Docsity
Docsity

Prepare for your exams
Prepare for your exams

Study with the several resources on Docsity


Earn points to download
Earn points to download

Earn points by helping other students or get them with a premium plan


Guidelines and tips
Guidelines and tips

Virginia Contractors Practice Test Questions and Answers, Exams of Engineering

A set of practice questions and verified answers related to virginia contractor licensing requirements. It covers topics such as licensing penalties, joint ventures, application requirements, contractor recovery funds, building regulations, and erosion control. Useful for individuals preparing for the virginia contractor licensing exam.

Typology: Exams

2024/2025

Available from 11/13/2024

Academician
Academician 🇺🇸

4.2

(15)

3.9K documents

1 / 3

Toggle sidebar

Related documents


Partial preview of the text

Download Virginia Contractors Practice Test Questions and Answers and more Exams Engineering in PDF only on Docsity!

Virginia Contractors Practice Test Questions

With Verified Answers.

What is the MAXIMUM penalty for a contractor who undertakes work without the proper class of license? - ✔✔✔- $500 fine. Which of the following is a requirement for a joint venture? - ✔✔✔- Either the joint venture or each contracting party of the joint venture must be licensed. The application for licensure MUST include - ✔✔✔- the business address of the proposed designated employee. All Class A contractor licensure applications MUST include - ✔✔✔- information on the knowledge, skills, and abilities of the applicant. When a claimant is paid funds from the Contractors Recovery Trust Fund - ✔✔✔- the contractor's license is revoked. All of the following must be licensed EXCEPT - ✔✔✔- a material supplier who advises a contractor. What is the PRIMARY purpose of licensing? - ✔✔✔- Protect the health and welfare of the public. A firm desiring to be licensed as a Class B contractor MUST have a MINIMUM net worth of - ✔✔✔- $15,000.

A licensee's name change MUST be reported to the Board within a MAXIMUM of how many days? - ✔✔✔- 30 days. According to the Board Rules and Regulations, which of the following could be a qualified individual? - ✔✔✔- Any full-time employee. How much is the Class A initial license fee? - ✔✔✔- $ According to the Board Rules and Regulations, a full-time employee is one who works a MINIMUM of how many hours per week? - ✔✔✔- 30 hours. Who is to be in charge of a local building department? - ✔✔✔- Building official. A building official MUST issue a certificate of occupancy for a building that meets all the requirements for a certificate within a MAXIMUM of how many working days after the certificate was requested? - ✔✔✔- 5 An appeal of the local building official's decision to refuse to grant a modification to the USBC MUST be made to the local building board within a MAXIMUM of how many days? - ✔✔✔- 90 days. Additions to buildings MUST comply with - ✔✔✔- the current code for new construction. When MUST the work be stopped following the issuance of a stop work order? - ✔✔✔- Immediately

Contractors will be assessed a fee for the Transaction Recovery Fund whenever the fund balance is less than - ✔✔✔- $400,000. A contract for which of the following types of structures may be subject to recovery from the Transaction Recovery Fund? - ✔✔✔- Residential only. A verified claim for payment from the Transaction Recovery Fund MUST occur within a MAXIMUM of what period of time from the date the claimant was awarded a final judgment? - ✔✔✔- 12 months. Contractors who are assessed a fee to support the Transaction Recovery Fund MUST pay this fee within a MINIMUM of how many days from when the assessment fee notice was mailed? - ✔✔✔- 45 days. Payments made by the Transaction Recovery Fund to claimants may include an amount for - ✔✔✔- attorneys' fees. An appeal of a final decision of a county on an erosion control plan MUST be filed within a MAXIMUM of how many days? - ✔✔✔- 30 days. Temporary erosion and sediment control measures MUST be removed within a MAXIMUM of how many days after the final site stabilization? - ✔✔✔- 30 days.