
Study with the several resources on Docsity
Earn points by helping other students or get them with a premium plan
Prepare for your exams
Study with the several resources on Docsity
Earn points to download
Earn points by helping other students or get them with a premium plan
This lecture is from Management Science. Key important points are: Case Problem, Foster Generators, Shipment of a Product, Distribution Centers, Production Capacities, Three Month Planning Period, Three Month Production Capacity, Regional Distribution Centers, Three Month Forecast, Foster Generators Transportation
Typology: Study notes
1 / 1
This page cannot be seen from the preview
Don't miss anything!

Consider a problem faced by Foster Generators. This problem involves the shipment of a product from three plants to four distribution centers. Foster Generators has plants in Cleveland, Ohio; Bedford, Indiana; and York, Pennsylvania. Production capacities over the next three-month planning period for one particular type of generator are as follows:
Origin Plant Three-Month Production Capacity (units) 1 Cleveland 5000 2 Bedford 6000 3 York 2500 Total 13,
The firm distributes its generators through four regional distribution centers located in Boston, Chicago, St. Louis, and Lexington; the three-month forecast of demand for the distribution centers is as follows:
Transportation cost per unit for the Foster Generators transportation Problem:
Destination Origin Boston Chicago St Louis Lexington Cleveland 3 2 7 6 Bedford 7 5 2 3 York 2 5 4 5
Management would like to determine how much of its production should be shipped from each plant to each distribution center.
Destination Distribution Center
Three-Month Demand Forecast (units) 1 Boston 6000 2 Chicago 4000 3 St. Louis 2000 4 Lexington 1500 Total 13,