




























































































Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
Data on various bridge and road infrastructure projects, including their county ID numbers, route numbers, lengths, types of work, descriptions, phases, types of fund, total costs, and federal portions. The projects are located in different counties and involve different types of roads and bridges.
Typology: Schemes and Mind Maps
1 / 134
This page cannot be seen from the preview
Don't miss anything!





























































































COUNTY ID NUMBER ROUTE NO LENGTH TYPE OF WORK^ DESCRIPTION^ PHASE^ TYPEOF FUND
TOTAL PHASE COST
FEDERAL PORTION
FISCAL YEAR SCHEDULE
ADAIR 8-1068 KY 704 0.01^ 11.905^ 11.913^ AM -^ BRIDGE^ (P)^ ADDRESS DEFICIENCIESOF BRIDGE ON KY 704 (11.909) OVER PETTY'SFORK. (001B00078N)(SD)
D BR/STP 2019 175 ,
COUNTY WHERE PROJECT IS LOCATED
KYTC PROJECT IDENTIFICATION NUMBER
ROUTE
LENGTH (MILES)
SCOPE OF PROJECT
DESCRIPTION
STAGE OF PROJECT DEVELOPMENT: P = PLANNING D = DESIGN R = RIGHT OF WAY U = UTILITY RELOCATION C = CONSTRUCTION
PHASE COST OR TOTAL COST IN YEAR OF EXPENDITURE
AMOUNT OF FEDERAL DOLLARS
FY SCHEDULE; FISCAL YEAR IN WHICH PHASE ACTIVITY SHOULD COMMENCE. FOR EXAMPLE, FY- BEGINS JULY 1, 2018 AND ENDS JUNE 30, 2019 FOR STATE PROJECTS. FOR FEDERAL-AID PROJECTS, FY 2019 BEGINS OCTOBER 1, 2018 AND ENDS SEPTEMBER 30, 2019.
TYPE OF FUNDS TO BE UTILIZED FOR THE PROJECT, ABBREVIATED AS FOLLOWS:
BMP EMP
BEGINNING MILEPOINT
ENDING MILEPOINT
PRIORITY
ASSET MANAGEMENT
PRIORITY OF PROJECT
FEDERAL PORTION
108,
BRIDGE REPLACEMENT JP2 BRAC BOND PROJECTS SECOND PROGRAM FEDERAL CONGESTION MITIGATION FEDERAL FOREST HIGHWAY HIGH PRIORITYPROJECTS FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY FEDERAL NATIONAL HIGHWAY PERFORMANCE PROGRAM (NHPP) PREVENTATIVE MAINTENANCE SAFETY-RAILROAD PROTECTION
SAF SAH SHN SLO SLX SNK SPP STP TE
FEDERAL HIGHWAY SAFETY FEDERAL STP FUNDS DEDICATED TO ASHLAND FEDERAL STP FUNDS DEDICATED TO HENDERSON FEDERAL STP FUNDS DEDICATED TO LOUISVILLE FEDERAL STP FUNDS DEDICATED TO LEXINGTON FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY STATE CONSTRUCTION HIGH PRIORITY PROJECTS FEDERAL SURFACE TRANSPORTATION BLOCK GRANT PROGRAM (STP-BG) FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM
ILLUSTRATIVE PROJECT NO
ILLUSTRATIVE PROJECT IF YES, PROJECT IS NOT IN FISCAL CONSTRAINT CALCULATION IF NO, PROJECT IS IN FISCAL CONSTRAINT CALCULATION.
BR BR CM FH HPP KYD NH PM RRP
STATE MATCH LOCAL MATCH
66,500 0
REQUIRES MPO TIP ACTION NO
AMOUNT OF STATE DOLLARS AMOUNT OF LOCAL DOLLARS
MPO TIP ADMINISTRATIVE MODIFICATION OR AMENDMENT