Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Safe 5.0 SPC practice test -with 100% verified solutions-2024-2025 .docx, Exams of Computer Science

Safe 5.0 SPC practice test -with 100% verified solutions-2024-2025 .docx

Typology: Exams

2023/2024

Available from 07/26/2024

studyguru
studyguru 🇺🇸

4.2

(5)

1.7K documents

1 / 47

Toggle sidebar

Related documents


Partial preview of the text

Download Safe 5.0 SPC practice test -with 100% verified solutions-2024-2025 .docx and more Exams Computer Science in PDF only on Docsity!

Safe 5.0 SPC practice test -with 100% verified

solutions-2024-202 5

During what Program Increment (PI) planning activity are Architects most likely to revise the architecture Vision?

  • Business Context
  • Management review and problem solving
  • Planning Adjustments
  • Architecture vision and development practices Correct answer is : Management review and problem solving Why is the Continuous Integration aspect important to product delivery? It reduces the cost and risk of deferring quality issues:
  • It guarantees products function properly in the production environment
  • It contains all governance and compliance activities
  • It reduces the cost and risk of deferring quality issues
  • It ensures the delivery pipeline is fully automated Correct answer is : C (It reduces the cost and risk of deferring quality issues)

What is the key component that every Enabler Epic should have :

  • List of required Features and Capabilities
  • Detailed return on investment (ROI) analysis
  • Hypothesis Statement
  • References to relevant architecture specifications: Correct answer is : C (Hypothesis Statement) What is the primary purpose of Strategic Themes?
  • To describe a business model at a level of fidelity that privides understanding and invites innovation.
  • To optimize value and Solution integrity with capacity allocation
  • To help ensure the right investment are being made with the approved budget
  • To connect the portfolio to Enterprise Strategy Correct Answer is : D (To connect portfolio to Enterprise Strategy) Organizing around Value Streams provides what two benefits to an organization (choose two):
  • Smaller Teams
  • Ability to run more ART’s concurrently
  • Shorter time to market
  • Higher productivity
  • Repeatable processes. Correct answer : B and C (Shorter time to market, Higher productivity) What does an Epic Require?
  • Implementation over a single PI
  • Development work at the Program Level
  • Definition by System Architect Correct Answer is : D (A definition for minimum viable product) When should a Story be considered complete?
  • The nonfunctional requirement have been identified
  • The nonfunctional requirement are put into the Solution Intent
  • The nonfunctional requirement have passed their tests
  • The nonfunctional requirement have been put into related Stories, Correct Answer : C The non functional requirement have passed their tests How can Architects serve as Lean-Agile leaders?
  • By respecting people and teams
  • By establishing model coding standards
  • By attending leadership training
  • By decentralizing all architectural decisions Correct Answer : A (By respecting people and teams)

Are milestones part of a Roadmap?

  • Yes; but they are limited to the Program Increment (PI) Roadmap
  • No; only Capabilities, Features and Enablers are part of a Roadmap.
  • No; Roadmaps should not be influenced by events with fixed dates
  • Yes; they are important events that impact the ability to achieve the solution vision Correct Answer : D (Yes; they are important events that impact the ability to achieve the solution vision) During which activity do Architects provide teams feedback on the actual value delivered from architecture work?
  • Value stream mapping
  • PI Planning
  • Scrum of scrums
  • Inspect & Adapt Correct Answer : D (Inspect and Adapt)

A Solution Architect is participating in post-Program Increment (PI) Planning and wants to make sure specific inter-Agile Release Train dependencies uncovered during the PI planning are made visible. What is the next step?

  • Update the program board
  • Update the Solution Intent
  • Update the Solution Backlog
  • Update the Solution board Correct Answer:? What two benefits does value stream mapping provide in the Continuous Delivery Pipeline (choose two):
  • It identifies major bottlenecks in the delivery process
  • It illustrates the cost of development at each stage
  • It defines the optimal organizational structure
  • It communicates to the Customer how their product is made
  • It visualizes the flow of work through the entire system Correct answer :?

In what two ways do the principles of cadence and synchronization apply to the Portfolio Level (Choose two):

  • By ensuring continual Solution releases
  • By fostering problem solving for the Value Stream
  • By allowing management of the Program Backlog
  • By fuelling the learning cycle
  • By ensuring flow through the Epic Kanban system Correct answer :? What is an example of an Architect applying system thinking principles:
  • Participation in Inspect & Adapt activities
  • Prioritization of the highest business values
  • Enabler wring split into manageable Stories
  • Collaboration with experts in adjacent domains Correct answer :? What is one aspect of the Architect’s role during Iteration Review?
  • Demonstrate the integrated Solution
  • Demonstrate emergent design
  • Gauge alignment with coding standards
  • Gauge alignment with Solution Intent Correct answer is : D (Gauge alignment with Solution Intent) What is the difference between PI Roadmaps and Solution Roadmaps?
  • PI Roadmaps forecast two PIs, and Solution Roadmaps forecast four PIs
  • PI Roadmaps are ART-driven, and Solution Roadmaps are architectural driven.
  • PI Roadmaps show Features, and Solution Roadmaps show Epics
  • PI Roadmaps show an ART’s events, and Solutions Roadmaps show Epics. Correct answer is : C ( PI Roadmaps show Features, and Solution Roadmaps show Epics)

How does the Architectural Runway account for emergent design?

  • Teams define the runway
  • Teams evaluate the intentional architecture
  • Teams grow system design as Feature require
  • Teams use Features to build the runway. Correct answer :? Not sure which is the correct answer. For sure ‘Teams evaluate the intentional architecture and ‘Teams use Features to build the runway’ are wrong Which describes how Architects perform as Lean-Agile leaders?
  • Reinforcing SAFe core values and principles
  • Demonstrating how traditional project management is the best option
  • Measuring technology success based on cost
  • Supporting centralization of decision-making Correct answer : A (Reinforcing SAFe core values and principles) What is a common flow impediment?
  • Distributed systems
  • Architecture review boards
  • Flexible timelines
  • Regulated process Correct answer : B (Architecture Review Boards) What would a System Architect most likely demo at an Iteration Review?
  • Architectural documentation
  • Coding Standards
  • Business functionality
  • Intentional Architecture

Correct answer : Business functionality Which do Program Backlogs contain?

  • Epics and Enablers
  • Stories and Enablers
  • Features and Enablers
  • Capabilities and Enablers Correct Answer :? What is an attribute of Agile architecture
  • It supports continuous flow
  • It is the responsibility of System Architects
  • It involves microservices
  • It is a phase-gated process Correct answer : A (It supports continuous flow)

The correct order of the components in the Inspect and Adapt event?

  • Quantitative Metrics, System Demo, problem-solving workshop, retrospective.
  • Problem-solving workshop, Quantitative Metrics, retrospective, System Demo
  • System Demo, Quantitative Metrics, retrospective, Problem-solving workshop
  • Quantitative Metrics, problem-solving workshop, retrospective, System Demo Correct Answer is : C Which Lean quality management systems (QMS) strategy ensures Agile Release Trains include all necessarily compliance knowledge?
  • Build in quality and compliance
  • Continuously verify compliance and validate
  • Build Solutions and compliance incrementally
  • Organize for value and compliance. Correct answer :?

In what two ways do Solution Trains enable dependant Agile Release Trains (ARTs) to collaborate and deliver more effectively (Choose two)

  • By ensuring Suppliers deliver against Milestones
  • By centralizing Solution design decisions
  • By centralizing all compliance activities
  • By aligning ART-s to a common Solution vision
  • By Aligning ARTS on a common cadence. Correct answer :? Which roles are most likely to collaborate to develop Strategic Themes?
  • Enterprise architect, Product Management and Lean Portfolio Management
  • Solution Architect, Lean Portfolio Management, portfolio stakeholders
  • Enterprise Architect, Lean Portfolio Management, portfolio stakeholders
  • Solution Architect, Product Management, Lean Portfolio Management Correct Answer is : Enterprise Architect, Lean Portfolio Management, portfolio stakeholders

Which statement describes a Roadmap?

  • A schedule of events for planned deliverables over a timeline
  • A short term view of the Solution and deliverables schedule
  • A set of procedures for current use
  • A detailed view of current team PI activities Correct Answer : A (A schedule of events for planned deliverables over a timeline)

Correct answer :?

Program PI Objectives from all ARTs;Solution planning board;Solution risks; What are the three inputs to the Solution post-PI Planning? (Choose three.)

Correct answer: A(By aligning ARTs to a common Solution Vision) and B (By aligning ARTs on a common cadence)

PI Roadmaps show Features, and Solution Roadmaps show Epics What is the difference between PI Roadmaps and Solution Roadmaps?

What criteria should be considered when defining non-functional requirements? Bounded, independent, negotiable, testable A schedule of events for planned deliverables over a timeline Which statement describes a Roadmap?

What is the best way for a System Architect, working closely with the Product Incorporate the right Enablers Manager on an Agile Release Train, to contribute to the Program Increment (PI) Roadmap? To ensure a healthy balance of business Features and Architectural Runway investment Why is it important for an Architect to contribute to backlogs and prioritization?

What is one of the outputs of pre-PI Planning? Determine a set of Features for every ART

Swarming on problems that are impeding the Agile Release Train(s) Which activity occurs regularly at the Architect sync? It identifies major bottlenecks in the delivery process;It visualizes the flow of work through the entire system; What two benefits does value stream mapping provide in the Continuous Delivery Pipeline? (Choose two.)

Which is an attribute of Agile architecture? It supports continuous flow What does an Epic require? A definition for minimum viable product

This is wrong : What items need to be on the Program Roadmap?;What benefits will it provide?; This is also wrong : What will the Solution do?;What new Strategic Themes are needed?; Correct answer : Business functionality