This lecture is from Management Science. Key important points are: Case Problem, Foster Generators, Shipment of a Product, Distribution Centers, Production Capacities, Three Month Planning Period, Three Month Production Capacity, Regional Distribution Centers, Three Month Forecast, Foster Generators Transportation

Typology: Study notes

2012/2013

Uploaded on 01/29/2013

devkumar
devkumar 🇮🇳

4.5

(70)

153 documents

1 / 1

Toggle sidebar

This page cannot be seen from the preview

Don't miss anything!

bg1
Case:
Consider a problem faced by Foster Generators. This problem involves the shipment of a product from
three plants to four distribution centers. Foster Generators has plants in Cleveland, Ohio; Bedford,
Indiana; and York, Pennsylvania. Production capacities over the next three-month planning period for one
particular type of generator are as follows:
Origin
Plant
Three-Month Production
Capacity (units)
1
Cleveland
5000
2
Bedford
6000
3
York
2500
Total
13,500
The firm distributes its generators through four regional distribution centers located in Boston, Chicago,
St. Louis, and Lexington; the three-month forecast of demand for the distribution centers is as follows:
Transportation cost per unit for the Foster Generators transportation Problem:
Destination
Origin
Boston
Chicago
St Louis
Lexington
Cleveland
3
2
7
6
Bedford
7
5
2
3
York
2
5
4
5
Management would like to determine how much of its production should be shipped from each plant to
each distribution center.
Is this a transportation problem?
Formulate a linear programming model the same?
Find Basic initial basic feasible solution using Vogel’s Approximation Method?
Find the optimum shipment cost.
Destination Distribution
Center Three-Month Demand
Forecast (units)
1
Boston
2
Chicago
3
St. Louis
4
Lexington
Total
Docsity.com

Partial preview of the text

Download Case Problem - Management Science - Lecture Notes and more Study notes Business Management and Analysis in PDF only on Docsity!

Case:

Consider a problem faced by Foster Generators. This problem involves the shipment of a product from three plants to four distribution centers. Foster Generators has plants in Cleveland, Ohio; Bedford, Indiana; and York, Pennsylvania. Production capacities over the next three-month planning period for one particular type of generator are as follows:

Origin Plant Three-Month Production Capacity (units) 1 Cleveland 5000 2 Bedford 6000 3 York 2500 Total 13,

The firm distributes its generators through four regional distribution centers located in Boston, Chicago, St. Louis, and Lexington; the three-month forecast of demand for the distribution centers is as follows:

Transportation cost per unit for the Foster Generators transportation Problem:

Destination Origin Boston Chicago St Louis Lexington Cleveland 3 2 7 6 Bedford 7 5 2 3 York 2 5 4 5

Management would like to determine how much of its production should be shipped from each plant to each distribution center.

Is this a transportation problem?

Formulate a linear programming model the same?

Find Basic initial basic feasible solution using Vogel’s Approximation Method?

Find the optimum shipment cost.

Destination Distribution Center

Three-Month Demand Forecast (units) 1 Boston 6000 2 Chicago 4000 3 St. Louis 2000 4 Lexington 1500 Total 13,

Docsity.com