Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
Wastewater Class B Texas QUESTIONS WITH 100% CORRECT ANSWERS Wastewater Class B Texas QUESTIONS WITH 100% CORRECT ANSWERS Wastewater Class B Texas QUESTIONS WITH 100% CORRECT ANSWERS
Typology: Exams
1 / 16
The name of the State Agency responsible for enforcing pollution control laws in Texas -
The minimum separation between sewer lines and potable water lines is -
consistently does best job possible, practices personal safety, strives to improve job knowledge, strives to keep the plant and collection system in the best appearance and working order
The results of Biochemical Oxygen Demand (BOD) sample taken at a treatment plant
ago Which of the following are dangerous gasses that are likely to be present in lift stations
sulfide and carbon dioxide
Hydro Jet Cleaner
hydrogen peroxide to the collection system
approved monitoring device and check for the presence of dangerous gasses, ventilate the space with a blower, wear a safety harness and attach a life line A properly designed and operated primary sedimentation tank should remove _____
Devices that may be used to determine the level of sewage in a lift station -
What is the most important role of aerobic bacteria in the treatment of wastewater? -
beds, solid bowl centrifuge, gravity thickener Most important to providing adequate sewage treatment in a stabilization pond -
Offensive and objectionable odors which sometimes occur in trickling filters usually
Dissolved Oxygen (DO) in aeration tank of an activated sludge plant should be
breaks in the main lines, high ground water levels, heavy rains, hydro jet cleaning plugged mains
longer moving liquid
biological treatment process
Needs to be checked regularly to properly operate an activated sludge treatment plant -
pipes or ditches that are monitored, controlled and inspected
intermittent, dispersed flows having little or no control The Texas Water Code establishes the protection of water quality and quantity of the
discharges, identifies non-point source controls, and establishes water reuse.
Chapter ___ of the Texas Water Code is the state law controlling water pollution and
and Texas Commission of Environmental Quality The Texas Commission on Environmental Quality can revoke an operator's license if
neglects their duty If accidental discharge, bypass, or spill (SSO) of wastewater occurs the responsible
Anaerobic Bacteria _____ live with O2 present in the water for their metabolism -
Facultative Bacteria require__________in the water for their metabolism -
greases, dissolved oxygen, O2 Demand, pH, and gasses
filtration
animals or humans
Dangerous gases are produced during bacterial decomposition of organics in
carbon dioxide and methane
Each person contributes approximately ______ lbs of BOD to the system daily. -
commercial, food processing, agricultural and industrial A sewer manhole provides access into the system for cleaning or service. A manhole is
direction and intersection New manholes must have an inside diameter of at least ______ feet and the entry
inches In the past ____ was used to construct manholes. This product is prohibited for
Verified clay and Poly Vinyl Chloride (PVC) are the most common pipe materials used
ductile iron, cast iron, acrylontrile butadiene styrene (ABS) Concrete, polyethylene & asbestos concrete Whenever wastewater cannot flow to the treatment plant by _____ a _____ is typically
The primary cause of stoppage in a collection system is _____ and _____ -
centrifugal
primed
Methane ______ are the smallest , most numerous, and most important of the activated sludge
Organic loading refers to the pounds per day of ____ per acre feet or 1,000 cubic feet of
Hydraulic loading refers to the volume of ____, including recirculation, applied to the
Standard rate (1-4 mgd) and High Rate (10-40 mgd)
____________gas is greenish-yellow, pungent, heaver than air and highly toxic -
V-Knotch
for water in the system after heavy rains If the ____ loading on the plant is high, the operator would need to ____Dissolved
30 minute settling test Organic loading of a stabilization pond is about ____ pounds of BOD/acre/day with a
Anaerobic digesters are covered to keep out ____, and to trap useful methane which
Unstable anareobic sludge contains streaks of _________ or ________. -
Aerobic digestion is an ____process whereby the aerobic bacteria consume themselves
Landfill applied sludge must have a solids content of at least _________percent -
Calcium Hypochlorite (HTH) is a strong _______ and reacts violently with _________. -
When ammonia is present in wastewater and reacts with chlorine_________are formed
Besides disinfection, chlorine has other uses at the wastewater treatment plant such as
purple
Before entering a manhole the operator should test for ________and oxygen levels and
gasses and ventilate When a municipal wastewater effluent has a high nitrate level and low ammonia level
degree of aerobic treatment
volatile solids This treatment device is commonly used to separate and remove large solids from raw
___________would have an adverse effect on the proper settling of solids in a clarifier.
What gases are produced by the controlled anaerobic digestion of wastewater sludge's -
These diseases are caused by pathogenic organisms that may be present in raw
cholera, gastroenteritis, polio, hookworm and giardiasis During heavy rain it is possible that manholes and lift stations may overflow, discharge waste materials into roadways or ditches. This type of discharge (SSO) would be -
Texas Water Code, a bypass that must be reported within 24 hours and considered a health hazard An effective way for the collection system worker to prevent infection by waterborn
avoid direct contact with waste water
Extensive use of garbage disposals (grinders) in a community would likely have the
amount of flow, solids, and grease The minimum size for a gravity flow sewer line on city right-of-way and the minimum
The most accurate way to find the average wastewater flow rate in an existing 10-inch
field data What is the greatest advantage for using fiberglass manholes in areas with high
A __________ pump would most likely be used when discharging into a 10" diameter
Trench safety is a great concern in Texas. OSHA requires that anytime an excavation is
In an excavation if a ladder is used as a means of exit, it must extend ________feet above the ground and be secured and within ____ feet laterally of anyone in the
A ____________ would be the best to determine if a storm drain is connected to a
_________ would most commonly be used to seal a number of joint leaks on a main
fine screening, grinding and grit removal and grease removal and pre-aeration
tanks or basins, scum collection and removal, sludge collection and removal
Stabilization ponds, trickling filters, rotating biological contractors (RBC) & activated sludge
Manholes
Treatment
Beneficial way to reuse treated effluent TCEQ may authorize discharge of untreated wastewater into or near a receiving stream
Enforcement action from TCEQ may be taken if pollution or waste violates the Texas
Unauthorized discharge, accidental discharge & health hazard
Suspended (TSS), Dissolved (TDS), Settleable (SS), Non-setteable, Floatable, Organic and Inorganic
filtered out
filtered out
standing for extended periods of time
settle
burning the residue from the Total Solids determination
grit, & minerals and can be suspended or dissolved Organic matter in wastewater can be ______or________and makes up approximately
treatment organisms
become inactivated but others continue to work resulting in a sick biological process
sewage is kept in a sedimentation basis
Filter floor, underdrain, walls, filter media, & distributer arms
where organisms bacteria, fungi, protozoa and ciliates thrive.
BOD Removed
Wastewater Stabilization Ponds are an approved process for wastewater treatment.
BOD/Acre/Day with a minimum of 30 days detention time Wastewater Stabilization Ponds work through a complex process which includes -
aerobic surface layer and an anaerobic bottom layer Typically one could expect ____ % BOD removal in a Facultative Lagoon -
Approximately 9 inches
Most pumping stations and electrical equipment used today in wastewater collection or
(Alternating Current) & 100 or 208 To avoid electrical shock, the operator should ________ if they are experiencing
problem to a trained electrical repairperson and do not attempt to check fuses or open
the disconnect box and Notify the power provider and let them send out a serviceman to assure the problem is not on the provider's side. When using Hydraulic Hydro Jetting sewer cleaning equipment the operator will want to go from a _______ manhole and clean toward the stoppage to avoid _________. -
businesses The Activated Sludge Process can produce a high degree of treatment. Typically one
Aerobic In the activated sludge process aeration tanks provide the space necessary to _______,
aerate, & Hold Influent
biologically converted to water, carbon dioxide, or new cells In the activated sludge process, the _______ is called the heart of the activated sludge
In the activated sludge process, factors that will influence the operation of the final
solids, rate of return & Wasting In the activated sludge process, the clarifier will concentrate return sludge and waste sludge about ___ to__ times the solids concentration of the mixed liquor -
In the activated sludge process, for the clarifier to do its job, the ____ must be retained
water/ solids
In the activated sludge process, as more mixed liquor flows to the clarifier, the thickness
In the activated sludge process, biological solids from the bottom of the clarifier must be returned to the aeration basin for re-seed. This process is accomplished by -
Screw pumps & Gravity Flow In the activated sludge process, no sludge process will work properly without -
Maintaining the balance between Return Sludge Flow, Return Sludge, Aeration tank volume, Mixed liquor suspended solids In the activated sludge process, the terms F/M ratio is important because this refers to -
In the activated sludge process, the F/M Ratio is calculated by ______ the pounds of
In the activated sludge process, Gould Sludge Age (GSA) is calculated by -
pounds of TSS entering the aerator as raw In the activated sludge process, the term Mean Cell Residence Time (MCRT) refers to -
In the activated sludge process, daily observation of the aeration basin treatment
In the activated sludge process, daily observation of the final clarifier is also essential.
scum, Sludge blanket, Weir Flow, Rising solids, & Clarifier overflow
In the activated sludge process, five (5) Important control parameters are -
quality, Rate of returned sludge, & Wasting rate In the activated sludge process, Dissolved Oxygen levels throughout the aeration basins are measured using a portable DO meter. The operator should keep DO levels
In the activated sludge process, "Classic Bulking" is a common problem typically
In the activated sludge process, Sludge Rising differs from "Sludge Bulking" and
nitrification process In the activated sludge process, techniques used to reduce "Frothing & Foaming"
amount of air, Spraying the frothing area with water, Applying de-foaming agents In the activated sludge process, floc is very important to the settling process. Floc is
Animals, & Fungi In the activated sludge plants, the operator will experience problems. Some of the
capacity, Equipment failures, Design inadequacies, Poor maintenance, & Inflow rates exceed plant capacities. In the activated sludge plants the operator will experience problems. Some of the
overloading, and under loading, Hydraulic overloading, Solids washout during storm inflow, Toxic substances, Shock loads, & Nutrient deficiencies In the activated sludge plants, the operator will experience problems. Some common
improper operating techniques In the activated sludge plants, the operator will experience problems. Some common
System pH out of range, & Excessive algae growth
In the activated sludge plants, to properly set the clarifier return rate the operator must
blanket thickness, & the Solids concentration of the return flow
to 40 days In the activated sludge plant, good quality sludge will settle _________& _______ over
20 minutes In the activated sludge plant, old sludge quality will settle ________& _________ over
minutes. In the activated sludge plant, there are (5) important nitroen transformation processes
Ammonification, Nitrification, Denitrification, & Nitrogen fixation. __________in the effluent from an activated sludge process is a pollutant and may
Denitrification occurs in an activated sludge system when there is __________ to
The lack of _________ triggers the facuitative bacteria to change from aerobic and
When the upward movement of the water in the clarifier exceeds the downward settling velocity In the activated sludge system, Hydraulic Wash Out can be controlled by -
reduction In the activated sludge system, if the operator observed Boiling action, Violent turbulence throughout the aeration tank surface, Large air bubbles 1/2 inch or greater,
high DO and or floc shearing therefore the operator should reduce the air SCFM to get DO into the proper range In the activated sludge system if the operator observed uneven surface aeration, dead
In the activated sludge system, if the operator observes white thick billowing sudsy foam
Overloaded aeration tank and or excessive sludge wasting In the activated sludge system, if the operator observes excessive air being used with no apparent change in organic or hydraulic loading, the operator would suspect -
organic loading
To determine the approximate number of gallons per day being discharged to the