecasted
to have a % or greater probability of producing precipitation in
the project area.
a. 10
b. 25
c. 50
d. 75
e. 99: C
2. A QSP is responsible for:
a. Day to day implementation, inspections, and observations
b. Amending the SWPPP as required
c. Developing and certifying the SWPPP
d. Certifying reports in SMARTS: a. Day to day implementation, inspections,
and observations
3. A storm that produces ½ inch or more of precipitation, with a 48
hour or greater period between rain events is a/an...
a. Qualifying rain event
b. Extended storm event
c. Inactive storm event
d. Unsafe monitoring event: a. Qualifying rain event
4. A temporary or permanent structural BMP that directs concentrated
flows away from disturbed areas and prevents erosion is...
a. erosion control
b. run on/ run off control
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14

Partial preview of the text

Download QSP EXAM STUDY EXAM QUESTIONS LATEST DOWNLOAD VERIFIED ANSWERS[2024-2025] and more Exams Advanced Education in PDF only on Docsity!

QSP EXAM STUDY EXAM QUESTIONS LATEST

DOWNLOAD VERIFIED ANSWERS[2024-2025]

  1. A likely precipitation event is any weather pattern that is forecasted to have a % or greater probability of producing precipitation in the project area. a. 10 b. 25 c. 50 d. 75

e. 99: C

  1. A QSP is responsible for: a. Day to day implementation, inspections, and observations b. Amending the SWPPP as required c. Developing and certifying the SWPPP d. Certifying reports in SMARTS: a. Day to day implementation, inspections, and observations
  2. A storm that produces ½ inch or more of precipitation, with a 48 hour or greater period between rain events is a/an... a. Qualifying rain event b. Extended storm event c. Inactive storm event d. Unsafe monitoring event: a. Qualifying rain event
  3. A temporary or permanent structural BMP that directs concentrated flows away from disturbed areas and prevents erosion is... a. erosion control b. run on/ run off control

c. sediment control: b. run on/ run off control

  1. Acceptable methods to demonstrate final stabilization include: a. 50%vegetative coverage b. 100% vegetative coverage c. RUSLE 2 method: c. RUSLE 2 method
  2. Activities under the CGP include: a. Routine maintenance to maintain original line and grade, hydraulic capacity, or original purpose of the facility. b. Disturbances to land surfaces solely related to agricultural operations. c. Clearing and grading 2 acres of land d. Discharges of storm water from areas on tribal lands.: c. Clearing and grading 2 acres of land
  3. All NAL data must be uploaded within after NAL exceedance has been identified a. 24 hours b. 1 week c. 10 days d. 2 weeks: c. 10 days
  4. Certain non-storm water discharges may be necessary for the completion of construction projects. Therefore the General Permit authorizes such dis- charges provided they meet the following conditions except: a. Meet the NALs for pH and turbidity b. Not cause or contribute to a violation of water quality standards c. Comply with BMPs as described in the SWPPP d. Be infeasible to eliminate e. Causes or threatens to cause pollution, contamination, or nuisance: e. Causes or threatens to cause pollution, contamination, or nuisance

e. Notice of Intent (NOI): d. Notice of Termination (NOT)

  1. Project sediment risk is: a. the relative amount of sediment that can be discharged, driven largely by scheduling and site characteristics b. the risk sediment discharges pose to the receiving waters.: a. the relative amount of sediment that can be discharged, driven largely by scheduling and site characteristics
  2. Risk Level 2 monitoring requirements include: a. Effluent sampling where applicable b. Sampling for pH and turbidity c. Sampling for pH, turbidity, and suspended sediments: b. Sampling for pH and turbidity
  3. Stockpiles require a linear sediment barrier at all times, and must be covered prior to a rain event or when inactive. A stockpile is inactive after days of inactivity. a. 3 b. 7 c. 10 d. 14: d. 14
  4. The amount of eroded soil that settles out at a point in the watershed that is remote from the origin of the detached soil particles is... a. Rainfall Erosivity Factor b. Slope Length and Steepness Factors c. Soil Cover Factor d. Sediment Yield: d. Sediment Yield
  5. The discharger shall ensure a QSP develop a Rain Event Action Plan (REAP) hours prior to any likely precipitation event. a. Immediately b. 24 hours

c. 48 hours d. ASAP but not more than 72 hours: c. 48 hours

  1. The FOUR phases of construction include, all of the following EXCEPT: a. Streets and Utility Phase b. Vertical Construction Phase c. Stormwater Sampling d. Grading and Land Development Phase e. Final landscaping and Site Stabilization Phase: c. Stormwater Sampling
  2. The R factor accounts for: a. Project location, length of construction period, and time of year b. Project schedule c. Historical rain events d. Potential pollutants on site: a. Project location, length of construction period, and time of year
  3. The REAP must be onsite during construction and available a. for a minimum of 1 Year b. for a minimum of 3 Years c. 72 hours prior to any likely precipitation event d. Until the end of the construction project: b. for a minimum of 3 Years
  4. The removal of a uniform thin layer of soil by raindrop splash or water run-off is... a. Splash Erosion b. Rill Erosion c. Sheet Erosion d. Wind Erosion: c. Sheet Erosion

23. TRUE OR FALSE:

LUP projects are subject to post-construction requirements due to the nature of their construction to return project sites to preconstruction conditions.: - False

30. TRUE OR FALSE:

If construction of an LUP will occur across several properties, the utility company, municipality, or other public/private company/agency that owns or operates the LUP project is responsible for obtaining coverage: True

31. TRUE OR FALSE:

The SWPPP is a "living document" that is amended/updated to reflect condi- tions & reduce pollutants: True

32. TRUE OR FALSE:

LID's goal is to mimic a site's pre-development hydrology by using design and techniques that infiltrate, store, evaporate, and detain runoff close to its source.: True

  1. Upload photos to SMARTS that are taken during daily inspections of the LUP site before, during, and after every storm event a. First b. Second c. Third d. Fourth: c. Third
  2. Visual monitoring is required for non-storm water, pre-rain and post-rain at what Risk Levels? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. All of the above: d. All of the above
  3. What does the "P" stand for in the Revised Universal Soil Loss Equation (RUSLE)? a. Soil erodibility factor b. Management operations and support practices (sediment controls) c. Rainfall-runoff erosivity factor

d. Length-slope factor e. Cover factor (erosion controls): b. Management operations and support prac- tices (sediment controls)

  1. What elements of RUSLE are independent of location? a. K b. R c. LS d. C & P: d. C & P
  2. What is an example of Housekeeping BMPs? a. Silt fence installation around the perimeter b. Waste management c. Covering inactive areas with hydroseed d. Installing fiber rolls along a slope: b. Waste management
  3. What is the difference of an LUP project in comparison to traditional projects? a. Erosion control is not needed. b. "Run-On/Run-Off" is not an objective. c. Sampling is not required.: b. "Run-On/Run-Off" is not an objective.
  4. What is the exceedance trigger for Receiving Water Monitoring? a. 100 NTU b. 250 NTU c. 500 NTU d. 1,000 NTU: c. 500 NTU
  5. What is the Numeric Action Level (NAL) for pH? a. 3.5-5. b. 6.0-9. c. 6.5-8. d. 9.0-12.0: c. 6.5-8.
  6. What is turbidity?

d. U.S. Environmental Protection Agency (USEPA) e. California Environmental Quality Act (CEQA): a. Clean Water Act (CWA)

  1. Which risk level must electronically submit all storm event sampling re- sults to State Water Board no later than 5 days after the conclusion of the storm event? a. Risk Level 1 b. Risk Level 2 c. Risk Level 3 d. All Risk Levels: c. Risk Level 3
  2. Which statement is false? Bioassessment monitoring is required for pro- jects that meet all of the following, EXCEPT: a. Rated Risk Level 3/ LUP Type 3 b. Directly discharges runoff to a freshwater wadeable stream that is sediment impaired and has beneficial uses for cold, migratory, and spawn c. Requires post-construction stormwater treatment d. Total project-related ground disturbance exceeds 30 acres: c. Requires post-construction stormwater treatment
  3. Which statement is false? Monitoring is not required when: a. the site/sampling locations are unsafe to access due to the storm event b. it is outside of scheduled site operation hours c. the contractor elects not to work and the site is "shut down" for a rainy day: c. the contractor elects not to work and the site is "shut down" for a rainy day
  4. Which statement is true? Risk Level 2 sites: a. Are subject to all Risk Level 3 requirements b. Must electronically submit all NAL exceedance storm event sampling re- sults to State Water Board no later than 10 days after the storm event c. Have 10 categories of year-round minimum BMP's d. Do not need to manage run-on or run-off controls: b. Must electronically submit all NAL exceedance storm event sampling results to State Water Board no later than 10 days after the storm event
  1. Who must file Permit Registration Documents (PRDs) prior to the com- mencement of construction activity? a. Qualified SWPPP Developer (QSD) b. Legally Responsible Person (LRP) or the LRP's Approved Signatory c. Qualified SWPPP Practitioner (QSP) d. The CEO: b. Legally Responsible Person (LRP) or the LRP's Approved Signatory
  2. Within of when construction is complete or ownership has been transferred, the discharger shall electronically file a Notice of Termination (NOT), a final site map, and photos through the State Water Boards SMARTS system. a. 24 hours b. 3 days c. 60 days d. 90 days: d. 90 days
  3. A discharged shall ensure that a paper copy of each rain event action plan is CORRECT ANSWER: Maintained onsite: Maintained onsite
  4. A discharger is considered covered by the construction general permit when CORRECT ANSWER: PRDs have been filed **** unsure: PRDs have been filed **** unsure
  5. A discharger must notify the Regional Water Boards if there are planned changes in the construction activity that CORRECT ANSWER: May result in non-compliance: May result in non-compli- ance
  6. A qualifying storm event is

CORRECT ANSWER: Best Management Practice: Best Management Practice

  1. Construction general permit order DWQ-2009-0009 regulates storm water discharges from? CORRECT ANSWER: All linear utility projects and construction sites that disturb over 1 acre: All linear utility projects and construction sites that disturb over 1 acre
  2. Continuous monitoring (no less than 15-min intervals) of ATS is required for: CORRECT ANSWER: *****check: *****check
  3. CSMP stands for CORRECT ANSWER: Construction Site Monitoring Program: Construction Site Monitoring Program
  4. Do type 1 LUPs typically have a high potential to impact storm quality? Yes or No: No
  5. Does this permit authorize discharges of fill or dredged material regulated by the US army corps of engineers under CWA section 404? Yes or No: No
  6. Does this permit constitute a waiver of water quality certification under CWA section 401? CORRECT ANSWER: answer unknown (yes, no, sometimes, when the site looks good): answer unknown (yes, no, sometimes, when the site looks good)
  7. During routine inspection a LUP discharger observes a non- stormwater discharge and therefore must prepare a non storm water report. CORRECT ANSWER: UNSURE but: False (no non-stormwater report exists?)-* : UNSURE* but: False (no non-stormwater report exists?)

72. TRUE OR FALSE:

Each project utilizing ATS shall have a site-specific operation and mainte- nance manual: True

  1. Failure to obtain coverage under the permit for storm water discharges to waters of the US is a violation of the CORRECT ANSWER: Clean Water Act and California Water Code: Clean Water Act and California Water Code
  2. For each day of discharge from a qualifying event, the absolute minimum number of pH and turbidity effluent samples is CORRECT ANSWER: Three: Three
  3. For traditional construction projects the LRP may be CORRECT ANSWER: The person who possesses real properly interest in the land upon which the construction activities will occur for the regulated site: The person who possesses real properly interest in the land upon which the construction activities will occur for the regulated site
  4. If required, when should risk level 1 sites conduct discharge sampling? CORRECT ANSWER: During business hours: During business hours
  5. In the RUSLE equation, "P" stands for CORRECT ANSWER: Management operations and support practices.: Man- agement operations and support practices.

78. TRUE OR FALSE:

Inspection Records have to be kept until the project is complete or three years, whichever comes first.: False

  1. LRP stands for CORRECT ANSWER: Legally responsible person: Legally responsible person

89. TRUE OR FALSE:

Sediment basins, at a minimum, shall be designed according to the CASQA Construction BMP Guidance Handbook.: True

  1. SWAMP stands for CORRECT ANSWER: Surface Water Ambient Monitoring Program: Surface Wa- ter Ambient Monitoring Program
  2. The acronym LUP stands for CORRECT ANSWER: Linear underground/overhead project: Linear under- ground/overhead project
  3. The BMP requirements for Type 2 LUPs are found in CORRECT ANSWER: Attachment D: Attachment D
  4. The CGP allows for not monitoring under what conditions? CORRECT ANSWER: Dangerous weather conditions, unsafe storm event, and outside of scheduled operations.: Dangerous weather conditions, unsafe storm event, and outside of scheduled operations.
  5. The CGP requires the following monitoring elements for all risk levels CORRECT ANSWER: Visual monitoring, and monitoring of non-visible pol- lutants as needed: Visual monitoring, and monitoring of non-visible pollutants as needed
  6. The LRPs approved signatory for the military must be CORRECT ANSWER: Any military officer or department of defense civilian, acting in an equivalent capacity to a military officer, who has been designat- ed: Any military officer or department of defense civilian, acting in an equivalent capacity to a military officer, who has been designated
  1. The person in charge of the utility company, municipality, or other public or private company or agency that owns or operates the may also serve as the LRP.

CORRECT ANSWER: LUP: LUP

  1. The primary goal of BMP implementation is to? CORRECT ANSWER: Prevent or reduce the discharge of pollutants: Prevent or reduce the discharge of pollutants
  2. The SWPPP shall be available? CORRECT ANSWER: At the project site.: At the project site.
  3. Turbidity is measured in CORRECT ANSWER: Nephelometric Turbidity Units: Nephelometric Turbidity Units
  4. Monitoring is required for CORRECT ANSWER: All projects: All projects
  5. Visual monitoring of ATS is required to be conducted CORRECT ANSWER: Daily: Daily
  6. What BMP does the permit discourage? CORRECT ANSWER: Plastic cover (maybe sediment basin?): Plastic cover (maybe sediment basin?)
  7. What does NPDES stand for? CORRECT ANSWER: National Pollutant Discharge Elimination System: Na- tional Pollutant Discharge Elimination System
  8. What does NTU measure? CORRECT ANSWER: a measurement of optical properties of a liquid that cause light rays to be scattered and absorbed rather than transmitted in
  1. What is the primary federal law governing storm water pollution and regulation? CORRECT ANSWER: Clean Water Act: Clean Water Act
  2. What weather forecast would trigger a reap? CORRECT ANSWER: 50% chance of rain, within 48 hours.: 50% chance of rain, within 48 hours.
  3. When are Risk level 3 and LUP type 3 sites that directly discharge runoff to a freshwater wadeable stream(s) required to conduct bioassessment? CORRECT ANSWER: When the site is greater than 30 acres: When the site is greater than 30 acres
  4. When does risk level one has to sample? CORRECT ANSWER: When required for non-visible pollutants.: When required for non-visible pollutants.
  5. When is receiving water monitoring required for a risk level 3 site? CORRECT ANSWER: When there is a direct discharge to receiving waters* and effluent is outside the pH range of 6.0-9.0 or turbidity exceeds 500 NTU.: When there is a direct discharge to receiving waters* and effluent is outside the pH range of 6.0-9.0 or turbidity exceeds 500 NTU.
  6. When shall a discharger conduct a construction site evaluation and run-on evaluation? CORRECT ANSWER: Whenever the results from a storm event daily average indicate that the discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the turbidity NAL.: Whenever the results from a storm event daily average indicate that the discharge is below the lower NAL for pH, exceeds the upper NAL for pH, or exceeds the turbidity NAL.
  1. Which BMP category should be used as the primary line of defense of preventing erosion? CORRECT ANSWER: Soil stabilization.: Soil stabilization.
  2. Which factor(s) of RUSLE can be based on site-specific analysis rather than maps? CORRECT ANSWER: K and LS: K and LS
  3. Which factor(s) of RUSLE must be changed to recalculate risk when the construction duration has changed?

CORRECT ANSWER: R: R

  1. Which of the following are examples of erosion control? CORRECT ANSWER: Protective blankets, wildflowers, and straw: Protective blankets, wildflowers, and straw
  2. Which risk level/type may be required to sample for non-visible pollu- tants CORRECT ANSWER: All risk level/types: All risk level/types
  3. Which two best represent an ATS "mode of operation"? CORRECT ANSWER: Flow through and Batch treatment: Flow through and Batch treatment
  4. Who is responsible for identifying the monitoring locations in the SWP- PP? CORRECT ANSWER: the QSD: the QSD
  5. You only have to cover waste containers prior and during a rain event. CORRECT ANSWER: False (at the end of each day): False (at the end of each day)