A series of questions and answers related to concrete testing procedures, likely intended for preparation for the american concrete institute (aci) certification exam. It covers topics such as slump testing, air content measurement, temperature requirements, and specimen preparation. The questions are concise and focus on specific details and standards relevant to concrete quality control and testing. This material is useful for civil engineering students and professionals in the construction industry preparing for certification or seeking to reinforce their knowledge of concrete testing protocols. The document serves as a quick reference for key facts and procedures related to concrete testing, aiding in exam readiness and practical application in the field. It is a valuable resource for those seeking to understand and apply aci standards in concrete construction and quality assurance.

Typology: Exams

2024/2025

Available from 08/16/2025

peter-karanja-3
peter-karanja-3 🇬🇧

5

(3)

4.1K documents

1 / 2

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
aci exam practice
10 to 15 times - Answer-the sides of the slump mold should be lightly tapped --- to
consolidate the concrete in the mold.
15 minutes - Answer-Start molding strength test specimens within ____ after
fabricating the composite sample.
28L (1ft3) - Answer-The minimum size for samples to be used for strength tests is.
3 inches - Answer-When determining the temperature of fresh concrete, what is the
minimum amount of concrete cover in all directions around the sensor of the
temperature measuring device?
4.8% - Answer-If the aggregate correction factor for a given source of fine and
coarse aggregate is found to be 0.2% in a pressure air meter, and an air content
value of 5.0% is read on the gage of the same air meter containing concrete with the
same aggregate, what is the correct air content?
5 minutes - Answer-Tests for the slump and air content must be started within ____
after obtaining the final portion of the composite sample.
6% = [(168-158)/168]×100 - Answer-According to test method C138, what is the air
content (in percent) of the following concrete batch.
The theoretical density computed on air free basis is 168 lb/ft3
The density is 158 lb/ft3
60-80*F - Answer-For normal strength concretes, what temperature range must be
maintained for test cylinders during initial curing?
adjust the rate of revolution of the drum - Answer-regulate the rate at which concrete
is discharged from a revolving drum truck mixer by
air content test - Answer-It is not acceptable to fabricate a test specimen from the
same concrete used for the
Determination that at least 8 hours have elapsed since final set. - Answer-
Preparation of the specimens for transport includes.
discarded - Answer-after wet sieving a portion of concrete sample, any aggregate
retained on the sieve shall be
pf2

Partial preview of the text

Download ACI Concrete Testing Exam Practice Questions and more Exams Engineering in PDF only on Docsity!

aci exam practice

10 to 15 times - Answer-the sides of the slump mold should be lightly tapped --- to consolidate the concrete in the mold. 15 minutes - Answer-Start molding strength test specimens within ____ after fabricating the composite sample. 28L (1ft3) - Answer-The minimum size for samples to be used for strength tests is. 3 inches - Answer-When determining the temperature of fresh concrete, what is the minimum amount of concrete cover in all directions around the sensor of the temperature measuring device? 4.8% - Answer-If the aggregate correction factor for a given source of fine and coarse aggregate is found to be 0.2% in a pressure air meter, and an air content value of 5.0% is read on the gage of the same air meter containing concrete with the same aggregate, what is the correct air content? 5 minutes - Answer-Tests for the slump and air content must be started within ____ after obtaining the final portion of the composite sample. 6% = [(168-158)/168]×100 - Answer-According to test method C138, what is the air content (in percent) of the following concrete batch. The theoretical density computed on air free basis is 168 lb/ft The density is 158 lb/ft 60-80*F - Answer-For normal strength concretes, what temperature range must be maintained for test cylinders during initial curing? adjust the rate of revolution of the drum - Answer-regulate the rate at which concrete is discharged from a revolving drum truck mixer by air content test - Answer-It is not acceptable to fabricate a test specimen from the same concrete used for the Determination that at least 8 hours have elapsed since final set. - Answer- Preparation of the specimens for transport includes. discarded - Answer-after wet sieving a portion of concrete sample, any aggregate retained on the sieve shall be

Disregard the test and retest another portion of the sample. - Answer-While the technician is checking the slump of the concrete, there is a decided falling away or shearing off of concrete from one side of the sample. What should the technician do? fasle - Answer-After striking off of the measure used to determine density, a small quantity of concrete may be added to correct the deficiency. inverting and agitating - Answer-Test Method C172/C172M specifies a minimum time required for [---] the meter to free concrete from the base. large aggregate - Answer-When concrete contains [-----] , the testing technician should not wet sieve the sample before making density (unit weight) test for use in yield computations. Obtain a representative sample of concrete - Answer-the primary objective of sampling concrete Protected from jarring, moisture loss, freezing - Answer-Strength test specimens transported from the field to the testing laboratory must be. represented samples - Answer-are required for use in tests conducted for the purpose of determining compliance with the specifications for concrete quality. thin layer - Answer-Test cylinders may be capped with a [---] of Portland cement paste which is permitted to harden and cure with the specimen. vibration - Answer-Unless specified otherwise, strength test specimens molded from concrete having a slump less than 1 inch must be consolidated by