Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Community
Ask the community for help and clear up your study doubts
Discover the best universities in your country according to Docsity users
Free resources
Download our free guides on studying techniques, anxiety management strategies, and thesis advice from Docsity tutors
A comprehensive set of questions and answers related to the west virginia contractors license exam. It covers a wide range of topics, including building materials, construction requirements, code compliance, inspections, and more. The questions are designed to test the knowledge and understanding of individuals seeking to obtain a contractors license in west virginia. Detailed explanations for the correct answers, making it a valuable resource for those preparing for the exam. The questions cover a variety of areas, such as building code requirements, construction methods, safety regulations, and permit procedures. By studying this document, individuals can gain a thorough understanding of the key concepts and requirements necessary to successfully pass the west virginia contractors license exam.
Typology: Exams
1 / 9
MW bricks HHCorrect Answers HHUsed in areas prone to freezing but not wet
SW bricks HHCorrect Answers HHUsed in areas that are wet and prone to freeing
Minimum compressive strength in psi for concrete basement slab with negligible weathering potential HHCorrect Answers HH 2500
An accessory structure is a structure not greater than how many square feet HHCorrect Answers HH3,
What is the R value insulation requirement for a residential floor climate zone 3 HHCorrect Answers HH 19
What is the minimum width of each door opening in inches for a :Means of egress Door" HHCorrect Answers HH 32
Exterior wood framing walls shall be a minimum of what grade wood HHCorrect Answers HH 3
HHCorrect Answers HH
A permit becomes invalid if the work authorized by the permit does not begin in ___ days.
D. 365 HHCorrect Answers HH 180
The building permit shall be kept on site until work is complete HHCorrect Answers HHTRUE
When shall a final inspection be conducted?
A. After the permit is issued B. After permitted work is complete C. After the occupants move in D. Upon beginning the permitted work HHCorrect Answers HHAfter permitted work is completed
Which of the following is not required on a site plan? A. Location of the new construction B. Distance from lot lines C. Traffic control plan D. Location of existing structures HHCorrect Answers HHTraffic control plan
How long must you retain approved construction documents after the work is completed? HHCorrect Answers HH180 days
Who is authorized to establish a refund policy for permit fees? HHCorrect Answers HHbuilding official
You are allowed to continue work safely after a stop work order has been ordered HHCorrect Answers HHFALSE
Which of the following is required in a certificate in occupancy?
A. Name and address of owner B. Name of Building official C.Edition of the code permit was issued under D. All of th above HHCorrect Answers HHAll of the above
Who appoints the building official from the department of building safety HHCorrect Answers HHchief appointing authority of the jurisdiction
What do you do When there is a conflict and different sections of the IBC specify different materials HHCorrect Answers HHUse the most restrictive guidance
Live loads for floors and roofs must be posted by the owner when they exceed ___ PSF
A. 25 B. 30 C. 50 D. 100 HHCorrect Answers HH 50
A permit is not valid until...
A. It is approved B. The fee has been paid C. It is posted at the site D. The site plan has been posted HHCorrect Answers HHThe fee has been paid
Who has the authority to authorize temporary utility connections HHCorrect Answers HHBuilding official
A detached 400 square foot storage shed does not require a permit.
A. TRUE B. FALSE HHCorrect Answers HHFALSE
Footing and foundation inspections should occur...
A. Prior to construction B. During the design phase C. After excavation is complete and rebar is installed D. After excavation is complete but prior to rebar installation HHCorrect Answers HHafter excavation is complete and rebar is installed
What is the maximum slope of a ramp HHCorrect Answers HH12 to 1
A drill hole for piping or a conduit shall be a minimum of how many inches from the top and bottom of the floor joist HHCorrect Answers HH 1
After the first coat is applied when should the second coat of cement plaster be applied HHCorrect Answers HH48 hours
Exhaust ducts associated clothes dryers shall terminate outside of buildings HHCorrect Answers HHtrue
electrical equipment intended to interrupt current at fault levels shall have a minimum interrupting ratio of how many amperes HHCorrect Answers HH10,
All metal face plates should be grounded HHCorrect Answers HHTRUE
Switching devices must be located less than 5 feet from the inside walls of the pool HHCorrect Answers HHFALSE
In West Virginia what should be done to cancel a bond HHCorrect Answers HHProvide advance notice
Floor registers of vented floor furnaces shall be at least how many inches from the wall HHCorrect Answers HH 4
A dwelling less than 500 square feet need not have a shower HHCorrect Answers HHfalse
What is the minimum clearance required in front of a toilet in inches HHCorrect Answers HH 21
A skylight is sloped at ___ degrees or more vertical.
A. 10 B. 12 C. 15 D. 20 HHCorrect Answers HH 15
Footings are not required to extend below the frost line when the monthly mean temperature of the area is ___ degrees Fahrenheit.
D. 68 HHCorrect Answers HH 64
Subsoil storm drains shall not be less than ___ inches in diameter.
A. 3 B. 4 C. 6 D. 8 HHCorrect Answers HH 4
A vacation timeshare property is in Residential Group R HHCorrect Answers HHTRUE
If an unsafe condition is found, the building official can deliver a written notice by all of the following except A. By hand B. Certified mail C.Tape on door of building HHCorrect Answers HHTape on door of building
In a group H-5 Building, the minimum width of a service corridor must be 5 feet or how many inches wider than the widest cart used in the corridor HHCorrect Answers HH 33
What is the minimum height above and below mezzanine structure in feet? HHCorrect Answers HH 7
Sprayed fire resistant materials are all of the following except A.Cementitious B.Asphaltic CFibrous HHCorrect Answers HHAsphaltic
A report of geotechnical investigation must contain all of the following except A.Location of tests B.Soil profile C.Temperature during test D Elevation of water table HHCorrect Answers HHTemperature during test
What is the shear value in pounds per square foot for 1/2 inch gypsum board with framing spaced at 16" OC HHCorrect Answers HH 90
What is the maximum slope limit of safety for permanent fill HHCorrect Answers HH2 to 1
What is the maximum interior design temperature used for heating load calculations HHCorrect Answers HH 72
What maximum interior design temperature used for cooling load calculations HHCorrect Answers HH 75
Nebraska is located in the moist area of the US HHCorrect Answers HHTRUE
What is the R value insulation requirment for a residential floor in climate zone 3 HHCorrect Answers HH 19
Pools heated to more than 90 degrees F shall have a pool over with a minimum R value of what HHCorrect Answers HH 12
A duct tightness test is not required for Ian air handler if it is located in a conditioned space HHCorrect Answers HHTRUE
Above grade walls are at least what percent above grade HHCorrect Answers HH 50
A curtain wall located in climate zone 3 requires a U factor of what HHCorrect Answers HH0.
What is the minimum pipe insulation thickness in inches for a steam pope greater than 1.5 inches in diameter HHCorrect Answers HH 3
Automatic lighting shut off is required in buildings larger than how many square feet HHCorrect Answers HH 5000
A skylight is a glass material installed at a slope of how many degrees or greater HHCorrect Answers HH 15
Supply ducts in attics shall be insulated to a minimum R vale of what? HHCorrect Answers HH 8
Attics containing appliances do not need a clear opening and an unobstructed passageway large enough for the removal of the appliance HHCorrect Answers HHFALSE
An accessory structure is a structure not greater than how many square feet HHCorrect Answers HH3,
Plumbing fixtures with concealed slip joint connecti0ons must have an access panel at least how many inches in diameter HHCorrect Answers HH 12
The location of plumbing, piping, fixtures, and equipment shall not interfere with windows or doors HHCorrect Answers HHTRUE
A vented floor furnace shall have a trap door not less than how many square feet HHCorrect Answers HH4.