COUNTY ID NUMBER ROUTE NO LENGTH TYPE OF WORK DESCRIPTION PHASE TYPE
OF
FUND
TOTAL
PHASE
COST
FEDERAL
PORTION
FISCAL
YEAR
SCHEDULE
ADAIR 8-1068 KY 704 0.01 11.905 11.913 AM - BRIDGE (P) ADDRESS DEFICIENCIES
OF BRIDGE ON KY 704
(11.909) OVER PETTY'S
FORK. (001B00078N)(SD)
DBR/STP 175,000
2019
KEY TO INTERPRETING INFORMATION PRESENTED
FOR FY 2019- FY 2022
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM
(STIP)
COUNTY WHERE
PROJECT IS
LOCATED
KYTC PROJECT
IDENTIFICATION
NUMBER
ROUTE
LENGTH
(MILES)
SCOPE OF
PROJECT
DESCRIPTION
STAGE OF PROJECT
DEVELOPMENT:
P = PLANNING
D = DESIGN
R = RIGHT OF WAY
U = UTILITY RELOCATION
C = CONSTRUCTION
PHASE COST OR
TOTAL COST IN
YEAR OF
EXPENDITURE
AMOUNT OF
FEDERAL
DOLLARS
FY SCHEDULE;
FISCAL YEAR IN WHICH PHASE ACTIVITY
SHOULD COMMENCE. FOR EXAMPLE, FY-2019
BEGINS JULY 1, 2018 AND ENDS JUNE 30, 2019
FOR STATE PROJECTS. FOR FEDERAL-AID
PROJECTS, FY 2019 BEGINS OCTOBER 1, 2018
AND ENDS SEPTEMBER 30, 2019.
EXAMPLE:
TYPE OF FUNDS TO BE UTILIZED FOR THE PROJECT, ABBREVIATED AS FOLLOWS:
BMP EMP
BEGINNING
MILEPOINT
ENDING
MILEPOINT
PRIORITY
ASSET
MANAGEMENT
PRIORITY OF
PROJECT
FEDERAL
PORTION
108,500
BRIDGE REPLACEMENT
JP2 BRAC BOND PROJECTS SECOND PROGRAM
FEDERAL CONGESTION MITIGATION
FEDERAL FOREST HIGHWAY
HIGH PRIORITY PROJECTS
FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY
FEDERAL NATIONAL HIGHWAY PERFORMANCE PROGRAM (NHPP)
PREVENTATIVE MAINTENANCE
SAFETY-RAILROAD PROTECTION
SAF
SAH
SHN
SLO
SLX
SNK
SPP
STP
TE
FEDERAL HIGHWAY SAFETY
FEDERAL STP FUNDS DEDICATED TO ASHLAND
FEDERAL STP FUNDS DEDICATED TO HENDERSON
FEDERAL STP FUNDS DEDICATED TO LOUISVILLE
FEDERAL STP FUNDS DEDICATED TO LEXINGTON
FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY
STATE CONSTRUCTION HIGH PRIORITY PROJECTS
FEDERAL SURFACE TRANSPORTATION BLOCK GRANT PROGRAM (STP-BG)
FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM
ILLUSTRATIVE
PROJECT
NO
ILLUSTRATIVE PROJECT
IF YES, PROJECT IS NOT IN
FISCAL CONSTRAINT CALCULATION
IF NO, PROJECT IS IN
FISCAL CONSTRAINT CALCULATION.
BR
BR2
CM
FH
HPP
KYD
NH
PM
RRP
STATE
MATCH
LOCAL
MATCH
66,500 0
REQUIRES
MPO TIP
ACTION
NO
AMOUNT OF
STATE
DOLLARS
AMOUNT OF
LOCAL
DOLLARS
MPO TIP
ADMINISTRATIVE
MODIFICATION
OR AMENDMENT
pf3
pf4
pf5
pf8
pf9
pfa
pfd
pfe
pff
pf12
pf13
pf14
pf15
pf16
pf17
pf18
pf19
pf1a
pf1b
pf1c
pf1d
pf1e
pf1f
pf20
pf21
pf22
pf23
pf24
pf25
pf26
pf27
pf28
pf29
pf2a
pf2b
pf2c
pf2d
pf2e
pf2f
pf30
pf31
pf32
pf33
pf34
pf35
pf36
pf37
pf38
pf39
pf3a
pf3b
pf3c
pf3d
pf3e
pf3f
pf40
pf41
pf42
pf43
pf44
pf45
pf46
pf47
pf48
pf49
pf4a
pf4b
pf4c
pf4d
pf4e
pf4f
pf50
pf51
pf52
pf53
pf54
pf55
pf56
pf57
pf58
pf59
pf5a
pf5b
pf5c
pf5d
pf5e
pf5f
pf60
pf61
pf62
pf63
pf64

Partial preview of the text

Download Bridge and Road Infrastructure Projects Data and more Schemes and Mind Maps Design in PDF only on Docsity!

COUNTY ID NUMBER ROUTE NO LENGTH TYPE OF WORK^ DESCRIPTION^ PHASE^ TYPEOF FUND

TOTAL PHASE COST

FEDERAL PORTION

FISCAL YEAR SCHEDULE

ADAIR 8-1068 KY 704 0.01^ 11.905^ 11.913^ AM -^ BRIDGE^ (P)^ ADDRESS DEFICIENCIESOF BRIDGE ON KY 704 (11.909) OVER PETTY'SFORK. (001B00078N)(SD)

D BR/STP 2019 175 ,

KEY TO INTERPRETING INFORMATION PRESENTED

FOR FY 201 9 - FY 202 2

STATEWIDE TRANSPORTATION IMPROVEMENTPROGRAM

(STIP)

COUNTY WHERE PROJECT IS LOCATED

KYTC PROJECT IDENTIFICATION NUMBER

ROUTE

LENGTH (MILES)

SCOPE OF PROJECT

DESCRIPTION

STAGE OF PROJECT DEVELOPMENT: P = PLANNING D = DESIGN R = RIGHT OF WAY U = UTILITY RELOCATION C = CONSTRUCTION

PHASE COST OR TOTAL COST IN YEAR OF EXPENDITURE

AMOUNT OF FEDERAL DOLLARS

FY SCHEDULE; FISCAL YEAR IN WHICH PHASE ACTIVITY SHOULD COMMENCE. FOR EXAMPLE, FY- BEGINS JULY 1, 2018 AND ENDS JUNE 30, 2019 FOR STATE PROJECTS. FOR FEDERAL-AID PROJECTS, FY 2019 BEGINS OCTOBER 1, 2018 AND ENDS SEPTEMBER 30, 2019.

EXAMPLE:

TYPE OF FUNDS TO BE UTILIZED FOR THE PROJECT, ABBREVIATED AS FOLLOWS:

BMP EMP

BEGINNING MILEPOINT

ENDING MILEPOINT

PRIORITY

ASSET MANAGEMENT

PRIORITY OF PROJECT

FEDERAL PORTION

108,

BRIDGE REPLACEMENT JP2 BRAC BOND PROJECTS SECOND PROGRAM FEDERAL CONGESTION MITIGATION FEDERAL FOREST HIGHWAY HIGH PRIORITYPROJECTS FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY FEDERAL NATIONAL HIGHWAY PERFORMANCE PROGRAM (NHPP) PREVENTATIVE MAINTENANCE SAFETY-RAILROAD PROTECTION

SAF SAH SHN SLO SLX SNK SPP STP TE

FEDERAL HIGHWAY SAFETY FEDERAL STP FUNDS DEDICATED TO ASHLAND FEDERAL STP FUNDS DEDICATED TO HENDERSON FEDERAL STP FUNDS DEDICATED TO LOUISVILLE FEDERAL STP FUNDS DEDICATED TO LEXINGTON FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY STATE CONSTRUCTION HIGH PRIORITY PROJECTS FEDERAL SURFACE TRANSPORTATION BLOCK GRANT PROGRAM (STP-BG) FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM

ILLUSTRATIVE PROJECT NO

ILLUSTRATIVE PROJECT IF YES, PROJECT IS NOT IN FISCAL CONSTRAINT CALCULATION IF NO, PROJECT IS IN FISCAL CONSTRAINT CALCULATION.

BR BR CM FH HPP KYD NH PM RRP

STATE MATCH LOCAL MATCH

66,500 0

REQUIRES MPO TIP ACTION NO

AMOUNT OF STATE DOLLARS AMOUNT OF LOCAL DOLLARS

MPO TIP ADMINISTRATIVE MODIFICATION OR AMENDMENT

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

ADAIR 8-1068 KY 704 11.905 11.913 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

ON KY 704 (11.909) OVER PETTY'S

FORK. (001B00078N)(SD)

D BR/STP 2019 175,000 108,500 66,

ADAIR 8-1068 KY 704 11.905 11.913 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

ON KY 704 (11.909) OVER PETTY'S

FORK. (001B00078N)(SD)

C BR/STP 2020 490,000 303,800 186,

ALLEN 3-10000 KY 3499 1.412 1.422 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER BAYS FORK.

(002B00004N)

D BR/STP 2019 175,000 108,500 66,

ALLEN 3-10000 KY 3499 1.412 1.422 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER BAYS FORK.

(002B00004N)

C BR/STP 2020 525,000 325,500 199,

ALLEN 3-10011 KY 585 0 0.002 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585

BRIDGE OVER MIDDLE FORK DRAKES

CREEK. (002B00021N)

D BR/STP 2019 245,000 151,900 93,

ALLEN 3-10011 KY 585 0 0.002 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585

BRIDGE OVER MIDDLE FORK DRAKES

CREEK. (002B00021N)

C BR/STP 2020 822,500 509,950 312,

BALLARD 1-115 US 60 3.7 13.62 16.937 RELIABILITY MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE

US-60 FROM STAFFORD ROAD TO

BETHEL CHURCH ROAD (INCLUDES

KEVIL BYPASS)(TO BE LET WITH 1-

(06CCR)(12CCR)(14CCR)(18CCR).

R NH 2020 2,500,000 2,500,000 -

BALLARD 1-115 US 60 3.7 13.62 16.937 RELIABILITY MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE

US-60 FROM STAFFORD ROAD TO

BETHEL CHURCH ROAD (INCLUDES

KEVIL BYPASS)(TO BE LET WITH 1-

(06CCR)(12CCR)(14CCR)(18CCR).

U NH 2021 3,500,000 2,800,000 700,

BALLARD 1-1140.01 US 51 0.97 7.327 8.297 ASSET

MANAGEMENT

AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR

REPLACEMENT OF CAIRO BRIDGE AT

OR BESIDE EXISTING LOCATION.

(004B00021N)(SD)(18CCR)

D BR/NH 2020 2,500,000 1,550,000 950,

BALLARD 1-1140.02 US 51 0.97 7.327 8.297 ASSET

MANAGEMENT

AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR

REPLACEMENT OF CAIRO BRIDGE AT

OR BESIDE EXISTING

LOCATION.(SD)(18CCR)

D BR/NH 2022 6,500,000 4,030,000 2,470,

BALLARD 1-1140.03 US 51 7.327 8.297 ASSET

MANAGEMENT

AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR

REPLACEMENT OF CAIRO BRIDGE AT

OR BESIDE EXISTING LOCATION.

D BR/NH 2021 20,000,000 12,400,000 7,600,

BALLARD 1-20000 US 51 4.873 7.3 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT

D PM/NH 2020 275,000 220,000 55,

BALLARD 1-20000 US 51 4.873 7.3 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT

C PM/NH 2020 2,750,000 2,200,000 550,

BARREN 3-108.5 KY 90 4.217 17.758 21.975 RELIABILITY RECONSTRUCTION(O) PRIORITY SECTION 3: IMPROVE KY-

EAST OF GLASGOW FROM BRIDGE

OVER FALLEN TIMBER CREEK TO THE

METCALFE COUNTY LINE.

(2002BOPC)(08CCR)(10CCR)(12CCR)

C STP 2022 3,950,000 3,160,000 790,

BARREN 3-195 LN 9008 0.1 0 0.1 ASSET

MANAGEMENT

AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008)

BRIDGE PAINTING, CLEANING, AND

MINOR REPAIRS ON BRIDGE OVER I-

65 IN BARREN CO. KY. 005B00067R,

005B00067L (2016BOP)

C NH 2019 500,000 500,000 -

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BARREN 3-20020 US 68 9.7 0 9.7 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

US-68 FROM MILEPOINT 0.00 TO

MILEPOINT 9.

C PM/NH 2022 1,180,000 944,000 236,

BARREN 3-20021 US 68 6.21 16.95 23.16 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

US-68 FROM MILEPOINT 16.95 TO

MILEPOINT 23.

C PM/NH 2022 920,000 736,000 184,

BATH 9-10000 KY 1106 3.291 3.327 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER FLAT CREEK.

(006B00069N)

D BR/STP 2019 595,000 368,900 226,

BATH 9-10000 KY 1106 3.291 3.327 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER FLAT CREEK.

(006B00069N)

C BR/STP 2020 2,258,000 1,399,960 858,

BATH 9-10001 KY 1944 2.701 2.715 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER WHITE OAK CREEK.

(006B00076N)

D BR/STP 2019 473,000 293,260 179,

BATH 9-10001 KY 1944 2.701 2.715 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER WHITE OAK CREEK.

(006B00076N)

C BR/STP 2020 1,015,000 629,300 385,

BATH 9-10017 KY 211 8.166 8.178 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211

BRIDGE OVER COW CREEK.

(006B00043N)

D BR/STP 2019 315,000 195,300 119,

BATH 9-10017 KY 211 8.166 8.178 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211

BRIDGE OVER COW CREEK.

(006B00043N)

C BR/STP 2020 717,500 444,850 272,

BATH 9-20001 US 60 6.35 7.724 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT

D PM/STP 2019 410,000 328,000 82,

BELL 11-10000 KY 2011 6.395 6.399 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER RED BIRD CREEK.

(007B00071N)

D BR/STP 2019 175,000 108,500 66,

BELL 11-10000 KY 2011 6.395 6.399 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER RED BIRD CREEK.

(007B00071N)

C BR/STP 2020 441,000 273,420 167,

BELL 11-10001 KY 2011 7.534 7.54 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER RED BIRD CREEK.

(007B00072N)

D BR/STP 2019 175,000 108,500 66,

BELL 11-10001 KY 2011 7.534 7.54 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER RED BIRD CREEK.

(007B00072N)

C BR/STP 2020 791,000 490,420 300,

BELL 11-10002 CR 1041 0.091 0.097 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-

BRIDGE OVER YORK BRANCH.

(007C00003N)

D BR/STP 2019 193,000 119,660 73,

BELL 11-10002 CR 1041 0.091 0.097 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-

BRIDGE OVER YORK BRANCH.

(007C00003N)

C BR/STP 2020 595,000 368,900 226,

BELL 11-10038 KY 92 3.142 3.148 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92

BRIDGE OVER GREASY CREEK.

(007B00040N)

D BR/STP 2019 175,000 108,500 66,

BELL 11-10038 KY 92 3.142 3.148 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92

BRIDGE OVER GREASY CREEK.

(007B00040N)

C BR/STP 2020 490,000 303,800 186,

BELL 11-20000 KY 2012 0 1.95 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT, SCHOOL BUS SAFETY

ISSUE. (CCR)

D PM/STP 2019 61,000 48,800 12,

BELL 11-20000 KY 2012 0 1.95 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT, SCHOOL BUS SAFETY

ISSUE. (CCR)

C PM/STP 2019 610,000 488,000 122,

BELL 11-20021 US 25E 1.96 0.9 2.86 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

US-25E FROM MILEPOINT 0.90 TO

MILEPOINT 2.

C PM/NH 2022 1,391,000 1,112,800 278,

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BOONE 6-14 I 75 0.686 177.659 178.345 ECONOMIC

DEVELOPMENT

I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION

ROAD) INTERCHANGE.

(14CCR)(16CCR)(18CCR)

U NH 2019 5,430,000 5,430,000 - YES

BOONE 6-14 I 75 0.686 177.659 178.345 ECONOMIC

DEVELOPMENT

I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION

ROAD) INTERCHANGE.

(14CCR)(16CCR)(18CCR)

C NH 2021 5,000,000 4,000,000 1,000,000 YES

BOONE 6-14.02 I 75 0.686 178.033 178.133 ECONOMIC

DEVELOPMENT

PREFINANCD

CONVRSN(O)

IMPROVE THE KY-536 (MT. ZION

ROAD) INTERCHANGE.

(14CCR)(16CCR)(18CCR)

C NH 2022 17,080,000 13,664,000 3,416,000 YES

BOONE 6-78 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD).(18CCR)

D NH 2019 3,000,000 3,000,000 -

BOONE 6-78 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD).(18CCR)

R NH 2020 4,000,000 4,000,000 -

BOONE 6-78 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD).(18CCR)

U NH 2020 3,000,000 3,000,000 -

BOONE 6-78 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD).(18CCR)

C NH 2020 5,000,000 5,000,000 -

BOONE 6-78.01 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

PREFINANCD

CONVRSN(O)

IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD). (18CCR)

R NH 2021 4,000,000 3,200,000 800,

BOONE 6-78.01 I 275 7.2 8.9 ECONOMIC

DEVELOPMENT

PREFINANCD

CONVRSN(O)

IMPROVE FREIGHT MOBILITY AT I-

275 AND GRAVES ROAD

(CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY

ON I-275/GRAVES RD). (18CCR)

C NH 2022 10,000,000 8,000,000 2,000,

BOONE 6-79 I 75 184.148 185.34 RELIABILITY CONGESTION MITIGTN(O) IMPROVE SAFETY, MOBILITY,

OPERATIONS, AND GEOMETRICS AT

THE JUNCTION OF I-75 AND I-

AND THE SYSTEM-TO-SYSTEM

RAMPS.

D NH 2019 2,000,000 2,000,000 -

BOONE 6-80 I 75 171 171.8 RELIABILITY CONGESTION MITIGTN(O) REDUCE CONGESTION AND IMPROVE

TRAFFIC MOBILITY AT THE

INTERCHANGE OF I-75 AND KY-14 IN

WALTON.

P NH 2021 500,000 400,000 100,000 YES

BOONE 6-400.03 RELIABILITY MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE

PROGRAM. (FUNDING SUBJECT TO

FISCAL CONSTRAINT PENDING MPO

TIP)

C SNK 2019 414,000 331,200 82,800 YES

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BOONE 6-423 KY 3060 0.45 1.5 1.95 RELIABILITY MATCHED FED FUNDS(O) CORRECT GEOMETRIC DEFICIENCIES

AND ADD LEFT TURN LANES ON

FROGTOWN ROAD AT TRIPLE

CROWN BLVD AND

CEDARWOOD.(2012BOP)(ADM. BY

KYTC)

U SNK 2019 120,000 96,000 24,000 YES

BOONE 6-423 KY 3060 0.45 1.5 1.95 RELIABILITY MATCHED FED FUNDS(O) CORRECT GEOMETRIC DEFICIENCIES

AND ADD LEFT TURN LANES ON

FROGTOWN ROAD AT TRIPLE

CROWN BLVD AND

CEDARWOOD.(2012BOP)(ADM. BY

KYTC)

C SNK 2019 1,200,000 960,000 240,000 YES

BOONE 6-433 KY 717 0.3 0.7 1 SAFETY SAFETY(P) IMPROVE SAFETY ALONG KY 717 AT

THE 90 DEGREE BEND NEAR THE

CIN/NKY AIRPORT, 0.337 MI N OF KY

1017. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

(2014BOP)

C SNK 2019 1,000,000 800,000 200,000 YES

BOONE 6-439 KY 3159 0.119 0.652 RELIABILITY MATCHED FED FUNDS(O) WIDEN KY 3159 (TED BUSHELMAN

BLVD) FROM DOERING DRIVE TO KY

1017 (AERO PARKWAY) TO PROVIDE

A TWO-WAY LEFT TURN LANE TO

IMPROVE TRAFFIC FLOW FOR

FUTURE DEVELOPMENT (2016BOP)

C SNK 2019 1,000,000 800,000 200,000 YES

BOONE 6-440 KY 237 6.617 9.418 RELIABILITY MATCHED FED FUNDS(O) CONSTRUCT A MULTI-MODAL PATH

ALONG KY 237 FROM STEPHENS

ELEMENTARY SCHOOL NORTH TO KY

20/PETERSBURG ROAD (2016BOP).

C SNK 2019 1,786,400 1,429,120 357,280 YES

BOONE 6-441 KY 3076 0.825 1.554 RELIABILITY BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS,

DEDICATED BIKE LANES AND

RETAINING WALLS ALONG DOLWICK

ROAD TO MINEOLA PIKE TO OLYMPIC

BLVD IN THE CITY OF ERLANGER.

(2016 BOP)

R SNK 2019 80,000 64,000 16,000 YES

BOONE 6-441 KY 3076 0.825 1.554 RELIABILITY BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS,

DEDICATED BIKE LANES AND

RETAINING WALLS ALONG DOLWICK

ROAD TO MINEOLA PIKE TO OLYMPIC

BLVD IN THE CITY OF ERLANGER.

(2016 BOP)

U SNK 2019 200,000 160,000 40,000 YES

BOONE 6-441 KY 3076 0.825 1.554 RELIABILITY BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS,

DEDICATED BIKE LANES AND

RETAINING WALLS ALONG DOLWICK

ROAD TO MINEOLA PIKE TO OLYMPIC

BLVD IN THE CITY OF ERLANGER.

(2016 BOP)

C SNK 2019 1,576,000 1,260,800 315,200 YES

BOONE 6-442 CR 1001 2.168 2.169 RELIABILITY MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP

ERNST ROAD AT LONGBRANCH ROAD

(2016BOP).

R SNK 2019 400,000 320,000 80,000 YES

BOONE 6-442 CR 1001 2.168 2.169 RELIABILITY MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP

ERNST ROAD AT LONGBRANCH ROAD

(2016BOP).

U SNK 2019 69,271 55,417 13,854 YES

BOONE 6-442 CR 1001 2.168 2.169 RELIABILITY MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP

ERNST ROAD AT LONGBRANCH ROAD

(2016BOP).

C SNK 2019 461,809 369,447 92,362 YES

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BOONE 6-444 KY 236 1.594 0 1.594 RELIABILITY MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE

CONGESTION ALONG KY-

(DONALDSON ROAD) FROM KY-

(HOUSTON ROAD) TO KY-

(MINEOLA PIKE). (18CCR)

P STP 2019 2,000,000 2,000,000 - YES

BOONE 6-444 KY 236 1.594 0 1.594 RELIABILITY MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE

CONGESTION ALONG KY-

(DONALDSON ROAD) FROM KY-

(HOUSTON ROAD) TO KY-

(MINEOLA PIKE). (18CCR)

D STP 2020 5,000,000 5,000,000 -

BOONE 6-445 KY 3076 1.05 0 1.05 RELIABILITY MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND

REDUCE CONGESTION ON KY-

(MINEOLA PIKE) FROM KY-236 TO I-

275. (18CCR)

D STP 2019 1,500,000 1,500,000 -

BOONE 6-445 KY 3076 1.05 0 1.05 RELIABILITY MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND

REDUCE CONGESTION ON KY-

(MINEOLA PIKE) FROM KY-236 TO I-

275. (18CCR)

R STP 2022 4,000,000 3,200,000 800,

BOONE 6-446 US 42 12.508 13.489 NEW ROUTES NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY

AND IMPROVED MOBILITY FROM KY-

237 (PLEASANT VALLEY ROAD) THRU

KY-842 (HOPEFUL CHURCH ROAD) TO

MALL ROAD/I-75 INTERCHANGE.

(18CCR)

D NH 2020 1,500,000 1,500,000 - YES

BOONE 6-966 RELIABILITY MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED

AREA AND SUBJECT TO MPO

CONTROL FOR FY 2018. (FUNDING

SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

C SNK 2019 35,140,000 28,112,000 7,028,000 YES

BOONE 6-966.07 RELIABILITY MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED

AREA AND SUBJECT TO MPO

CONTROL FOR FY 2019 (FUNDING

SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

C SNK 2019 9,100,000 7,280,000 1,820,000 YES

BOONE 6-966.08 RELIABILITY MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED

AREA AND SUBJECT TO MPO

CONTROL FOR FY 2020. (FUNDING

SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

C SNK 2020 9,200,000 7,360,000 1,840,000 YES

BOONE 6-966.09 RELIABILITY MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED

AREA AND SUBJECT TO MPO

CONTROL FOR FY 2021. (FUNDING

SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

C SNK 2021 9,200,000 7,360,000 1,840,000 YES

BOONE 6-966.1 RELIABILITY MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED

AREA AND SUBJECT TO MPO

CONTROL FOR FY 2022. (FUNDING

SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

C SNK 2022 9,200,000 7,360,000 1,840,000 YES

BOONE 6-1087 KY 842 0.074 0.094 0.141 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

OVER NS (CNO&TP)RR ON

RICHARDSON ROAD (KY 842) 0.14 MI

E OF US 25 NEAR INDEPENDENCE

(008B00092N)

D BR/STP 2019 480,000 297,600 182,

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BOURBON 7-365.1 KY 3364 0.1 5.389 5.489 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF

STRUCTURE OVER SCOTTS CREEK ON

KY 3364, 0.7 MILE NORTH OF US 460

AT NORTH MIDDLETOWN (BRIDGE

IMPROVEMENTS).

(03KYDN)(2012BOP) (16CCN)

D KYD 2019 1,568,000 1,568,000 -

BOURBON 7-8705 US 460 6.302 1.394 7.696 RELIABILITY RECONSTRUCTION(O) IMPROVE US-460 FROM RUSSELL

CAVE ROAD TO US-27 BYPASS IN

PARIS.(12CCN)(14CCR)(16CCR)

R STP 2019 1,000,000 1,000,000 -

BOURBON 7-8705 US 460 6.302 1.394 7.696 RELIABILITY RECONSTRUCTION(O) IMPROVE US-460 FROM RUSSELL

CAVE ROAD TO US-27 BYPASS IN

PARIS.(12CCN)(14CCR)(16CCR)

U STP 2019 1,000,000 1,000,000 -

BOURBON 7-8705 US 460 6.302 1.394 7.696 RELIABILITY RECONSTRUCTION(O) IMPROVE US-460 FROM RUSSELL

CAVE ROAD TO US-27 BYPASS IN

PARIS.(12CCN)(14CCR)(16CCR)

C STP 2021 5,620,000 4,496,000 1,124,

BOURBON 7-8705.01 US 460 6.302 1.394 7.696 RELIABILITY PREFINANCD

CONVRSN(O)

IMPROVE US-460 FROM RUSSELL

CAVE ROAD TO US-27 BYPASS IN

PARIS.(12CCN)(14CCR)(16CCR)

R STP 2021 2,030,000 1,624,000 406,

BOURBON 7-8705.01 US 460 6.302 1.394 7.696 RELIABILITY PREFINANCD

CONVRSN(O)

IMPROVE US-460 FROM RUSSELL

CAVE ROAD TO US-27 BYPASS IN

PARIS.(12CCN)(14CCR)(16CCR)

U STP 2021 1,500,000 1,200,000 300,

BOURBON 7-10007 CR 1205 1.566 1.574 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON

ANTIOCH ROAD BRIDGE OVER

HOUSTON CREEK. (009C00031N)

D BR/STP 2019 143,500 88,970 54,

BOURBON 7-10007 CR 1205 1.566 1.574 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON

ANTIOCH ROAD BRIDGE OVER

HOUSTON CREEK. (009C00031N)

C BR/STP 2020 325,500 201,810 123,

BOURBON 7-10008 CR 1320 4.983 4.99 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK

ROAD BRIDGE OVER CSX RR.

(009R00605N)

D BR/STP 2019 220,500 136,710 83,

BOURBON 7-10008 CR 1320 4.983 4.99 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK

ROAD BRIDGE OVER CSX RR.

(009R00605N)

C BR/STP 2020 518,000 321,160 196,

BOURBON 7-20002 US 68X 0 2.772 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT.

D PM/STP 2019 250,000 200,000 50,

BOURBON 7-20002 US 68X 0 2.772 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF

AC PAVEMENT.

C PM/STP 2019 2,500,000 2,000,000 500,

BOYD 9-208.04 RELIABILITY MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY

2018. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

C SAH 2019 6,265,000 5,012,000 1,253,000 YES

BOYD 9-208.05 RELIABILITY MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY

2019. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

C SAH 2019 1,200,000 960,000 240,000 YES

BOYD 9-208.06 RELIABILITY MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY

2020. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

C SAH 2020 1,200,000 960,000 240,000 YES

BOYD 9-208.07 RELIABILITY MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY

2021. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

C SAH 2021 1,600,000 1,280,000 320,000 YES

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BOYD 9-208.08 RELIABILITY MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY

2022. (FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

C SAH 2022 1,600,000 1,280,000 320,000 YES

BOYD 9-10014 US 23S 0.048 0.48 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH

STREET BRIDGE OVER THE OHIO

RIVER. JOINT PROJECT WITH OHIO.

(010B00040N)(BSBP)

C BR/NH 2019 1,750,000 1,085,000 665,

BOYD 9-10015 US 60 12.636 12.88 ASSET

MANAGEMENT

AM-BRIDGE (P) PAINTING AND PREVENTIVE

MAINTENANCE ON CATLETTSBURG

KENOVA BRIDGE ON 35TH ST. OVER

THE OHIO RIVER. JOINT PROJECT

WITH OHIO. (010B00062N)(BSBP)

C BR/STP 2020 1,200,000 744,000 456,000 YES

BOYD 9-10016 I 64 191.404 191.507 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY

GENTRY BRIDGES OVER THE BIG

SANDY RIVER. JOINT PROJECT WITH

WEST VIRGINIA. (010B00046L AND

010B00046R)(SD)

C BR/NH 2020 1,500,000 930,000 570,000 YES

BOYD 9-10018 KY 854 7.068 7.076 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854

BRIDGE OVER GARNER CREEK.

(010B00045N)

D BR/STP 2019 525,000 325,500 199,500 YES

BOYD 9-10018 KY 854 7.068 7.076 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854

BRIDGE OVER GARNER CREEK.

(010B00045N)

C BR/STP 2020 1,085,000 672,700 412,300 YES

BOYD 9-20002 I 64 180.812 183.95 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

I-64 BOTH DIRECTION(S) FROM

MILEPOINT 180.812 TO MILEPOINT

D PM/NH 2019 250,000 200,000 50,000 YES

BOYD 9-20002 I 64 180.812 183.95 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

I-64 BOTH DIRECTION(S) FROM

MILEPOINT 180.812 TO MILEPOINT

C PM/NH 2019 2,500,000 2,000,000 500,000 YES

BOYD 9-20015 US 23 6.28 10.67 16.95 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

US-23 FROM MILEPOINT 10.67 TO

MILEPOINT 16.

C PM/NH 2022 2,365,000 1,892,000 473,000 YES

BOYLE 7-242 US 68 6.4 6.418 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68

AND US 150 BRIDGE OVER CHAPLIN

RIVER, PERRYVILLE. (SEE 7-242.

FOR HPP FUNDS)(2005HPP-

KY134)(011B00042N)(SD)

C BR/STP 2020 1,253,000 776,860 476,

BOYLE 7-242.01 US 68 6.4 6.418 RELIABILITY AM-BRIDGE (P) REPLACE US 68 AND US 150 BRIDGE

OVER CHAPLIN RIVER, PERRYVILLE.

011B00042N (2005HPP-

KY134)(EARMARK DOES NOT COVER

TOTAL PROJECT COST OF

$1,790,000).(SD)

C HPP 2019 487,797 487,797 -

BOYLE 7-20024 US 127B 5.27 0 5.27 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

US-127B FROM MILEPOINT 0.00 TO

MILEPOINT 5.

C PM/NH 2022 2,301,000 1,840,800 460,

BRACKEN 6-10008 KY 8 1.202 1.25 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8

BRIDGE OVER HOLTS CREEK AT

FOSTER. (012B00004N)

D BR/STP 2019 455,000 282,100 172,

BRACKEN 6-10008 KY 8 1.202 1.25 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8

BRIDGE OVER HOLTS CREEK AT

FOSTER. (012B00004N)

C BR/STP 2020 3,325,000 2,061,500 1,263,

BREATHITT 10-375 KY 205 2.15 7.804 9.954 RELIABILITY MINOR WIDENING(O) IMPROVE KY-205 FROM NORTH OF

KY-1812 TO SOUTH OF PEGGS FORK

RD.

D STP 2021 1,000,000 800,000 200,

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BULLITT 5-544 KY 44 0.5 11.75 12.25 SAFETY BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS

AND REHABILITATION OF EXISTING

SIDEWALKS TO FIX GAPS IN THE

PEDESTRIAN NETWORK ALONG KY 44

FROM FRANK E. SIMON DRIVE (CITY

PARK DRIVE) EAST TO KY 61 IN

SHEPHERDSVILLE. KY 44 MILEPOINTS

FROM 11.75 TO 12.25.(2016BOP)

R SLO 2019 60,000 48,000 12,

BULLITT 5-544 KY 44 0.5 11.75 12.25 SAFETY BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS

AND REHABILITATION OF EXISTING

SIDEWALKS TO FIX GAPS IN THE

PEDESTRIAN NETWORK ALONG KY 44

FROM FRANK E. SIMON DRIVE (CITY

PARK DRIVE) EAST TO KY 61 IN

SHEPHERDSVILLE. KY 44 MILEPOINTS

FROM 11.75 TO 12.25.(2016BOP)

U SLO 2019 60,000 48,000 12,

BULLITT 5-544 KY 44 0.5 11.75 12.25 SAFETY BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS

AND REHABILITATION OF EXISTING

SIDEWALKS TO FIX GAPS IN THE

PEDESTRIAN NETWORK ALONG KY 44

FROM FRANK E. SIMON DRIVE (CITY

PARK DRIVE) EAST TO KY 61 IN

SHEPHERDSVILLE. KY 44 MILEPOINTS

FROM 11.75 TO 12.25.(2016BOP)

C SLO 2019 220,000 176,000 44,

BULLITT 5-550 I 65 18.392 104.788 123.18 RELIABILITY MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES

FROM KY-61 (PRESTON HIGHWAY) IN

LEBANON JUNCTION TO I-265 (GENE

SNYDER FREEWAY)

P NH 2020 250,000 250,000 - YES

BULLITT 5-550 I 65 18.392 104.788 123.18 RELIABILITY MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES

FROM KY-61 (PRESTON HIGHWAY) IN

LEBANON JUNCTION TO I-265 (GENE

SNYDER FREEWAY)

D NH 2022 7,470,000 5,976,000 1,494,000 YES

BULLITT 5-8509 KY 245 1.99 4.425 6.415 RELIABILITY MINOR WIDENING(O) WIDEN KY-245 FROM BERNHEIM

FOREST TO THE COMMUNITY

COLLEGE.

(08CCN)(10CCR)(14CCR)(16CCR)

C STP 2022 12,640,000 10,112,000 2,528,000 YES

BULLITT 5-20036 KY 480 5.14 0 5.14 ASSET

MANAGEMENT

AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON

KY-480 FROM MILEPOINT 0.00 TO

MILEPOINT 5.

C PM/STP 2022 910,000 728,000 182,000 YES

BUTLER 3-2042.3 WN 9007 35.7 36.1 RELIABILITY I-CHANGE RECONST(O) I-65 SPUR CORRIDOR: IMPROVE THE

NATCHER PARKWAY/US-

INTERCHANGE (EXIT 36). (2016BOP)

C NH 2021 6,750,000 5,400,000 1,350,

BUTLER 3-10003 KY 70 4.19 4.204 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER PANTHER CREEK.

(016B00019N)

D BR/STP 2019 245,000 151,900 93,

BUTLER 3-10003 KY 70 4.19 4.204 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER PANTHER CREEK.

(016B00019N)

C BR/STP 2020 889,000 551,180 337,

BUTLER 3-10004 CR 1008 3.903 3.909 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY

SCHOOL ROAD BRIDGE OVER LITTLE

BULL CREEK. (016C00031N)

D BR/STP 2019 157,500 97,650 59,

BUTLER 3-10004 CR 1008 3.903 3.909 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY

SCHOOL ROAD BRIDGE OVER LITTLE

BULL CREEK. (016C00031N)

C BR/STP 2020 266,000 164,920 101,

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

BUTLER 3-20007 WK 9001 87.544 88.433 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

WENDELL H. FORD WESTERN KY

PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 87.544 TO MILEPOINT

D PM/NH 2021 70,000 56,000 14,

BUTLER 3-20007 WK 9001 87.544 88.433 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

WENDELL H. FORD WESTERN KY

PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 87.544 TO MILEPOINT

C PM/NH 2021 700,000 560,000 140,

BUTLER 3-20008 WN 9007 21.78 28.5 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

WILLIAM H. NATCHER PARKWAY

BOTH DIRECTION(S) FROM

MILEPOINT 21.78 TO MILEPOINT 28.

(26.42 NON-CARDINAL)

D PM/NH 2022 540,000 432,000 108,

BUTLER 3-20008 WN 9007 21.78 28.5 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

WILLIAM H. NATCHER PARKWAY

BOTH DIRECTION(S) FROM

MILEPOINT 21.78 TO MILEPOINT 28.

(26.42 NON-CARDINAL)

C PM/NH 2022 5,400,000 4,320,000 1,080,

BUTLER 3-20010 WN 9007 34.724 37.143 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

PCC PAVEMENT ON WILLIAM H.

NATCHER PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT

34.724 TO MILEPOINT 37.

D PM/NH 2019 240,000 192,000 48,

BUTLER 3-20010 WN 9007 34.724 37.143 ASSET

MANAGEMENT

AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF

PCC PAVEMENT ON WILLIAM H.

NATCHER PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT

34.724 TO MILEPOINT 37.

C PM/NH 2019 2,400,000 1,920,000 480,

CALDWELL 2-10000 KY 126 2.26 2.36 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER DREEN CREEK.

(017B00023N)

D BR/STP 2019 245,000 151,900 93,

CALDWELL 2-10000 KY 126 2.26 2.36 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-

BRIDGE OVER DREEN CREEK.

(017B00023N)

C BR/STP 2020 1,312,500 813,750 498,

CALDWELL 2-20000 I 24 54.842 57.389 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

PCC PAVEMENT ON I-24 BOTH

DIRECTION(S) FROM MILEPOINT

54.842 TO MILEPOINT 57.

D PM/NH 2022 250,000 200,000 50,

CALDWELL 2-20000 I 24 54.842 57.389 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

PCC PAVEMENT ON I-24 BOTH

DIRECTION(S) FROM MILEPOINT

54.842 TO MILEPOINT 57.

C PM/NH 2022 2,500,000 2,000,000 500,

CALDWELL 2-20004 I 69 82.934 86.344 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

I-69 BOTH DIRECTION(S) FROM

MILEPOINT 82.934 TO MILEPOINT

D PM/NH 2021 400,000 320,000 80,

CALDWELL 2-20004 I 69 82.934 86.344 ASSET

MANAGEMENT

AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF

I-69 BOTH DIRECTION(S) FROM

MILEPOINT 82.934 TO MILEPOINT

C PM/NH 2021 4,000,000 3,200,000 800,

CALLOWAY 1-314.2 US 641 5.7 0 5.666 RELIABILITY MAJOR WIDENING(O) IMPROVE US-641 FROM THE

TENNESSEE STATE LINE TO MURRAY

PRIORITY SECTION 2; FROM TENN.

STATE LINE TO CLARKS RIVER

BRIDGE.(SEE 1-8852.00)

D NH 2019 2,000,000 2,000,000 -

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

CAMPBELL 6-443 US 27 16.333 16.507 RELIABILITY MATCHED FED FUNDS(O) ADD LANE ON US 27 TO PROVIDE

THREE CONTINUOUS SOUTHBOUND

THROUGH-LANES FROM MARSHALL

LANE TO JOHNS HILL ROAD (KY

3490). (2016BOP)

C SNK 2019 500,000 400,000 100,000 YES

CAMPBELL 6-448 KY 9 17.525 17.978 RELIABILITY CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCE

CONGESTION AT THE I-

INTERCHANGE WITH KY-9 (AA HWY.)

P NH 2021 700,000 560,000 140,000 YES

CAMPBELL 6-451 US 27 20.623 21.209 RELIABILITY BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1.

IMPROVE/ADD SIDEWALKS, ACCESS

MANAGEMENT, STREET LIGHTING,

IMPROVE SAFETY FROM

NEWPORT/SOUTHGATE CITY LIMITS

TO CAROTHERS ROAD.

D SNK 2019 454,960 363,968 90,992 YES

CAMPBELL 6-451 US 27 20.623 21.209 RELIABILITY BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1.

IMPROVE/ADD SIDEWALKS, ACCESS

MANAGEMENT, STREET LIGHTING,

IMPROVE SAFETY FROM

NEWPORT/SOUTHGATE CITY LIMITS

TO CAROTHERS ROAD.

R SNK 2019 61,600 49,280 12,320 YES

CAMPBELL 6-451 US 27 20.623 21.209 RELIABILITY BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1.

IMPROVE/ADD SIDEWALKS, ACCESS

MANAGEMENT, STREET LIGHTING,

IMPROVE SAFETY FROM

NEWPORT/SOUTHGATE CITY LIMITS

TO CAROTHERS ROAD.

U SNK 2019 1,496,000 1,196,800 299,200 YES

CAMPBELL 6-451 US 27 20.623 21.209 RELIABILITY BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1.

IMPROVE/ADD SIDEWALKS, ACCESS

MANAGEMENT, STREET LIGHTING,

IMPROVE SAFETY FROM

NEWPORT/SOUTHGATE CITY LIMITS

TO CAROTHERS ROAD.

C SNK 2020 1,200,000 960,000 240,000 YES

CAMPBELL 6-452 US 27 21.32 21.463 RELIABILITY BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH

UNDERPASS. IMPROVE FOR

PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH

10' SIDEWALK, LIGHTING BUS STOPS

AT THE UNDERPASS OF THE CSX

RAILROAD BRIDGE BETWEEN 11TH

STREET AND 13TH STREET.

D SNK 2020 378,400 302,720 75,680 YES

CAMPBELL 6-452 US 27 21.32 21.463 RELIABILITY BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH

UNDERPASS. IMPROVE FOR

PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH

10' SIDEWALK, LIGHTING BUS STOPS

AT THE UNDERPASS OF THE CSX

RAILROAD BRIDGE BETWEEN 11TH

STREET AND 13TH STREET.

R SNK 2020 32,000 25,600 6,400 YES

CAMPBELL 6-452 US 27 21.32 21.463 RELIABILITY BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH

UNDERPASS. IMPROVE FOR

PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH

10' SIDEWALK, LIGHTING BUS STOPS

AT THE UNDERPASS OF THE CSX

RAILROAD BRIDGE BETWEEN 11TH

STREET AND 13TH STREET.

U SNK 2020 24,000 19,200 4,800 YES

COUNTY LISTING OF PROJECT PHASES

FY 2019 - FY 2022

COUNTY ITEM ID ROUTE NO. LENGTH BMP EMP PRIORITY TYPE OF WORK DESCRIPTION PHASE

TYPE OF

FUND

FISCAL

YEAR

TOTAL PHASE

COST

FEDERAL

PORTION

STATE MATCH LOCAL MATCH

ILLUSTRATIVE

PROJECT

REQUIRES MPO

TIP ACTION

CAMPBELL 6-452 US 27 21.32 21.463 RELIABILITY BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH

UNDERPASS. IMPROVE FOR

PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH

10' SIDEWALK, LIGHTING BUS STOPS

AT THE UNDERPASS OF THE CSX

RAILROAD BRIDGE BETWEEN 11TH

STREET AND 13TH STREET.

C SNK 2021 1,320,000 1,056,000 264,000 YES

CAMPBELL 6-453 RELIABILITY BIKE/PED FACIL(O) RIVERFRONT COMMONS.

CONSTRUCT A 15' WIDE CONCRETE

BICYCLE/PEDESTRIAN TRAIL AND

CONDUIT FOR FUTURE LIGHTING

FROM BERRY STREET TO FOURTH

AVENUE. PART OF 11.5 MILE

PROJECT.

D SNK 2019 126,000 100,800 25,200 YES

CAMPBELL 6-453 RELIABILITY BIKE/PED FACIL(O) RIVERFRONT COMMONS.

CONSTRUCT A 15' WIDE CONCRETE

BICYCLE/PEDESTRIAN TRAIL AND

CONDUIT FOR FUTURE LIGHTING

FROM BERRY STREET TO FOURTH

AVENUE. PART OF 11.5 MILE

PROJECT.

C SNK 2020 760,000 608,000 152,000 YES

CAMPBELL 6-1085 KY 8 0.054 18.017 18.071 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

OVER TWELVEMILE CREEK ON KY 8

0.1 MI N OF NEISES ROAD (CR 1009).

(019B00003N)

R BR/STP 2019 50,000 31,000 19,

CAMPBELL 6-1085 KY 8 0.054 18.017 18.071 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

OVER TWELVEMILE CREEK ON KY 8

0.1 MI N OF NEISES ROAD (CR 1009).

(019B00003N)

U BR/STP 2019 150,000 93,000 57,

CAMPBELL 6-1085 KY 8 0.054 18.017 18.071 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

OVER TWELVEMILE CREEK ON KY 8

0.1 MI N OF NEISES ROAD (CR 1009).

(019B00003N)

C BR/STP 2020 2,500,000 1,550,000 950,

CAMPBELL 6-1095 CR 1363 0.045 0.051 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

ON COVERT RUN PIKE (CR-1363)

(0.048) OVER TRIBUTARY TO TAYLOR

CREEK. 019C00069N

D BR/STP 2019 122,500 75,950 46,

CAMPBELL 6-1095 CR 1363 0.045 0.051 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE

ON COVERT RUN PIKE (CR-1363)

(0.048) OVER TRIBUTARY TO TAYLOR

CREEK. 019C00069N

C BR/STP 2020 630,000 390,600 239,

CAMPBELL 6-8105.01 I 275 RELIABILITY NEW ROUTE(O) TRANSPORTATION IMPROVEMENTS

TO AA-I-275 CONNECTOR, CAMPBELL

COUNTY. (2005HPP-KY155)(SEE 6-

8105.00 FOR "KYD"

COMPONENT)(06CCR)(10CCR)

C HPP 2019 690,401 690,401 - YES

CAMPBELL 6-8105.03 RELIABILITY NEW ROUTE(O) CONSTRUCT NEW TECHNOLOGY

TRIANGLE ACCESS ROAD, CAMPBELL

COUNTY, KENTUCKY. (2005HPP-

KY126)(2006BOPC).(10CCR)

C HPP 2019 1,439,840 1,439,840 - YES

CAMPBELL 6-10000 KY 2238 1.682 1.69 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON

ROAD BRIDGE OVER THREEMILE

CREEK. (019B00060N)

D BR/STP 2019 140,000 86,800 53,

CAMPBELL 6-10000 KY 2238 1.682 1.69 ASSET

MANAGEMENT

AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON

ROAD BRIDGE OVER THREEMILE

CREEK. (019B00060N)

C BR/STP 2020 318,500 197,470 121,