This quiz focuses on API 653 recertification, covering tank inspection, repair, and maintenance. Questions relate to material requirements, welding, corrosion prevention, and regulatory compliance. Designed to test knowledge of industry standards and best practices for storage tank integrity and safety, it's valuable for engineers, inspectors, and maintenance personnel. The quiz assesses understanding of API 653 guidelines, covering shell-to-bottom joint evaluation, corrosion rates, material specifications, and inspection intervals. It addresses scenarios like converting tanks for elevated temperatures and installing nozzles in tanks of unknown material. It enhances expertise in tank maintenance and compliance.
Typology: Exams
1 / 4
This page cannot be seen from the preview
Don't miss anything!



Per API 653 , with of the following is required when converting an existing tank to operation at elevated temperatures when it was not originally designed and constructed to API 650, Appendix M? - The Shell to bottom joint shall be evaluated for fatigue When removing an existing tank bottom, all arc-gouged areas of the tank shell-to- bottom shall be: - examined using magnetic particle inspection, and defective areas repaired and re-examined. If RBI assessment has been conducted and the tank has cathodic protection plus a thin-film lining, the maximum inspection interval is: - 14 years When installing a new nozzle in a tank of unknow material, what stress value should be used to calculate the required shell thickness and reinforcement? - 20,000 lbf/in In regards to underside corrosion on tank bottoms, the corrosion rate of steel in a wet environment. - may double with every 18 °F increase in temperature above 77 °F. Grade 350W/50W is acceptable for tank plate to a maximum thickness of: - 45mm (1.75in) if fully killed and made to a fine grain practice. If an RBI assessment has been conducted and the tank has a release prevention barrier, the maximum initial inspection interval is: - 25 years As an alternative to the procedures in API 653 for the evaluation of any thinning of the tank shell below minimum required wall thickness may be evaluated for continued service using which code? - API RP 579, section 4, 5 or 6.
When welding on a tank shell constructed of Group I steel that is greater than 1. inches thick below what minimum metal temperature ?preheat? - 200°F When evaluated an existing temperature services tank, which has a successful service history of operation but was not originally designed and constructed to the requirement of API 650, appendix M, which condition temperature has to be used? - The max Operating Temperature shall not exceed the temperature at which the tank has successfully operated in the pass. Flange material used for tank repair and alteration shall meet the minimum requirements for the material specifications according to: - The as built standard which is an advantage of thick film UN-REINFORCED linings? - Fast curing and can be put back in service after 24 hours at normal ambient temperature. The perimeter welds on a welded-on patch plate in the critical zone should be? - Two-pass and examined visually and by either MP or PT. Existent welds on a tank shell are found to e closer than allowed by API 650 (7th Edition). Under what conditions can these welds be considered to be acceptable for continued service? - Examined by MP inspection with no rejectable indications. The requirements of which standard shall be considered in the evaluation and alteration to the tank roof and roof-to-shell junction? - Current applicable standard Welding procedure for ladder and platform assemblies, but not their attachment to the tank? - Shall comply with either AWS D1.1, AWS D1.6 or ASME Code Section IX. In floating roof tanks, shell nozzles without internal piping within operating range of the floating roof shall be supplied? - Flush on the inside of the tank. The attachment welds of new lap-welded shell patch plates shall be examined by: - Visually and by either MP or PT
At what PH does a thin iron sulfide layer deposit on the steel and provides some protection to corrosion - > 4. Max Temperature for Coal tar Epoxy - 120F to 170F where gas-tight roofs are required - Leak testing may be accomplished The present of clay, wood, gravel, or crushed stores as contaminants in a sand pad may cause - Pitting corrosion at each point of contact Holiday testing of thin-film linings should be performed with? - Low voltage wet sponge detector Anchor bolts that's have distortions or excessive cracking may be indications of: - Serious foundation settlement or a Tank overpressure uplift condition. what happen when concrete has been exposed to sufficiently high temperature for a period of time. - Loss of water of hydration (Calcining) The permeability of a leak detection barrier shall not exceed - 1 × 10-7 cm (4 × 10- 5 mils) per second