Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Stormwater Pollution Prevention Plan (SWPPP) Questions and Answers, Exams of Advanced Education

A series of multiple-choice questions and answers related to the development and implementation of a stormwater pollution prevention plan (swppp). It covers key aspects of swppp regulations, including the identification of potential pollution sources, best management practices (bmps), and compliance requirements under the clean water act. Useful for individuals involved in construction projects, particularly those seeking to understand their responsibilities in managing stormwater runoff and preventing pollution.

Typology: Exams

2024/2025

Available from 12/31/2024

Academician
Academician ๐Ÿ‡บ๐Ÿ‡ธ

4.1

(17)

3.9K documents

Partial preview of the text

Download Stormwater Pollution Prevention Plan (SWPPP) Questions and Answers and more Exams Advanced Education in PDF only on Docsity!

Developing Your Stormwater Pollution Prevention

Plan Questions and Answers

A Stormwater Pollution Prevention Plan (SWPPP) is a site-specific written document that _______. A. describes practices to reduce pollutants in stormwater discharges from the construction site reduction of pollutants B. identifies potential sources of stormwater pollution at the construction site C. identifies procedures the operator will implement to comply with the terms and conditions of a construction general permit D. All of the above - โœ”โœ”โœ” - D. all of the above 2 The primary stormwater pollutant at a construction site is _______. A. trash and debris B. oil and grease C. sediment D. pesticides and chemicals - โœ”โœ”โœ” - C. sediment 2 Which of the following is not a structural BMP (best management practice) used to prevent stormwater pollution? A. silt fences

B. picking up trash and debris C. temporary seeding D. erosion control blankets - โœ”โœ”โœ” - B. picking up trash and debris 3 The Clean Water Act requires nearly all construction site operators engaged in clearing, grading, and excavating activities that disturb _______ acre(s) or more to obtain coverage under a National Pollutant Discharge Elimination System (NPDES) permit for their stormwater discharges. A. 1 B. 1. C. 2 D. 3 - โœ”โœ”โœ” - A. 1 4 Which of the following would NOT be required to obtain NPDES permit coverage for their stormwater discharges? A. a contractor that is responsible for overseeing actual earth disturbing activities and daily implementations of the SWPPP, but is not responsible for any changes to site plans, SWPPPs, or stormwater conveyance or control designs B. a property owner that designs the structures for the site, develops and implements the SWPPP, and serves as the general contractor C. Subcontractors hired by, and under the supervision of, the owner or a general contractor D. none of the above, all are required to obtain NDPES permit coverage - โœ”โœ”โœ” - C. Subcontractors hired by, and under the supervision of, the owner of a general contractor

Construction site operators generally obtain coverage under an NPDES permit, often by filling a form called a _________. A. Construction General Permit (CGP) B. Notice of Intent (NOI) C. Multi-Sector Generic Permit (MSGP) D. Discharge Monitoring Notice (DMN) - โœ”โœ”โœ” - B. Notice of Intent (NOI) 6 and 32 The first step in developing an SWPPP is _______. A. Determine who will be on your stormwater pollution prevention team B. Determine your SWPPP objectives C. Develop an outline for your SWPPP D. Evaluate your proposed construction site and identify measures to protect natural features - โœ”โœ”โœ” - D. Evaluate your proposed construction site and identify measures to protect natural features 10 Vehicle/equipment use and storage can cause which of the follow poluntants? A. Oil and grease

B. Sediment C. Heavy metals D. All of the above - โœ”โœ”โœ” - A. Oil and grease 12 Sec table Which of the following is NOT a primary means of preventing stormwater pollution? A. Protect slopes B. Retain sediment on-site and control dewatering practices C. Control stormwater flowing onto and through the project D. Phase construction activity - โœ”โœ”โœ” - B. Retain sediment on-site and control dewatering practices 17 Designated washout areas for concrete, paint and stucco operations should be located at least ________ yards away from storm drains whenever possilbe. A. 150 B. 100 C. 75 D. 50 - โœ”โœ”โœ” - D. 50 25-

Your construction general permit describes the minimum frequency of inspections which is typically weekly or bi-weekly and after each rainfall event exceeding _______ inch A. 1/ B. 1/ C. 1 D. 1.5 - โœ”โœ”โœ” - B. 1/ 28 You must keep copies of the SWPPP, inspection records, copies of all reports required by the permit, and records of all data used to complete the NOI to be covered by the permit for a period of at least ________ year(s) from the date that permit coverage expires or is terminated. A. 1 B. 2 C. 3 D. 4 - โœ”โœ”โœ” - C. 3 30 and 39