SWPPP TEST 2025 WITH 100% VERIFIED QUESTIONS AND EXPERT SOLUTIONS., Exams of Water and Wastewater Engineering

SWPPP TEST 2025 WITH 100% VERIFIED QUESTIONS AND EXPERT SOLUTIONS| GUARANTEED VALUE AND SUCCESS.

Typology: Exams

2024/2025

Available from 02/07/2025

prof_dave
prof_dave 🇺🇸

1

(1)

1.3K documents

Partial preview of the text

Download SWPPP TEST 2025 WITH 100% VERIFIED QUESTIONS AND EXPERT SOLUTIONS. and more Exams Water and Wastewater Engineering in PDF only on Docsity!

SWPPP TEST 2025 WITH 100% VERIFIED QUESTIONS

AND EXPERT SOLUTIONS| GUARANTEED VALUE

AND SUCCESS.

  1. The law that set into place stormwater regulations in the 1970s is - correct answer - The Clean Water Act
  2. Regulations for managing stormwater activity on a construction site are outlined in the - correct answer - NPDES
  3. When should you read and understand your project stormwater pollution prevention plan - correct answer - Immediately after the project awarded and before you begin any site work is
  4. Which of the following is not an allowable stormwater discharge or non- stormwater discharge - correct answer - Discharges are contaminated groundwater
  1. Construction activity may begin - correct answer - When the jurisdiction of operation specifies you can start
  2. Waters that sell anti-degration standards are placed on the _______ list
    • correct answer - 303D
  3. SWPP certifications are signed by - correct answer - An officer of the project owner or an officer of the general contractor.
  4. TRUE OR FALSE: The document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT - correct answer - False
  5. The notice of termination can be filed when - correct answer - All construction inside and outside of the building is completed and the final stabilization has been verified as complete
  1. Factors that may impact the SWPPP scheduling activities include - correct answer - Weather and climate
  2. Pollutant sources on a construction site may include (3) - correct answer - 1. petroleum storage tanks
    1. Masonry material
    2. soil amendment
  3. The following considerations may be incorporatedd into SWPPP - correct answer - Endangered species and historical preservation
  4. If you beileve BMP modifications are necessary onsite you must, - correct answer - Seek written approval of the project SWPPP designer and project owner
  5. The SWPPP will contain the following (3) - correct answer - 1. Erosion and sediment control bet management practices
    1. A site specific sequence of construction activiites
    2. site maps
  1. Once a site has experienced a rain event of measurable quantity you must identify - correct answer - Deficit and fialed BMP's and repair
  2. The document that contains the permit number is - correct answer - The permit authorization letter
  3. The portion of the the SWPPP that specifies the content of the SWPPP is - correct answer - The table of contents
  4. The document in the SWPPP that certifies the GC's commitment to compliance with the SWPPP - correct answer - The SWPPP certification letter
  5. The certifactions letter that identifies the name and contact information of subcontractors on the site is - correct answer - The subcontractors certification form
  1. Scheduling - correct answer - Aids in protecting the site by timing construction activities
  2. Factors to consider when creating your schedule include - correct answer - Account for the time it takes to install or implement BMP's between each phase of construction
  3. When installing perimeter BMP controls - correct answer - Note to locations and dates for installation on site map
  4. Stormwater issues are usually discussed during the pre-con meeting include - correct answer - SWPPP BMP's and construction schedule
  5. Sediment control devices must be installed - correct answer - Down slope of construction areas and functioning as designed prior to beginning land disturbing activities
  1. If you have stormwater inlets in your construction roadway - correct answer - Consult your project SWPPP to ensure you are protecting inlets properly
  2. Soil stock piles and other disturb areas must receive - correct answer
    • Temporary stabilization if they will remain in active for more than 14 days and potentially fewer days depending on the jurisdiction
  3. In the process of transitioning form Lan development to building construction it is important to - correct answer - Implement specific BMP's to address potential pollution associated with construction materials
  4. The SWPPP sequence of activities can be modified - correct answer - After consulting the project SWPPP designer and or project owner and receiving approval
  1. Erosion and sedimentation control principle do not include which of the following - correct answer - Leave unprotected openings for stormwater and sediment to leave site
  2. In active areas on a construction site must be temporarily stabilized within - correct answer - 14 days
  3. The following control is a source that treats soil as an non-relatable source that has value and should be kept in its place - correct answer - Erosion control
  4. TRUE OR FALSE: Well designed site specific erosion and sediment control BMP's require no inspection or maintence - correct answer - False
  5. A system of erosion and sediment control BMP's is often called a - correct answer - Treatment train
  1. Accelerated erosion that is most often caused by - correct answer - Humans
  2. Of the following factors of erosion the one a contractor has the most control over - correct answer - ground cover
  3. Of the following the one that is primary erosion and sediment control objective - correct answer - Minimize the extent and duration of soil exposure stablize to start areas quickly
  4. If you have questions or concerns about the BMP's specified in your project SWPPP you should - correct answer - contact your SWPPP designer
  5. When installing and maintaining a check dam make sure - correct answer - The low point of the check that was in the middle of a channel
  1. A common potential pollutant in a vehicle maintence area is - correct answer - Petroleum
  2. Which material management practice may address both sediment and dust control - correct answer - street cleaning
  3. Temporary stabilization should be implemented - correct answer - On all disturbed areas that will remain in active for 14 days or more
  4. A key first step before installing a roll erosion control product of our RECP is - correct answer - Properly preparing the ground surface
  5. Which of the following ground covers is best applied to moderate to steep slopes and in stormwater conveyances - correct answer - rolled erosion RECPS
  1. What percentage vegetation density is typically required to establish for stabilization - correct answer - 70%
  2. When inspecting silt fence look for all but one of the following defenciencies deficiencies - correct answer - Track out
  3. A fiber roll or wattle is intended to - correct answer - Capture sediment from a seat for low and slow runoff velocity
  4. Which of the following is not considered when removing temporary sediment basins - correct answer - Keep the overflow or spillway in tact
  5. The primary purpose of a construction exit - correct answer - To remove sediment from the consrtuction site vehicles and prevent track out construction