Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

VA CONTRACTORS LICENSE QUESTIONS WITH CORRECT DETAILED ANSWERS 2024., Exams of Nursing

VA CONTRACTORS LICENSE QUESTIONS WITH CORRECT DETAILED ANSWERS 2024.

Typology: Exams

2024/2025

Available from 09/03/2024

TOPGradeBooster.
TOPGradeBooster. 🇺🇸

3.5

(48)

3.8K documents

1 / 9

Toggle sidebar

Related documents


Partial preview of the text

Download VA CONTRACTORS LICENSE QUESTIONS WITH CORRECT DETAILED ANSWERS 2024. and more Exams Nursing in PDF only on Docsity! 1 VA CONTRACTORS LICENSE QUESTIONS WITH CORRECT DETAILED ANSWERS 2024. What is the minimum distance from exposed ground for a wood framing member that is in contact with?? - ANSWER-24 inches What is the maximum allowed slope for the top surface of a footing? - ANSWER-None Where should a drip edge be used? - ANSWER-Beneath the underlayment What is the minimum height for guard rails for balcony? - ANSWER-36 inches What test is performed to determine the drainage capacity of a soil? - ANSWER- Perculation test- Perc Test What is the minimum width of footings used for a one story structure build on claye sand soil used in conventional light frame construction! - ANSWER-12 inches What is the maximum allowable span for a three ply 2" x 12" build up floor girder for an interior bearing wall in a one story frame home 28 feet wide? - ANSWER-8 ft 10 inches When a joist is notched at the bottom to bear on a ledger the notch in the joist should be a maximum of ? - ANSWER-1/4 of the depth of the joist When are roof drains required? - ANSWER-When the roof has parapet walls What are the actual measurements of a standard size modular concrete block ? - ANSWER-7 5/8 in height and 7 5/8 width times 15 5/8 length In re-roofing applications metal flashing to which bituminous materials are to be adhered shall be? - ANSWER-Primed Soil that has expansion characteristics should? - ANSWER-Should not be used for Backfill Concrete cured with a proper moisture and a favorable temperature typically achieves what percentage of specified compressive strength after 7 days ? - ANSWER-60-75% The minimum headroom for a stairway is measured vertically from the ? - ANSWER- Sloped plane a adjoining the tread nosing 2 What is the maximum spacing between studs of a 2 x 4 framed interior partition supporting roof and ceiling only? - ANSWER-24 inches What is assumed to be the load bearing capacity of clay soil if no test are required or made? - ANSWER-1,500 pounds per square ft Who is responsible for training employees about the hazards of working in confined spaces? - ANSWER-Employer What is the maximum on center spacing of vertical reinforcement for a 12 inch nominal thickness reinforced concrete foundation wall? - ANSWER-72 inches A trench must have an adequate protection system if its depth is a minimum of how many feet? - ANSWER-5 ft How many bundles of three tab shingles are contained in a square of roofing? - ANSWER-Three Who should inspect a trench daily for safety? - ANSWER-A competent person What is the first thing an individual should check before entering a confined space? - ANSWER-Availability for breathable air Wood shims should not be used to level beams and girders because they are? - ANSWER-Compressible What is the maximum vertical spacing of drywall screws used to fasten 1/2 inch gypsum drywall without adhesive to an interior wall framed 16 inches on center? - ANSWER-16 inches What is the minimum width for a platform scaffold? - ANSWER-18 inches The most common method of attaching concrete and Clay tile to roof Decks are? - ANSWER-Mechanical fastening systems Asphalt shingles base and cap flashing may be? - ANSWER-Corrosion resistant metal, .019 inch thick Which is added to concrete in hot weather to make it set up slower? - ANSWER- retardant Which of the following is a true statement about the effect of wet material when unloading a scraper? - ANSWER-It decreases dumping time 5 What materials are used in mortar mix? - ANSWER-Hydrated lime, cement, water, fine aggregate When applying for an excavation permit what is the starting time and waiting period before work can begin? - ANSWER-7 AM and 24 hours A roof pitch is considered steep at what pitch? - ANSWER-4:12 What is the maximum outside dimension of a type one circular cross-section hand rail? - ANSWER-2 inches What is the standard mortar joint between concrete and masonry units CMU? - ANSWER-3/8 When using asphalt shingles in a valley without metal flashing what is the following method of installation? - ANSWER-Install an 18 inch strip of roll roofing placed over the underlayment nailed 1 inch from edges then placed a 36 inch wide strip of roll roofing over the 18 inch strip When an excavation permit is issued for use at 7 AM 24 hours after application how many days is the permit good for - ANSWER-14-15 days Where is ceilings without attic space that does not allow sufficient space for the required insulation the minimum required insulation shall not be less than? - ANSWER-R-30 Text where people may fall more than how many inches below their location where they are standing are required to have guards? - ANSWER-30 Bridging in floor joist is required when? - ANSWER-Exceeds depth of 2x12 Underlayment plywood which is touch-sanded at the mill ensures that the plywood is? - ANSWER-A uniform thickness Choice that are toe nailed to the bearing wall must be nailed with - ANSWER-3-8d nails Using number to Southern Pine for floor joist what is the size required for a span of 14 feet! - ANSWER-12x8 Look out our horizontal members that extend out end up a rake roof framing is generally what size? - ANSWER-2x4 When framing around a chimney what is the minimum Wood to masonry clearance required? - ANSWER-2 inches Window sizes for the designated structure are found on what document? - ANSWER- Window schedule 6 When installing an interior door frame, the frame must be? - ANSWER-Be flush with the wall finish on both sides What is the minimum bearing of a beam resting on a masonry wall? - ANSWER-3 inches What is the closest to the edge that a hole may be drilled in a floor joist? - ANSWER-2 inches What is required for the trimmers and headers of the lumber surrounding an opening for an attic drop down stair that measures 5 x 4-6! - ANSWER-Headers and trimmers must be doubled The end joints in the top plate are required to be offset by at least?? - ANSWER-24 inches A window used for second-floor emergency egress should have the following measurements? - ANSWER-Sill height 44 inches above floor and opening area of no less than 5.7 ft.² What is required to support masonry veneer above an opening? - ANSWER-Lintel What is the required area of glazing as a percentage of the floor area? - ANSWER-8 % What is the maximum slope allowed for a ramp? - ANSWER-1 in 12' What would show the front, back, right and left side of a structure? - ANSWER- Elevation What size window is required in a bathroom if there is no mechanical ventilation? - ANSWER-3 sq ft What is the term for the basic starting point of a building? - ANSWER-Benchmark What material is required for the door of an ash dump clean out? - ANSWER-Cast iron What is the definition of condensation - ANSWER-The process of vapor turning into liquid Where is the location of vapor retarder installation! - ANSWER-The warm side of the assembly - condensation occurs at warm side What is the minimum size of an egress door? - ANSWER-3 feet What is the first thing that must be done prior to demolishing a building? - ANSWER- Notify utility company 7 What is the minimum number of toilet facilities required for work crew of 21? - ANSWER-One toilet seat and one urinal per 40 workers What is a palister ? - ANSWER-A projection resembling columns Veneer ties shall be horizontally spaced apart no more than? - ANSWER-32 inches What is the required air space between the sheathing and the veneer? - ANSWER- Minimum of 1 inch and a maximum of 4 1/2 inches How many square feet of ventilation will be required for a 30' x 50' house constructed over a crawlspace with a class 1 vapor retarder installed over the ground surface? - ANSWER-1 sq ft What is the maximum allowable slope in type C soil? - ANSWER-1 1/2:1 What is the minimum period Between applying a finish coat for a three coat interior plaster after the second coat? - ANSWER-To finish coat within 48 hours What is the minimum distributed life load for a deck? - ANSWER-40 pounds per square foot Where is the frieze board located? - ANSWER-Under the soffit What is the minimum compressive strength of concrete for a garage floor slab in severe weathering? - ANSWER-3500 pounds per square inch, air entrained What is the maximum required set back of the face of a structure from the toe of a slope? - ANSWER-H/2 and 15 ft Concrete games 100% of its design strength and how many days - ANSWER-28 days A line on a drawing is composed of long and short dashes. What is the name of these lines? - ANSWER-Centerline A wall on a drawing with a scale of 1/4 equals 1 foot measures 5 1/2 inches. How long is the wall in feet? - ANSWER-22 feet What is the minimum distance from edge of trench that is allowed to place materials and equipment? - ANSWER-2 feet The more R value means? - ANSWER-Slower the heat transmits our travels through it (materials ability to resist heat transmission) What is the maximum size of a building in a lot of 90 feet wide and 120 feet deep front setback is 30 feet, rare setback is 15 feet, and side setback is 10 feet? - ANSWER-70x75